Arbor Metals Unveils Fully Funded, Multi-Phase 2024 Exploration Program FOR Jarnet Lithium Project, Quebec, Canada
NEWS RELEASE
ARBOR METALS UNVEILS FULLY FUNDED, MULTI-PHASE 2024 EXPLORATION PROGRAM FOR
JARNET LITHIUM PROJECT, QUEBEC, CANADA
Vancouver, Canada – January 28, 2024 – Arbor Metals Corp. (“ Arbor” or the “ Company”) (TSXV: ABR,
FWB: 432) is pleased to announce the comprehensive details of its fully funded, multiphase 2024
exploration program for the Jarnet Lithium Project. Situated in the Eeyou-Istchee Baie James Territory
territory of Quebec, adjoining Patriot Battery Metals’ Corvette Lithium Project.
Phase 1: Ground Magnetometer Survey (Commencing February 2024)
The first phase of the program involves a ground magnetometer survey covering approximately 225 line
kilometers. This survey aims to identify and map magnetic contrasts helping to locate pegmatite intrusions
and structural patterns controlling their emplacement. In the Corvette area, a pegmatite event is the
primary host rock for spodumene mineralization, which intrude the country mafic rocks. With well-
maintained winter roads providing excellent access to the claims, this survey is set to commence in
February 2024.
Phase 2: Prospecting and C-Horizon Soil Sampling (Scheduled for Summer 2024)
The second phase is a prospecting and C-horizon soil sampling program, targeting deeper samples.
Helicopter support will facilitate the execution of this phase, considering the extensive size of the project.
Information gathered from this phase, in conjunction with ground geophysical data, will play a pivotal role
in refining diamond drilling targets. The prospecting program is slated for early Summer 2024.
Phase 3: Diamond Drilling (Fall 2024)
Anticipated to commence in the fall of 2024, the third phase involves diamond drilling. While road access
is expected to be available, the vastness of Arbor’s holdings makes helicopter support a feasible option.
Permitting activities are scheduled for the summer, and the Company plans to drill up to 14 holes, each
at a depth of 200 meters, with an estimated cost of approximately $1.2 million.
Mark Ferguson, President of Arbor, expressed his enthusiasm about the exploration program, stating,
"Our 2024 exploration program is a testament to our commitment to unlocking the full potential of the
Jarnet Lithium Project. The multiphase approach, coupled with advanced survey techniques, reflects our
dedication to informed and strategic exploration."
Arbor emphasizes its commitment to working collaboratively with local communities and indigenous
groups throughout the exploration process. The Company prioritizes sustainable and responsible
environmental practices, ensuring that its operations adhere to the highest industry standards.
Qualified Person
Martin Demers, P. Geo registered in the Provinces of Québec (ogq #770), a consultant to Arbor and a
qualified person under National Instrument 43-101 – Standards of Disclosure for Mineral Projects , has
reviewed the technical contents of this news release and has approved the disclosure of the technical
information contained herein.
Incentive Stock Option Grant
The Company also announces that it has granted 1,000,000 incentive stock options to the directors and
officers of the Company. The options vest upon grant and are exercisable at a price of $1.00 until January
29, 2025.
About Arbor Metals Corp.
Arbor Metals Corp. is a mining exploration company focused on developing high-value, geographically
significant mineral projects worldwide. Arbor is paving the way for advanced mineral exploration as it
oversees world-class mining projects. The Company is confident that combining quality projects with
proven strategies and a dedicated team will yield exceptional outcomes.
The Jarnet lithium project, located in the James Bay region of Quebec, comprises 47 map-designated claims,
covering an area of approximately 3,759 hectares. The Jarnet project is contiguous to the Corvette-FCI
property, where diamond drilling has confirmed significant lithium mineralization representing one of the
highest-profile lithium exploration projects in the sector.
For further information, contact Mark Ferguson, Chief Executive Officer, at [email protected],
or 403.852.4869, or visit the Company’s website at www.arbormetalscorp.com.
On behalf of the Board,
Arbor Metals Corp.
Mark Ferguson, Chief Executive Officer
Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in policies
of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.
This news release may contain certain “Forward-Looking Statements” within the meaning of the United
States Private Securities Litigation Reform Act of 1995 and applicable Canadian securities laws. When or
if used in this news release, the words “anticipate”, “believe”, “estimate”, “expect”, “target, “plan”,
“forecast”, “may”, “schedule” and similar words or expressions identify forward-looking statements or
information. These forward-looking statements or information may relate to the development of the
Jarnet Lithium Project, and other factors or information. Such statements represent the Company’s current
views with respect to future events and are necessarily based upon a number of assumptions and estimates
that, while considered reasonable by the Company, are inherently subject to significant business,
economic, competitive, political and social risks, contingencies and uncertainties. Many factors, both
known and unknown, could cause results, performance, or achievements to be materially different from
the results, performance or achievements that are or may be expressed or implied by such forward-looking
statements. The Company does not intend, and does not assume any obligation, to update these forward-
looking statements or information to reflect changes in assumptions or changes in circumstances or any
other events affecting such statements and information other than as required by applicable laws, rules
and regulations.