Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

ABX.TO ·

Feasibility Study on Lumwana Super Pit Expansion Expected by Year-End

Economic Studies

NEWS RELEASE

All amounts expressed in US dollars

Feasibility Study on Lumwana Super Pit Expansion Expected

by Year-End

Toronto, September 11, 2024 – Barrick Gold Corporation (NYSE:GOLD) (TSX:ABX) – The feasibility study for

the expansion of Barrick’s Lumwana mine in Zambia is expected to be completed by the end of the year, paving

the way for construction to start in 2025 the company said today.

Speaking during a webinar focused on updating the market on the Lumwana Super Pit Expansion Project, Barrick

president and chief executive Mark Bristow said the expansion unlocks the potential to transform the Lumwana

mine into a long-life, high yielding, Top 25 copper producer1 and a Tier One2 copper mine, capable of contending

with the volatility of the copper demand cycles.

The expansion involves first doubling throughput by twinning the existing process circuit and then by significantly

increasing mining volumes. Plant throughput will grow from the current 27Mt to 52Mt, doubling the mine’s annual

copper production from 120kt to a life-of-mine average of 240kt per annum3. The process expansion is supported

by a ramp up of total mining volumes , which are planned to increase incrementally year-on-year, from 150Mt in

2024 to approximately 240Mt in 2028 and then to an average rate of 290Mt per annum from 2030 onwards1,4.

Chief Operating Officer for Africa and Middle East Sebastiaan Bock said: “The phased ramp- up will enable a

competitive cost profile over the life of the mine and annual operating cash flow and free cash flow5 are projected

to improve by as much as 85% and 60%, respectively, based on the long-t erm copper price consensus.

These production and cost improvements will contribute to an estimated incremental net present value

(NPV8) of $1.7 billion 1.”

At a flat long term average copper price consensus of $4.13/lb, Barrick estimates that the project will deliver an

incremental IRR (Internal Rate of Return) of 20%6 and a total mine IRR of more than 50%6, paying back the initial

expansion capital in approximately two years after completion of the expansion. Post -expansion, cost of sales

and C1 cash costs7 are estimated at approximately $2.36/lb and $1.85/lb, respectively, placing Lumwana in the

first quartile of the industry, excluding the benefit of any byproducts.

According to Mineral Resource Management and Evaluation Executive Simon Bottoms , the process plant

engineering has matured to a point that has allowed Barrick to select major equipment vendors and place orders

for long lead equipment, including both mills and crushers. “We are starting detailed engineering works this quarter

and expanding our onsite accommodation while building partnerships with key suppliers and contractors ahead of

the pre-construction ground preparation works, which are scheduled to start next year,” said Bottoms.

Commissioning of the new process plant is planned to start in the second half of 2027. Once the new process

circuit is commissioned, the existing circuit will undergo a series of planned shutdowns, allowing Barrick to install

upgrades, while ensuring uninterrupted copper delivery throughout the expansion.

The permitting process for the expansion is well underway, with the Environmental and Social Impact Assessment

already submitted to the Zambian authorities and approval expected by the end of this year.

BARRICK GOLD CORPORATION NEWS RELEASE

Barrick enquiries

Investor and media relations

Kathy du Plessis

+44 20 7557 7738

Email: [email protected]

Website: www.barrick.com

Techni

cal Information

The scientific and technical information contained in this press release has been reviewed and approved by Richard Peattie, M Phil,

FAusIMM, Mineral Resources Manager: Africa and Middle East; Simon Bottoms, CGeol, MGeol, FGS, FAusIMM, Mineral Resource

Management and Evaluation Executive; John Steele, CIM, Metallurgy, Engineering and Capital Projects Executive; and Joel Holliday,

FAusIMM, Executive Vice-President, Exploration—each a “Qualified Person” as defined in National Instrument 43- 101 - Standards

of Disclosure for Mineral Projects.

Endnotes

1 Financial metrics and production metrics are based upon Barrick's internal pre-feasibility study which is conceptual in nature

because it includes mineral resources that are not yet categorized as mineral reserves, and there is no certainty that the pre-

feasibility assessment will be realized. These metrics are subject to change upon completion of the feasibility study. The

assumptions outlined within the pre-feasibility study assessment have formed the basis for the ongoing study and were made by

a Qualified Person. The Qualified Person will evaluate the results of the completed feasibility study before determining whet her

all or a part of the mineral resource for the Super Pit Expansion Project may be converted to a mineral reserve.

2 A Tier One Copper Asset is an asset with a $3.00/lb reserve with potential for 5 million tonnes or more of contained copper to

support a minimum 20-year life, annual production of at least 200ktpa, with all -in sustaining costs per pound in the lower half of

the industry cost curve. Tier One Assets must be located in a world class geological district with potential for organic reserve

growth and long-term geologically driven addition.

3 Life of Mine Plan mined tonnes, grade and ounces and financials are based on the pre- feasibility study but are conceptual in

nature due to using mineral resources and are subject to change with completion of the feasibility study which is anticipated for

Q4 2024.

4 The results in this press release represent forward-looking information and are based on Barrick’s internal pre-feasibility study for

the Super Pit. These results are based on mineral resources only and depend on inputs that are subject to a number of know n

and unknown risks, uncertainties and other factors that may cause actual results to differ materially from those presented here.

Barrick is in the process of completing a feasibility study in respect of the Super Pit, the results of which may differ from the figures

disclosed in this press release. Barrick does not currently identify Lumwana as a material property. Barrick expects to re-evaluate

Lumwana’s status as a potential material property following the completion of the feasibility study for the Super Pit Expansi on

Project and the preparation of updated mineral reserves and resources estimates for Lumwana as of December 31, 2024. A

Technical Report will be prepared in accordance with Form 43-101F1 and filed on SEDAR+ within 45 days of the disclosure of

the results of the feasibility study if Lumwana is classified as a material property.

5 “Free cash flow” is a non -GAAP financial performance measure which deducts capital expenditures from net cash provided by

operating activities. Management believes this to be a useful indicator of our ability to operate without reliance on additio nal

borrowing or usage of existing cash. Free cash flow is intended to provide additional information only and does not have any

standardized definition under IFRS and should not be considered in isolation or as a substitute for measures of performance

prepared in accordance with IFRS. Other companies may calculate this measure differently. Further details including a detailed

reconciliation of this non-GAAP financial measure to its most directly comparable GAAP measure are incorporated by reference

and provided on page 59 of the MD&A that accompanies Barrick’s second quarter 2024 financial statements, respectively, filed

on SEDAR+ at www.sedarplus.ca and on EDGAR at www.sec.gov.

6 All financial metrics are estimated based upon CIBC Global Mining Group mean long-term consensus forecast copper price of

$4.13/lb. Refer to the below table for the complete list of Barrick’s outlook assumptions.

Key Outlook Assumptions 2024 2025 2026+

Gold Price ($/oz) 1,900 1,300 1,300

Copper Price ($/lb) 3.50 3.00 3.00

Oil Price (WTI) ($/barrel) 80 70 70

AUD Exchange Rate (AUD:USD) 0.75 0.75 0.75

ARS Exchange Rate (USD:ARS) 800 800 800

CAD Exchange Rate (USD:CAD) 1.30 1.30 1.30

CLP Exchange Rate (USD:CLP) 900 900 900

EUR Exchange Rate (EUR:USD) 1.10 1.20 1.20

BARRICK GOLD CORPORATION NEWS RELEASE

7 “C1 cash costs” per pound is a non-GAAP financial measure. “C1 cash costs” per pound is based on cost of sales but excludes

the impact of depreciation and royalties and includes treatment and refinement charges. Management believes that the use of

“C1 cash costs” per pound will enable investors to better understand the operating performance of our copper mines as this

measure reflects all of the sustaining expenditures incurred in order to produce copper. “C1 cash costs” per pound is intende d

to provide additional information only and does not have a standardized definition under IFRS and should not be considered in

isolation or as a substitute for measures of performance prepared in accordance with IFRS. Other companies may calculate

this measure differently. Further details including a detailed reconciliation of this non-GAAP financial measure to its most directly

comparable GAAP measure are incorporated by reference and provided on pages 72-73 of the MD&A accompanying Barrick’s

second quarter 2024 financial statements filed on SEDAR+ at www.sedarplus.ca and on EDGAR at www.sec.gov.

Cautionary Statement on Forward-Looking Information

Certain information contained in this press release, including any information as to our strategy, projects, plans or future financial or

operating performance, constitutes “forward-looking statements”. All statements, other than statements of historical fact, are forward-

looking statements. The words “would”, “will”, “projected”, “estimated”, “starting”, “planned”, “expand”, “expect” “growth”, “scheduled”

and similar expressions identify forward-l ooking statements. In particular, this press release contain s forward -looking statements

including, without limitation, with respect to: Barrick’s Lumwana Super Pit expansion project and its ability to extend Lumwana’s life of

mine; global projected copper production and demand profiles; the potential for Lumwana to become a Tier One asses, and the

potential for Lumwana to become a top 25 copper asset; estimated copper production from the Lumwana Super Pit expansion,

including projected mining rates; the financial performance of the Lumwana Super Pit expansion; the estimated capital budget for the

Lumwana Super Pit expansion, including anticipated capital intensity, investment spend and targeted run rates; anticipated timelines

for delivery of the feasibility study, project construction and key execution timeframes for the Lumwana Super Pit expansion; estimated

timing for approval of the Environmental and Social Impact Assessment at Lumwana; Barrick’s strategy, plans, targets and goals in

respect of environmental and social governance issues, including local community development and, climate change initiatives;

and expectations regarding future price assumptions, financial performance and other outlooks or guidance.

Forw

ard-looking statements are necessarily based upon a number of estimates and assumptions including material estimates and

assumptions related to the factors set forth below that, while considered reasonable by the Company as at the date of this press

release in light of management’s experience and perception of current conditions and expected developments, are inherently subject

to significant business, economic and competitive uncertainties and contingencies. Known and unknown factors could cause actu al

results to differ materially from those projected in the forward-l ooking statements and undue reliance should not be placed on such

statements and information. Such factors include, but are not limited to: fluctuations in the spot and forward price of gold, copper or

certain other commodities (such as silver, diesel fuel, natural gas and electricity); the potential to convert all or part of the mineral

resource for the Super Pit expansion into a mineral reserve following the completion of the feasibility s tudy; risks associated with

projects in the early stages of evaluation and for which additional engineering and other analysis is required; risks related to the

possibility that future exploration results will not be consistent with the Company’s expectations, that quantities or grades of reserves

will be diminished, and that resources may not be converted to reserves; risks associated with the fact that certain of the initiatives

described in this press release are still in the early stages and may not materialize; changes in mineral production performance,

exploitation and exploration successes; risks that exploration data may be incomplete and considerable additional work may be

required to complete further evaluation, including but not limited to drilling, engineering and socioeconomic studies and investment;

the speculative nature of mineral exploration and development; lack of certainty with respect to foreign legal systems, corruption and

other factors that are inconsistent with the rule of law; disruption of supply routes which may cause delays in construction and mining

activities, including disruptions in the supply of key mining inputs due to the invasion of Ukraine by Russia and conflicts in the Middle

East; risk of loss due to acts of war, terrorism, sabotage and civil disturbances; risks associated with artisanal and illegal mining;

changes in national and local government legislation, taxation, controls or regulations and/or changes in the administration of laws,

policies and practices; expropriation or nationalization of property and political or economic developments in Zambia or other countries

in which Barrick does or may carry on business in the future; risks relating to political instability in certain of the juris dictions in which

Barrick operates; timing of receipt of, or failure to comply with, necessary permits and approvals; non-renewal of or failure to obtain

key licenses by governmental authorities; failure to comply with environmental and health and safety laws and regulations; increased

costs and physical and transition risks related to climate change, including extreme weather events, resource shortages, emer ging

policies and increased regulations relating to greenhouse gas emission levels, energy efficiency and reporting of risks; Barrick’s ability

to achieve its sustainability goals; contests over title to properties, particularly title to undeveloped properties, or over access to water,

power and other required infrastructure; the liability associated with risks and hazards in the mining industry, and the ability to maintain

insurance to cover such losses; damage to the Company’s reputation due to the actual or perceived occurrence of any number of

events, including negative publicity with respect to the Company’s handling of environmental matters or dealings with community

groups, whether true or not; risks related to operations near communities that may regard Barrick’s operations as being detri mental

to them; litigation and legal and administrative proceedings; operating or technical difficulties in connection with mining or development

activities, including geotechnical challenges, tailings dam and storage facilities failures, and disruptions in the maintenance or provision

of required infrastructure and information technology systems; increased costs, delays, suspensions and technical challenges

associated with the construction of capital projects; risks associated with working with partners in jointly controlled assets; risks related

to disruption of supply routes which may cause delays in construction and mining activities; risks associated with Barrick’s

infrastructure, information technology systems and the implementation of Barrick’s technological initiatives, including risks related to

cybersecurity incidents, including those caused by computer viruses, malware, ransomware and other cyberattacks, or similar

information technology system failures, delays and/or disruptions; risks related to competition in the mining industry; employee

relations including loss of key employees; availability and increased costs associated with mining inputs and labor; and risks

associated with diseases, epidemics and pandemics. In addition, there are risks and hazards associated with the business of mineral

BARRICK GOLD CORPORATION NEWS RELEASE

exploration, development and mining, including environmental hazards, industrial accidents, unusual or unexpected formations,

pressures, cave -ins, flooding and gold bullion, copper cathode or gold or copper concentrate losses (and the risk of inadequate

insurance, or inability to obtain insurance, to cover these risks).

Many of

these uncertainties and contingencies can affect our actual results and could cause actual results to differ material ly from

those expressed or implied in any forward-looking statements made by, or on behalf of, us. Readers are cautioned that forward -

looking statements are not guarantees of future performance. All of the forward-looking statements made in this press release are

qualified by these cautionary statements. Specific reference is made to the most recent Form 40-F/Annual Information Form o n file

with the SEC and Canadian provincial securities regulatory authorities for a more detailed discussion of some of the factors underlying

forward-looking statements and the risks that may affect Barrick’s ability to achieve the expectations set forth in the forward-looking

statements contained in this press release.

Barri

ck disclaims any intention or obligation to update or revise any forward-looking statements whether as a result of new information,

future events or otherwise, except as required by applicable law.