SECOND QUARTER REPORT 2016 Barrick Reports Second Quarter 2016 Results

Production Results Financials

SECOND QUARTER REPORT 2016 All amounts expressed in US dollars

Barrick Reports Second Quarter 2016 Results

  • Barrick reported net earnings of $138 million ($0.12 per share), and adjusted net earnings1 of $158 million ($0.14 per share) for the second quarter. Second quarter EBITDA2 was $881 million.

• The company reported revenues of $2.01 billion in the second quarter, and net cash provided by operating activities ("operating cash flow") was $527 million. Barrick generated $274 million in free cash flow3 in the second quarter, marking five consecutive quarters of positive free cash flow.

  • Gold production in the second quarter was 1.34 million ounces at a cost of sales applicable to gold of $1.23 billion, and all-in sustaining costs4 of $782 per ounce.
  • Compared to the first half of 2015, cost of sales applicable to gold has declined by 14 percent to $2.43 billion. Over the same period, we have reduced our all-in sustaining costs4 by 19 percent.
  • For the full year, we expect cost of sales applicable to gold to be in the range of $5.2-$5.5 billion. All-in sustaining cost4 guidance for 2016 has been reduced to $750-$790 per ounce, down from $760-$810 per ounce at the end of the first quarter, and below our original 2016 guidance of $775-$825 per ounce. We continue to expect gold production of 5.0-5.5 million ounces for the year.
  • We have reduced total debt by $968 million year-to-date, and remain on track to achieve our $2 billion debt reduction target for the year.
  • Commercial production has commenced at the Jabal Sayid copper mine in Saudi Arabia. Reflecting this milestone, we have increased our 2016 copper guidance to 380-430 million pounds, up from our original guidance of 370-410 million pounds.

TORONTO, July 27, 2016 — Barrick Gold Corporation (NYSE:ABX)(TSX:ABX) (Barrick or the company) today reported net earnings of $138 million ($0.12 per share) for the second quarter, and adjusted net earnings1 of $158 million ($0.14 per share). Second quarter EBITDA2 was $881 million. Second quarter revenues were $2.01 billion and operating cash flow was $527 million. The company generated $274 million in free cash flow3 in the second quarter, marking five consecutive quarters of positive free cash flow.

Second quarter cost of sales applicable to gold was $1.23 billion, a reduction of 13 percent compared to the prior-year period. Production in the quarter was 1.34 million ounces of gold at all-in sustaining costs4 of $782 per ounce. We continue to expect full-year production of 5.0-5.5 million ounces of gold. We expect cost of sales applicable to gold for 2016 to be in the range of $5.2-$5.5 billion. We have reduced our all-in sustaining cost4 guidance to $750-$790 per ounce, down from our most recent range of $760-$810 per ounce.

Our operations continued to deliver robust performance in the second quarter, demonstrating capital discipline, improved operational efficiency and productivity, and stronger cost management as we target Best-in-Class performance. This is driving growing margins and profitability across the entire business, in support of our overriding objective to grow free cash flow per share. At the same time, we continue to strengthen our balance sheet with nearly $1 billion in debt repayments completed so far this year, or roughly half of our $2 billion debt reduction target for 2016. Lower debt levels have better positioned the company to withstand gold price volatility while setting us up to invest in future growth.

Barrick has the industry's largest gold reserves and resources, with an average reserve grade significantly higher than our peer group average.5 This represents an immense source of value and optionality for the company. Our Growth Group is actively advancing a strategy to grow our free cash flow per share by allocating capital to the opportunities with the best returns. We are pursuing a multi-faceted approach that will optimize the development of our existing reserves and resources, invest in exploration to discover the next major deposit, and assess external opportunities for acquisitions, seed financing, earn-ins, and other partnerships and joint ventures. Ultimately, the investments we make will be focused on growing our free cash flow per share while maintaining strict capital discipline, such that we are continuously upgrading the long-term value of our portfolio. Our existing operations will also contribute to growth by achieving step changes in performance that will drive down our cost structure and expand margins. We will do this by leveraging innovation and new technology, which is a core pillar of our Best-in-Class philosophy.

FINANCIAL HIGHLIGHTS

Second quarter net earnings were $138 million ($0.12 per share) compared to a net loss of $9 million ($0.01 per share) in the prior year period. Adjusted net earnings1 for the second quarter were $158 million ($0.14 per share), compared to $60 million ($0.05 per share) in the prior year period. Higher net earnings reflect a decrease in operating costs, particularly lower fuel and energy prices (even when factoring in fuel hedges above spot prices), favorable foreign exchange movements, reduced royalty expense, and the impact of Best-in-Class initiatives, including lower labor, contractor, and consumable costs, and other operating efficiencies. In addition, earnings benefited from lower exploration, evaluation, and project expenses. The company generated $881 million of EBITDA2 in the second quarter compared to $690 million in the prior year period.

Second quarter revenues were $2.01 billion, compared to $2.23 billion in the prior year period. Operating cash flow in the second quarter was $527 million, compared to $525 million in the second quarter of 2015. Despite lower production as a result of non-core asset sales, operating cash flow remained in line with the prior year period. This was driven by higher gold prices and lower operating costs, as a result of lower energy and fuel costs, combined with lower labor, consumable, and

BARRICK SECOND QUARTER 2016 2 PRESS RELEASE

contractor costs, and improved operating efficiencies driven by Best-in-Class initiatives. These gains were partially offset by an increase in working capital, combined with the impact of higher income taxes paid, compared to the prior year period.

Free cash flow3 for the second quarter was $274 million, marking five consecutive quarters of positive free cash flow. This reflects our driving focus on maximizing free cash flow per share through capital discipline, improved operational efficiency and productivity, and stronger cost management.

RESTORING A STRONG BALANCE SHEET

Strengthening our balance sheet remains a top priority. In 2016, we intend to reduce our total debt by at least $2 billion by drawing on our existing cash balance, and by maximizing free cash flow from operations, as well as potential non-core asset sales.

So far this year, we have reduced our total debt by $968 million, representing approximately half of our debt reduction target for the year.

We will continue to pursue non-core asset sales with discipline, and will only proceed with transactions that make sense for the business, on terms we consider favorable to our shareholders. In this regard, we intend to initiate a process to explore the sale of our 50 percent stake in the KCGM operation in Western Australia.

The company's liquidity position is strong and continues to improve, underpinned by free cash flow generation across the business, and modest near-term debt repayment obligations. At the end of the second quarter, Barrick had a consolidated cash balance of approximately $2.4 billion.6 The company now has less than $150 million7 in debt due before 2018, and about $5 billion of our outstanding debt of $9 billion does not mature until after 2032. Over the medium term, we aim to reduce our total debt to below $5 billion.

OPERATING HIGHLIGHTS AND OUTLOOK

Our over-arching objective as a business is to grow our free cash flow per share. In support of this objective, we are focused on driving industry-leading margins by improving the productivity and efficiency of our operations. This means a continuous, relentless cycle of improvement and innovation, underpinned by our Best-in-Class program. Our aspiration is to achieve all-in sustaining costs below $700 per ounce by 2019.

Barrick produced 1.34 million ounces of gold in the second quarter at a cost of sales of $1.23 billion, compared to 1.45 million ounces at a cost of sales of $1.41 billion in the prior year period. All-in sustaining costs4 in the second quarter were $782 per ounce, compared to $895 per ounce in the second quarter of 2015. Excluding the impact of divested mines, production for the second quarter increased by 126,000 ounces.

Compared to the first half of 2015, cost of sales applicable to gold declined by 14 percent to $2.43 billion, primarily due to fewer ounces sold as a result of divestments. Cost of sales at our remaining operations was in line with the prior-year period, with higher grades and sales volumes offset by a

BARRICK SECOND QUARTER 2016 3 PRESS RELEASE

decrease in direct mining costs. Compared to the first half of 2015, all-in sustaining costs4 have fallen by 19 percent. These reductions reflect decreased direct mining costs, particularly lower fuel and energy prices, reduced royalty expense, and the impact of Best-in-Class initiatives, including lower labor, contractor, and consumable costs, and more predictive and precise maintenance. Lower mine site sustaining capital expenditures and a higher proportion of production from lower cost operations also contributed to lower all-in sustaining costs.

Please see page 31 of Barrick's Second Quarter 2016 Management Discussion and Analysis for individual operating segment performance details.

We continue to expect full-year gold production of 5.0-5.5 million ounces. For the full year, we expect cost of sales applicable to gold to be in the range of $5.2-$5.5 billion. We have reduced our allin sustaining cost4 guidance for 2016 to $750-$790 per ounce, down from $760-$810 per ounce at the end of the first quarter, and below our original 2016 guidance of $775-$825 per ounce. All-in sustaining costs are now expected to be highest in the third quarter, reflecting a shift in the timing of certain sustaining capital expenditures to the second half of the year.

Capital expenditures for 2016 are now expected to be $1.25-$1.40 billion, down from $1.35-$1.55 billion at the end of the first quarter, and below our original 2016 guidance range of $1.35-$1.65 billion.

As we continue to embed Best-in-Class across the portfolio, we expect to identify additional savings opportunities over the course of the year.

Second QuarterCurrentOriginal
Gold20162016 Guidance2016 Guidance
Production8(000s of ounces)1,3405,000-5,5005,000-5,500
Cost of sales applicable to gold ($ millions)1,2275,200-5,500N/A
All-in sustaining costs4($ per ounce)782750-790775-825
Cash costs4($ per ounce)578540-570550-590

Copper

Production8(millions of pounds)103380-430370-410
Cost of sales applicable to copper ($ millions)79275-320N/A
All-in sustaining costs9($ per pound)2.141.95-2.252.05-2.35
C1 cash costs9($ per pound)1.521.35-1.651.45-1.75
Total Capital Expenditures10 ($ millions)2841,250-1,4001,350-1,650

Mine Site Guidance Updates Based on improved operational performance, we now anticipate higher production and lower costs at both Cortez and Turquoise Ridge. Cortez is now expected to produce 980,000-1,050,000 ounces of gold at all-in sustaining costs4 of $520-$550 per ounce, compared to our previous guidance range of 900,000-1,000,000 ounces at all-in sustaining costs of $580-$640 per ounce. At Turquoise Ridge, our share of production is now anticipated to be in the range of 240,000-260,000 ounces of gold at

BARRICK SECOND QUARTER 2016 4 PRESS RELEASE

all-in sustaining costs of $640-$700 per ounce, compared to our previous guidance range of 200,000-220,000 ounces at all-in sustaining costs of $770-$850 per ounce.

Reflecting the impact of severe winter weather conditions in the first half of 2016, we now expect full year gold production at Veladero to be in the range of 580,000-640,000 ounces, down from our previous guidance of 630,000-690,000 ounces. All-in sustaining cost4 guidance remains unchanged at $790-$860 per ounce.

Copper Copper production in the second quarter was 103 million pounds at a cost of sales of $79 million, and all-in sustaining costs9 of $2.14 per pound. The Jabal Sayid project, a 50-50 joint venture with Saudi Arabian Mining Company (Ma'aden), commenced commercial production on July 1. Barrick's share of 2016 copper production from Jabal Sayid is expected to be 10-20 million pounds at all-in sustaining costs of $2.80-$3.10 per pound. The mine is expected to ramp up to a production rate of about 100 million pounds per year in the second half of 2017, as additional underground development is completed.

Reflecting the start of commercial production at Jabal Sayid, we have increased our copper production guidance for 2016 to 380-430 million pounds, up from our original guidance of 370-410 million pounds. For the full year, we expect cost of sales applicable to copper to be in the range of $275-$320 million. Copper all-in sustaining cost9 guidance remains unchanged at $1.95-$2.25 per pound.

In June 2016, the Zambian government passed legislation to amend the royalty tax for mining operations to a variable rate based on the prevailing copper price, effective June 1, 2016. These rates are four percent at copper prices below $2.04; five percent at copper prices between $2.04 and $2.72; and six percent at copper prices of $2.72 and above. Legislation was also passed to remove the 15 percent variable profit tax on income from mining companies. Our 2016 copper guidance takes into consideration the revised royalty rates commencing June 1.

BEST-IN-CLASS IN ACTION

Pueblo Viejo Autoclaves Case Study Applying Creative Thinking and Knowledge to Unlock Potential The key to unlocking the massive refractory ore body at Pueblo Viejo rests within four giant autoclaves—the largest ever used in the gold mining industry. Each autoclave weighs 780 tonnes, and is roughly 38 meters long and six meters in diameter—about as wide as a Boeing 747 fuselage. Improving the availability and throughput of the autoclaves has the potential to unlock substantial value for the mine.

Until recently, each autoclave has required, on average, a 22-day maintenance shutdown every six months. Large metal walls that separate the compartments inside each autoclave begin to fail as a result of the forces generated by continuous agitation of the ore slurry. A buckled or failed wall can interfere with normal operation, damaging the agitator blades and shafts, and accelerating the buildup of scale and sand, thereby requiring frequent maintenance.

BARRICK SECOND QUARTER 2016 5 PRESS RELEASE

Challenging and pushing past technical limits is a critical component of our Best-in-Class philosophy. Faced with this challenge, the team at Pueblo Viejo came up with a plan to increase autoclave availability and throughput by extending the period between maintenance shutdowns— from every six months, to every seven or potentially eight months.

To achieve this, the team applied Barrick's extensive autoclave operating experience to propose a number of critical modifications to the autoclaves. High oxidization rates inside the autoclaves implied the number of interior compartments could be reduced, thereby mitigating the build-up of scale, and the associated maintenance requirements. However, the remaining compartment walls would continue to fail at a similar rate, limiting the potential gains. To solve this problem, the team worked with an engineering partner to develop a new design for the interior compartment walls. The design better integrates the walls into the autoclaves using stronger titanium structure sections, improved bracing, and larger bolts.

The new walls have been successfully installed in two of the mine's four autoclaves. Initial results have been positive, indicating that increased run-time between shutdown maintenance is achievable. If successful in all four autoclaves, this initiative has the potential to increase throughput at Pueblo Viejo by 240,000 tonnes per year (100 percent basis), increasing autoclave availability from 84 percent to 86.5 percent—driving increased production, lower unit costs, and additional free cash flow from the operation. Other benefits include reducing materials cost for autoclave maintenance work (spare parts, valves, and ancillary equipment), and reducing contractor costs, due to fewer shutdowns per year.

Goldstrike Open Pit Haulage Case Study When Challenging Conventional Wisdom Pays Off Over nearly 30 years of managing one of the largest open pit gold mines in the world, conventional wisdom at Goldstrike suggested that the technical limit for open pit haul truck utilization was 79 percent, taking into account the mine runs two open pits seven miles apart. In simple terms, for every hour of potential operating time, the average truck achieved about 48 minutes of productive work time. At the end of 2015, the mine was operating a fleet of 29 Komatsu 930 haul trucks.

Motivated by a desire to challenge conventional wisdom in pursuit of Best-in-Class performance, the open pit team at Goldstrike evaluated how to increase haul truck availability to a level the mine had never achieved. Drawing on other experiences from across the industry, they came up with a concept that allows some haul trucks to be parked, while significantly increasing utilization of the trucks remaining in service. The secret was breaks—but not the brakes on the trucks. Typically, when haul truck drivers at Goldstrike were scheduled to take a break, they simply pulled over in a safe location and enjoyed a rest, usually spent inside the cab of the truck itself. This had trucks idling, rather than engaging in productive work.

Earlier this year, Goldstrike began testing a new system. The mine is in the process of installing a series of modular break rooms at strategic locations around the open pit where drivers can rest. While drivers are on break, relief drivers take over operation of the trucks. In just six months, the results have been impressive: a six percent improvement in haul truck utilization in the open pit,

BARRICK SECOND QUARTER 2016 6 PRESS RELEASE

moving from 79 percent to 85 percent; and six haul trucks taken out of the fleet. Today, the mine is moving the same amount of material in the open pit, with fewer trucks. This initiative, combined with other improvement projects, has helped to reduce open pit mining costs at Goldstrike from $1.40 per tonne at the start of the year to $1.25 per tonne today. The shift to using properly-configured break rooms also increases safety, by promoting a more restful environment for operators.

As often happens, when you remove one bottleneck, other opportunities for improvement present themselves. The open pit team is now evaluating how to further optimize shovel use at the mine, matching the right shovels with the right haulage plans and ore types.

TECHNICAL INFORMATION

The scientific and technical information contained in this press release has been reviewed and approved by Steven Haggarty, P. Eng., Senior Director, Metallurgy of Barrick who is a "Qualified Person" as defined in National Instrument 43-101 – Standards of Disclosure for Mineral Projects.

BARRICK SECOND QUARTER 2016 7 PRESS RELEASE

APPENDIX 1 — Updated 2016 Operating and Capital Expenditure Guidance

GOLD PRODUCTION AND COSTS All-in sustaining Production Cost of sales Cash costs4 costs4 (millions of ounces) ($ millions) ($ per ounce) ($ per ounce)

Cortez 0.980-1.050 520-550 430-450 Goldstrike 0.975-1.075 780-850 560-610 Pueblo Viejo (60%) 0.600-0.650 550-590 420-450 Lagunas Norte 0.410-0.450 580-630 410-450 Veladero 0.580-0.640 790-860 520-570 Sub-total 3.500-3.900 650-700 480-510 Porgera (47.5%) 0.230-0.260 850-960 650-730 Acacia (63.9%) 0.480-0.500 950-980 670-700 KCGM (50%) 0.350-0.365 670-700 610-630 Hemlo 0.215-0.230 800-850 650-690 Turquoise Ridge (75%) 0.240-0.260 640-700 480-520 Golden Sunlight 0.030-0.045 1,080-1,130 990-1,100 Total Gold 5.000-5.50011 5,200-5,500 750-790 540-570

COPPER PRODUCTION AND COSTS All-in sustaining Production Cost of sales C1 cash costs9 costs9 (millions of pounds) ($ millions) ($ per pound) ($ per pound)

Zaldívar (50%) 100-120 2.20-2.40 1.70-1.90 Lumwana 270-290 1.80-2.10 1.20-1.50 Jabal Sayid (50%) 10-20 2.80-3.10 1.90-2.20 Total Copper 380-430 275-320 1.95-2.25 1.35-1.65

CAPITAL EXPENDITURES ($ millions)

Mine site sustaining 1,100-1,200 Project12 150-200 Total Capital Expenditures 1,250-1,400

BARRICK SECOND QUARTER 2016 8 PRESS RELEASE

APPENDIX 2 — 2016 Outlook Assumptions and Economic Sensitivity Analysis

Impact on Impact on Impact on 2016 Guidance Hypothetical Revenue Cost of sales All-in sustaining Assumption Change

(millions)(millions)costs4,9
Gold revenue, net of royalties$1,250/oz+/- $100/oz+/- $258n/a+/- $3/oz
Copper revenue, net of royalties$2.10/lb+/- $0.50/lb+/- $98n/a+/- $0.03/lb

Gold all-in sustaining costs4

Gold royalties & production taxes$1,250/oz+/- $100/ozn/a+/- $8+/- $3/oz
WTI crude oil price13$50/bbl+/- $10/bbln/a+/- $3+/- $1/oz
Australian dollar exchange rate0.73 : 1+/- 10%n/a+/- $14+/- $5/oz
Canadian dollar exchange rate1.30 : 1+/- 10%n/a+/- $16+/- $6/oz

Copper all-in sustaining costs9

WTI crude oil price13$50/bbl+/- $10/bbln/a+/- $2+/- $0.01/lb
Chilean peso exchange rate690 : 1+/- 10%n/a+/- $4+/- $0.02/lb
BARRICK SECOND QUARTER 20169PRESS RELEASE

ENDNOTES

1 "Adjusted net earnings" and "adjusted net earnings per share" are non-GAAP financial performance measures. Adjusted net earnings excludes the following from net earnings: certain impairment charges (reversals), gains (losses) and other one-time costs relating to acquisitions or dispositions, foreign currency translation gains (losses), significant tax adjustments not related to current period earnings and unrealized gains (losses) on non-hedge derivative instruments. The company uses this measure internally to evaluate our underlying operating performance for the reporting periods presented and to assist with the planning and forecasting of future operating results. Barrick believes that adjusted net earnings is a useful measure of our performance because these adjusting items do not reflect the underlying operating performance of our core mining business and are not necessarily indicative of future operating results. Adjusted net earnings and adjusted net earnings per share are intended to provide additional information only and do not have any standardized meaning under IFRS and may not be comparable to similar measures of performance presented by other companies. They should not be considered in isolation or as a substitute for measures of performance prepared in accordance with IFRS. Further details on these non-GAAP measures are provided in the MD&A accompanying Barrick's financial statements filed from time to time on SEDAR at www.sedar.com and on EDGAR at www.sec.gov.

Reconciliation of Net Earnings to Adjusted Net Earnings and Adjusted Net Earnings per Share1

($ millions, except per share amounts in dollars)For the three months ended June 30For the six months ended June 30
2016201520162015
Net earnings (loss) attributable to equity holders of the company$ 138($ 9)$ 55$ 48
Impairment charges related to intangibles, goodwill, property, plant and equipment, and investments435540
Acquisition/disposition (gains)/losses(11)(2)(2)(26)
Foreign currency translation losses233316231
Significant tax adjustments33265432
Other expense adjustments4627428
Unrealized gains on non-hedge derivative instruments(5)3(11)4
Tax effect and non-controlling interest-(28)(52)(35)
Adjusted net earnings$ 158$ 60$ 285$ 122
Net earnings (loss) per share20.12(0.01)0.050.04
Adjusted net earnings per share20.140.050.240.10

1 Amounts presented in this table are pre-tax and non-controlling interest.

2 Calculated using weighted average number of shares outstanding under the basic method of earnings per share.

3 Significant tax adjustments for the current year primarily relate to a tax provision booked by Acacia in Q1 2016.

4 Other expense adjustments for the current year relate to losses on debt extinguishment and the impact of the decrease in the discount rate used to calculate the provision for environmental remediation at our closed mines.

2 "EBITDA" and "adjusted EBITDA" are non-GAAP financial performance measures. EBITDA excludes income tax expense, finance costs, finance income and depreciation from net earnings. Barrick believes that EBITDA is a valuable indicator of our ability to generate liquidity by producing operating cash flow. EBITDA is also frequently used by investors and analysts for valuation purposes. Adjusted EBITDA removes the effect of "impairment charges" which are not reflective of our ability to generate liquidity by producing operating cash flow. EBITDA and adjusted EBITDA are intended to provide additional information only and do not have any standardized meaning under IFRS and may not be comparable to similar measures of performance presented by other companies. They should not be considered in isolation or as a substitute for measures of performance prepared in accordance with IFRS. Further details on these non- GAAP measures are provided in the MD&A accompanying Barrick's financial statements filed from time to time on SEDAR at www.sedar.com and on EDGAR at www.sec.gov.

Reconciliation of Net Earnings to EBITDA and Adjusted EBITDA

($ millions, except per share amounts in dollars)For the three months ended June 30For the six months ended June 30
2016201520162015
Net earnings (loss)$ 176 173 150$ (9)$ 104 359 347$ 80
Income tax expense103208
Finance costs, net1177355

BARRICK SECOND QUARTER 2016 10 PRESS RELEASE

Depreciation382419767840
EBITDA$ 881 4$ 690$ 1,577 5$ 1,483
Impairment charges3540
Adjusted EBITDA$ 885$ 725$ 1,582$ 1,523
Reported as:
Cortez$ 190$ 117$ 402$ 178
$ 402
Goldstrike160100294218
294
Pueblo Viejo193161419367
419
Lagunas Norte96136179281
179
Veladero8793159192
159
Turquoise Ridge46327261
72
Acacia13470210136
210
Other(21)16(153)90
(153)
Impairment charges(4)(35)(5)(40)
(5)
EBITDA$ 881$ 690$ 1,577$ 1,483
$ 1,577
Impairment charges435540
5
Adjusted EBITDA$ 885$ 725$ 1,582$ 1,523
$ 1,582

1 Finance costs exclude accretion.

3 "Free cash flow" is a non-GAAP financial performance measure which excludes capital expenditures from Net cash provided by operating activities. Barrick believes this to be a useful indicator of our ability to operate without reliance on additional borrowing or usage of existing cash. Free cash flow is intended to provide additional information only and does not have any standardized meaning under IFRS and may not be comparable to similar measures of performance presented by other companies. Free cash flow should not be considered in isolation or as a substitute for measures of performance prepared in accordance with IFRS.

Reconciliation of Net Cash Provided by Operating Activities to Free Cash Flow

($ millions)For the three months ended June 30For the six months ended June 30
2016201520162015
2015
Net cash provided by operating activities$ 527$ 525$ 978$ 841
$ 841
Capital expenditures(253)(499)(523)(1,013)
(1,013)
Free cash flow$ 274$ 26$ 455($ 172)
($ 172)

4 "Cash costs" per ounce and "All-in sustaining costs" per ounce are non-GAAP financial performance measures. "Cash costs" per ounce is based on cost of sales but excludes, among other items, the impact of depreciation. "All-in sustaining costs" per ounce begins with "Cash costs" per ounce and adds further costs which reflect the additional costs of operating a mine, primarily sustaining capital expenditures, general & administrative costs and minesite exploration and evaluation costs. Barrick believes that the use of "cash costs" per ounce and "all-in sustaining costs" per ounce will assist investors, analysts and other stakeholders in understanding the costs associated with producing gold, understanding the economics of gold mining, assessing our operating performance and also our ability to generate free cash flow from current operations and to generate free cash flow on an overall company basis. "Cash costs" per ounce and "All-in sustaining costs" per ounce are intended to provide additional information only and do not have any standardized meaning under IFRS. Although a standardized definition of all-in sustaining costs was published in 2013 by the World Gold Council (a market development organization for the gold industry comprised of and funded by 18 gold mining companies from around the world, including Barrick), it is not a regulatory organization, and other companies may calculate this measure differently. These measures should not be considered in isolation or as a substitute for measures prepared in accordance with IFRS. Further details on these non-GAAP measures are provided in the MD&A accompanying Barrick's financial statements filed from time to time on SEDAR at www.sedar.com and on EDGAR at www.sec.gov.

BARRICK SECOND QUARTER 2016 11 PRESS RELEASE

Reconciliation of Gold Cost of Sales to Cash costs per ounce, All-in sustaining costs per ounce and All-in costs per ounce

For the three months ended June 30,For the six months ended June 30,
Footnote2016201520162015
Cost of sales related to gold production$ 1,227$ 1,413$ 2,430$ 2,838
Depreciation(365)(378)(734)(752)
By-product credits1(46)(53)(84)(112)
Realized (gains)/losses on hedge and non-hedge derivatives226275747
Non-recurring items3--(10)-
Other4(6)7(15)15
Non-controlling interests (Pueblo Viejo and Acacia)(90)(100)(175)(212)
Cash costs$ 746$ 916$ 1,469$ 1,824
General & administrative costs8870146137
Minesite exploration and evaluation costs69161625
Minesite sustaining capital expenditures7235361410714
Rehabilitation - accretion and amortization (operating sites)514402576
Non-controlling interest, copper operations and other8(82)(90)(132)(161)
All-in sustaining costs$ 1,010$ 1,313$ 1,934$ 2,615
Project exploration and evaluation and project costs6478195158
Community relations costs not related to current operations3457
Project capital expenditures7494589139
Project capital expenditures
Rehabilitation - accretion and amortization (non-operating sites)53356
Non-controlling interest and copper operations8(15)(11)(31)(15)
All-in costs$ 1,097$ 1,435$ 2,097$ 2,910
Ounces sold - equity basis (000s ounces)101,2921,4662,5982,851
Cash costs per ounce1$ 578$ 624$ 565$ 640
Cash costs per ounce (on a co-product basis)19$ 605$ 648$ 591$ 666
All-in sustaining costs per ounce1$ 782$ 895$ 744$ 918
All-in sustaining costs per ounce (on a co-product basis)19$ 809$ 919$ 770$ 944
All-in costs per ounce1$ 849$ 978$ 807$ 1,021
All-in costs per ounce (on a co-product basis)19$ 876$ 1,002$ 833$ 1,047

1 Cash costs per ounce, all-in sustaining costs per ounce and all-in costs per ounce may not calculate based on amounts presented in this table due to rounding. 1 Other sales Revenues include the sale of by-products for our gold and copper mines for the three months ended June 30, 2016, of $32 million (2015: $33 million) and the six months ended June 30, 2016 of $60 million (2015: $74 million); energy sales from the Monte Rio power plant at our Pueblo Viejo Mine for the three months ended June 30, 2016, of $14 million (2015: $20 million) and the six months ended June 30, 2016, of $24 million (2015: $38 million).

2 Realized (gains)/losses on hedge and non-hedge derivatives Includes realized hedge losses of $20 million and $44 million (2015: $21 million and $42 million, respectively) for the three and six months ended June 30, 2016, respectively, and realized non-hedge losses of $6 million and $13 million (2015: $6 million and $5 million, respectively) for the three and six months ended June 30, 2016, respectively. Refer to Note 5 of the Financial Statements for further information.

3 Non-recurring items Non-recurring items consist of $10 million in abnormal costs at Veladero. These costs are not indicative of our cost of production and have been excluded from the calculation of cash costs.

4 Other Other adjustments include adding the net margins related to power sales at Pueblo Viejo of $2 million and $4 million, respectively, (2015: $5 million and $10 million, respectively) and adding the cost of treatment and refining charges of $4 million and $9 million, respectively (2015: $3 million and $6 million, respectively). 2016 includes the removal of costs associated with our Pierina mine which is mining incidental ounces as it enters closure of $12 million and $28 million, respectively.

5 Rehabilitation - accretion and amortization Includes depreciation on the assets related to rehabilitation provisions of our gold operations and accretion on the rehabilitation provision of our gold operations, split between operating and non-operating sites.

BARRICK SECOND QUARTER 2016 12 PRESS RELEASE