Arbor Metals Plans Exploration at Miller’S Crossing Lithium Project, BIG Smoky Valley, Nevada
NEWS RELEASE
ARBOR METALS PLANS EXPLORATION AT MILLER’S CROSSING
LITHIUM PROJECT, BIG SMOKY VALLEY, NEVADA
Vancouver, Canada – February 21ST, 2022 – Arbor Metals Corp. (the “Company”) (TSXV: ABR, FWB: 432)
has commenced planning of an exploration program for spring 2022 at its Miller’s Crossing Lithium Project
in Big Smoky Valley, Nevada. The Company’s technical team, along with independent third-party experts,
are reviewing historic results from previous exploration in the area that have confirmed the presence of
enriched lithium within claystone. The Company plans to confirm whether certain lithium baring
claystone trends run through the Project by using geological mapping, ground geophysics and
geochemistry.
Significant concentrations of lithium (and other metals) in clays, or claystone in closed basins, have long
been known and explored in many parts of the world. Within a 40-kilometre radius of the Miller's Crossing
Project, seven other lithium claystone projects are being actively advanced. Located 18 kilometres to the
east, America Lithium's TLC project located in the Big Smoky Valley basin has established a resource in
claystone in the richly mineralized Esmeralda lithium district. The Miller's Crossing Project has excellent
potential to host lithium claystone mineralization that previously was overlooked and not tested for.
*Company management cautions the reader that past results or discoveries on properties in proximity to the
Company’s properties are not necessarily indicative of the presence of similar mineralization on the Company’s
properties.
Dr. Peter Born, P.Geo., is the designated qualified person as defined by National Instrument 43-101 and
is responsible for, and has approved, the technical information contained in this release.
Arbor Metal Corp . is a mining exploration company specializing in the development of high-value,
geographic significant mineral projects around the world. As industry leaders, we are paving the way for
advanced mineral exploration as we oversee world-class mining projects. We believe quality projects,
combined with proven strategies and a professional team will deliver superior results. We hold three
exceptional mineral projects.
The Miller’s Crossing Lithium Project, comprised of approximately 3800 acres of contiguous placer claims,
located in the Big Smoky Valley, Esmeralda County, Nevada. The Big Smoky Valley is located immediately
north of the Clayton Valley, home to Albemarle’s Silver Peak Lithium Brine Mine (in continuous operation
since 1967.)
Jarnet Lithium Project, located in the James Bay Region of Quebec, which comprises of forty-seven map
designated claims, covering an area of approximately 2430 hectares. The Jarnet project is contiguous to
the Corvette-FCI Property, where diamond drilling has confirmed significant lithium mineralization; hole
(CF21-001) returned a 146.8 m interval of near continuous pegmatite, assaying 0.93% Li 2O and 114 ppm
Ta2O5, including1.09% Li2O and 108 ppm Ta2O5 over 73.0 m, and 1.04% Li2O and 145 ppm Ta2O5 over 54.6
m. This interval returned numerous samples over 2.0% Li2O, including a peak assay of 4.16% Li2O and 233
ppm Ta2O5 over 1.01 m. (November 29, 2021)
- 2 -
The Rakounga Gold Project consists of an exploration permit covering a two-hundred-and-fifty square
kilometer area located along the Goren Greenstone Belt in central Burkina Faso. The Company, through
its wholly owned subsidiary Kruger Gold Corp. (“Kruger”), holds the right to acquire up to a one-hundred
percent interest in and to the Project, subject only to pre-existing royalty obligations. Kruger has control
over operations conducted on the Project and will look to expand on historical drilling and survey work
conducted on the Project.
For further information, contact Mark Ferguson, Chief Executive Officer, at [email protected], or
visit the Company’s website at www.arbormetalscorp.com.
On behalf of the Board,
Arbor Metals Corp.
Mark Ferguson, Chief Executive Officer
Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in policies
of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.
This news release may contain certain “Forward-Looking Statements” within the meaning of the United
States Private Securities Litigation Reform Act of 1995 and applicable Canadian securities laws. When or
if used in this news release, the words “anticipate”, “believe”, “estimate”, “expect”, “target, “plan”,
“forecast”, “may”, “schedule” and similar words or expressions identify forward-looking statements or
information. These forward-looking statements or information may relate to the development of the
Miller Crossing Lithium Project and other factors or information. Such statements represent the
Company’s current views with respect to future events and are necessarily based upon a number of
assumptions and estimates that, while considered reasonable by the Company, are inherently subject to
significant business, economic, competitive, political and social risks, contingencies and uncertainties.
Many factors, both known and unknown, could cause results, performance, or achievements to be
materially different from the results, performance or achievements that are or may be expressed or implied
by such forward-looking statements. The Company does not intend, and does not assume any obligation,
to update these forward-looking statements or information to reflect changes in assumptions or changes
in circumstances or any other events affecting such statements and information other than as required by
applicable laws, rules and regulations.