Arbor Metals Outlines Progress at Jarnet Lithium Project, James BAY, Quebec, Canada
NEWS RELEASE
ARBOR METALS OUTLINES PROGRESS AT JARNET LITHIUM PROJECT,
JAMES BAY, QUEBEC, CANADA
Vancouver, Canada – October 23rd, 2022 – Arbor Metals Corp. (the “Company”) (TSXV: ABR,
FWB: 432) announces an update on, and near, its Jarnet Lithium Project located in the James Bay region
of Quebec, which is contiguous to Patriot Battery Metals Inc.’s (PEMET) high profile Corvette-FCI property,
where diamond drilling has confirmed significant lithium mineralization.
The Company’s Jarnet Lithium Project, comprises two claim blocks totaling 47 map-designated claims,
covering an area of approximately 2,584 hectares, both contiguous and north of the Corvette-FCI
property. The “Northeast Block” is underlain by the La Grande Greenstone Belt, the same host rock that
hosts PMET’s lithium mineralization and also host multiple other mineral showings and occurrences in the
region. The “Northeast Block” is contiguous with PMET’s Corvette-FCI property on the west, south and
east borders, and surrounds the “North Area” of Spod Lithium Corp (SPOD) which forms part of the SPOD’s
recent acquisition of its “Lithium Grande 4 properties. In a recent press release (SPOD October6, 2022)
SPOD reports that satellite imagery interpretation by Japosat Satellite Mapping ("Japosat") of Montreal,
Quebec on their “North Area” claims that “whitish rock outcrops and boulders that might be of pegmatite
granite composition are mainly located in the southwest part of the north block of claims. The highest
concentration of outcrops, sub crops and boulders seem to be spatially oriented within west-east structure
about 1000 metres long and 200 meters width. A few small outcrops seem to have a preferred SW-NE
orientation and dyke-like shapes.” These interpreted features would be very close and on-trend with the
central portion of the Company’s “Northeast Block.” The Company is reviewing Google Earth and satellite
imagery to investigate similar features on the “Northeast Block”.
Note: Company management cautions the discoveries and observations on properties in proximity to the
Company's properties are not necessarily indicative of the presence of similar mineralization or geology on
the Company's properties.
Sampling from the Company’s earlier site visit are in the lab and are being analyzed, and results are
pending. Ninety rocks were obtained during the summer from the Company’s Jarnet Lithium Project, with
many samples from previously unmapped pegmatite dykes. Upon receipt of assays the Company will
incorporate all sample results, geophysical data, assessment file information and satellite imagery to the
next phase of exploration on the Jarnet Project.
Dr. Peter Born, P.Geo., is the designated qualified person as defined by National Instrument 43-101 and
is responsible for, and has approved, the technical information contained in this release.
Arbor Metals Corp . is a mining exploration company specializing in the development of high-value,
geographic significant mineral projects around the world. As industry leaders, we are paving the way for
advanced mineral exploration as we oversee world-class mining projects. We believe quality projects,
combined with proven strategies and a professional team will deliver superior results. We hold three
exceptional mineral projects.
- 2 -
Jarnet Lithium Project, located in the James Bay Region of Quebec, which comprises of forty-seven map
designated claims, covering an area of approximately 2584 hectares. The Jarnet Project is contiguous to
the Corvette-FCI Property, where diamond drilling has confirmed significant lithium mineralization; hole
(CF21-001) returned a 146.8 m interval of near continuous pegmatite, assaying 0.93% Li 2O and 114 ppm
Ta2O5, including1.09% Li2O and 108 ppm Ta2O5 over 73.0 m, and 1.04% Li2O and 145 ppm Ta2O5 over 54.6
m. This interval returned numerous samples over 2.0% Li2O, including a peak assay of 4.16% Li2O and 233
ppm Ta2O5 over 1.01 m. (November 29, 2021)
The Rakounga Gold Project consists of an exploration permit covering a two-hundred-and-fifty square
kilometer area located along the Goren Greenstone Belt in central Burkina Faso. The Company, through
its wholly owned subsidiary Kruger Gold Corp. (“Kruger”), holds the right to acquire up to a one-hundred
percent interest in and to the Project, subject only to pre-existing royalty obligations. Kruger has control
over operations conducted on the Project and will look to expand on historical drilling and survey work
conducted on the Project.
For further information, contact Mark Ferguson, Chief Executive Officer, at [email protected], or
visit the Company’s website at www.arbormetalscorp.com.
On behalf of the Board,
Arbor Metals Corp.
Mark Ferguson, Chief Executive Officer
Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in policies
of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.
This news release may contain certain “Forward-Looking Statements” within the meaning of the United
States Private Securities Litigation Reform Act of 1995 and applicable Canadian securities laws. When or
if used in this news release, the words “anticipate”, “believe”, “estimate”, “expect”, “target, “plan”,
“forecast”, “may”, “schedule” and similar words or expressions identify forward-looking statements or
information. These forward-looking statements or information may relate to the development of the
Jarnet Lithium Project, the assessment of samples from that Project, and other factors or information.
Such statements represent the Company’s current views with respect to future events and are necessarily
based upon a number of assumptions and estimates that, while considered reasonable by the Company,
are inherently subject to significant business, economic, competitive, political and social risks,
contingencies and uncertainties. Many factors, both known and unknown, could cause results,
performance, or achievements to be materially different from the results, performance or achievements
that are or may be expressed or implied by such forward-looking statements. The Company does not
intend, and does not assume any obligation, to update these forward-looking statements or information
to reflect changes in assumptions or changes in circumstances or any other events affecting such
statements and information other than as required by applicable laws, rules and regulations.