Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

ABRA.TO ·

AbraPlata reports latest drill results for the Fantasma Mineralized Zone at the Diablillos Project in Argentina

Drill Results

AbraPlata reports latest drill results for the Fantasma

Mineralized Zone at the Diablillos Project in Argentina

BUENOS AIRES – October 19, 2017, - AbraPlata Resource Corp. (TSX.V:ABRA; OTCQB: ABBRF; Frankfurt:

1AH) ("AbraPlata" or the "Company" ) is pleased to report results of the latest drill results from the

Fantasma Mineralized Zone on its Diablillos property in northwestern Argentina.

Hole DDH-17-1 52, which was collared 130m WSW of hole D DH-17-128 ( the first hole of the current

campaign and sub ject of news release dated August 1, 2017) , intersected 89.6g/t Ag over 9 m (from

109m – 118m down the hole), including 227.0g/t Ag over 2m (from 112m – 114m). Drilling to date at

Fantasma has indicated mineralization and alteration over a 400m zone oriented along a WNW trend. A

high grade core (~100 -150g/t Ag) manifests itself in the SE half of this zone (Figure 1) and appears to

have a strike of some 200m (Figure 1) and a width of about 30m (Figure 2). This high grade core is open

to the ESE towards the Oculto deposit some 600m to the E of the Fantasma Zone, and the higher grade

core seems to plunge down below lower grade mineralization (30-60 g/t Ag) towards the WNW.

“These results have been sent to RPA Inc of Toronto for inclusion in the PEA which is currently

underway,” commented AbraPlata’s Executive C hairman, Hernan Zaballa. “Moreover, we plan to

continue to drill-off mineralization towards the ESE at Fantasma, before moving the rig to the other

satellite deposits on the property”.

Sampling Procedures & Quality Control Protocols

AbraPlata applies industry standard exploration methodologies and techniques, and all drill core

samples are collected under the supervision of the Company’s geologists in accordance with industry

practices. Drill core is transported from the drill platform to the logging facility where drill data is

compared and verified with the core in the trays. Thereafter , it is logged, photographed, and split by

diamond saw prior to being sampled. Samples are then bagged , and quality control materials are

inserted at regula r intervals; these include blanks and certified reference materials as well as duplicate

core samples which are collected in order to measure sample representivity. Groups of samples are

then placed in large bags which are sealed with numbered tags in ord er to maintain a chain -of-custody

during the transport of the samples from the project site to the laboratory.

All samples are received by the SGS offices in Salta who then dispatch t he samples to the SGS

preparation facility in San Juan. From there, the prepared samples are sent to the SGS laboratory in

Lima, Peru where they are analyzed. All samples are analyzed using a multi -element technique

consisting of a four acid digestion followed by ICP/AES detection, and gold is analyzed by 50g Fire Assay

with an AAS finish. Silver results greater than 100g/t are reanalyzed using four acid digestion with an

ore grade AAS finish.

An independent party has been appointed to review and report on the QA/QC program at the project.

Qualified Person

Willem Fuchter, PhD P Geo, President & CEO of AbraPlata Resource Corp. and a qualified person as

defined by National Instrument 43 -101 Standards of Disclosure for Mineral Projects, has reviewed and

approved the scientific and technical information contained in this news release.

About AbraPlata

Abraplata is a junior mining exploration company focused on delivering shareholder returns by

unlocking mineral value in Argentina. The Company's experienced management team has assembl ed an

outstanding portfolio of gold, silver and copper exploration assets, and is foc used on advancing its

flagship Diablillos property , with an indicated resource of 81.3m oz Ag and 755k oz Au, through the

various stages of feasibility. In addition, AbraPlata owns the highly prospective Cerro Amarillo property

with its cluster of five mineralized Cu -(Mo-Au) porphyry intrusions located in a mining camp hosting the

behemoth El Teniente, Los Bronces, and Los Pelambres porphyry Cu-Mo deposits. Further exploration

work is also planned for the Company’s Samenta porphyry Cu -Mo property south of First Quantum’s

TacaTaca project as well as its Aguas Perdidas Au-Ag epithermal property.

ON BEHALF OF THE BOARD

ABRAPLATA RESOURCE CORP.

"Willem Fuchter"

Willem Fuchter

President & Chief Executive Officer

For further information concerning this news release, please contact:

Willem Fuchter Karl Cahill

President & Chief Executive Officer VP Investor Relations

AbraPlata Resource Corp. AbraPlata Resource Corp

Tel: +54.11.5258.0920 Tel: +1.858.531.6100

E-mail: [email protected] Email: [email protected]

This news release includes certain "forward-looking statements" under applicable Canadian securities

legislation. Forward-lo oking statements are necessarily based upon a number of estimates and

assumptions that, while considered reasonable, are subject to known and unknown risks, uncertainties,

and other factors which may cause the actual results and future events to differ mat erially from those

expressed or implied by such forward -looking statements. All statements that address future plans,

activities, events or developments that the Company believes, expects or anticipates will or may occur

are forward -looking information. There can be no assurance that such statements will prove to be

accurate, as actual results and future events could differ materially from those anticipated in such

statements. Accordingly, readers should not place undue reliance on forward-looking statement s. The

Company disclaims any intention or obligation to update or revise any forward-looking statements,

whether as a result of new information, future events or otherwise, except as required by law.

Neither the TSX Venture Exchange nor its Regulation Serv ices Provider (as that term is defined in the

policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

For further information about AbraPlata and its projects, please visit the Company’s website at

www.abraplata.com.