Arbor Metals Initiates Work On Miller Crossing Lithium Project, Big
Arbor Metals Initiates Work On Miller Crossing Lithium Project, Big
Smoky Valley, Nevada
Vancouver, Canada – TheNewswire - November 8th, 2021 – Arbor Metals Corp . (the “Company”)
(TSXV:ABR), (FWB:432) has initiated a preliminary work program on it’s newly acquired Miller’s Crossing
lithium project (the “Project”), located in the Big Smoky Valley, Nevada, United States.
The Miller's Crossing project consists of 192 claims covering 3,800 acres, of which the Company owns
100%, with no royalties. The Project is considered prospective for playa-type brine deposits as it is
located near to, and shares geological similarities with, the Silver Peak lithium brine operations in the
Clayton Valley owned by Albemarle Corp., which represents the only lithium-producing brine operation
in North America. However, the Project is also considered very prospective for lithium claystone
mineralization in the richly mineralized Esmeralda lithium district of Nevada.
Brine Target - The Miller’s Crossing Project covers a known playa in the Big Smoky Valley, approximately
40 kilometers east of Albemarle’s Silver Peak lithium brine operation which have been in continuous
production since 1967. A playa is an internally drained brine deposit, the surface of which is primarily
composed of silts and clays in which lithium can accumulate from the surrounding source rocks during
successive evaporation and concentration events. Evaluation of surrounding gravity data has led to the
hypothesis that the Big Smoky Valley has been in-filled with an estimated 2,000 to 2,500 metres of
alluvial fill and many have the potential to host a significant lithium deposit. The principal target on the
Miller’s Crossing Project is a large northeast-trending gravity-low anomaly which is suggestive of an in-
filled basin. The Big Smoky Valley was investigated with regional reverse circulation (RC) drilling by the
United States Geological Survey (USGS) and anomalous lithium values were encountered in the basin
sediments. The quality and concentrations of lithium brines discovered in the Clayton Valley may also be
present on the Miller’s Crossing Project.
Claystone Target – Significant concentrations of lithium (and other metals) in clays or claystone in
closed basins, have long been known and explored in many parts of the world. However, the recent
advancement and success of Rio Tinto’s Jadar deposit in Serbia, with a commitment in July 2021 of US
$2.4 billion to develop an underground mine and processing plant, represents a “sea change” event for
the lithium sector. Saleable lithium-borates products from Jadar are scheduled for 2026, with
construction to start in 2022. Within a 40-kilometer radius of the Miller’s Crossing Project, seven junior
companies are exploring and advancing lithium claystone projects. Located 18 kilometers to the east,
America Lithium’s TLC Project located in the Big Smoky Valley basin has established a resource in
claystone with only 36 drill holes. Australian company, Ioneer’s Rhyolite Ridge lithium claystone project
located 40 kilometers to the west of the Miller’s Crossing Project is reported to be the most advanced
lithium project in the USA, with construction planned for late 2022. The Miller’s Crossing Project has
excellent potential to host lithium claystone mineralization that previously was overlooked and not
tested for.
The Company has initiated preliminary work on the Project directed at both brine and claystone targets.
A satellite imagery survey has been commissioned, and field crews have made an initial visit to the site
for reconnaissance and logistical planning. Field crews will be focusing on the identification of the
Siebert formation sediments on the Project which is the host rock of American Lithium’s TLC deposit.
Proposed activities this quarter include geological mapping, extensive surface sampling, airborne and/or
ground geophysics and soil geochemistry. The Company has engaged a leading Nevada lithium specialist
to assist with the program management, as well as a Vancouver-based geologist with knowledge and
experience in lithium clay exploration in Sonora, Mexico.
Mark Ferguson, President of the Company commented “We are very excited to be advancing the
Company’s Miller’s Crossing Lithium Project. Our team has been evaluating past work and geological
information and feels the potential for new discovery is promising. The Company is particularly
interested in exploring the Siebert formation sediments on the property, as the same formation in which
American Lithium’s TLC deposit was discovered.”
Dr. Peter Born, P.Geo., is the designated qualified person as defined by National Instrument 43-101 and
is responsible for, and has approved, the technical information contained in this release.
About Arbor Metals Corp
Arbor Metal Corp . is a mining exploration company specializing in the development of high-value,
geographic significant mineral projects around the world. As industry leaders, we are paving the way for
advanced mineral exploration as we oversee world-class mining projects. We believe quality project,
combined with proven strategies and a professional, along with a hard working team will deliver
superior results. We hold two exceptional mineral projects.
The Rakounga Gold Project consists of an exploration permit covering a two-hundred-and-fifty square
kilometer area located along the Goren Greenstone Belt in central Burkina Faso. The Company, through
its wholly owned subsidiary Kruger Gold Corp. (“Kruger”), holds the right to acquire up to a one-hundred
percent interest in and to the Project, subject only to pre-existing royalty obligations. Kruger has control
over operations conducted on the Project and will look to expand on historical drilling and survey work
conducted on the Project.
The Miller’s Crossing Lithium Project, comprised of approximately 3800 acres of contiguous placer
claims, is located in the Big Smoky Valley, Esmeralda County, Nevada. The Big Smoky Valley is located
immediately north of the Clayton Valley, home to Albemarle’s Silver Peak Lithium Brine Mine (in
continuous operation since 1967.)
For further information, contact Mark Ferguson, Chief Executive Officer, at [email protected], or
visit the Company’s website at www.arbormetalscorp.com.
On behalf of the Board,
Arbor Metals Corp.
Mark Ferguson, Chief Executive Officer
Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in policies
of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.
This news release may contain certain “Forward-Looking Statements” within the meaning of the United
States Private Securities Litigation Reform Act of 1995 and applicable Canadian securities laws. When or
if used in this news release, the words “anticipate”, “believe”, “estimate”, “expect”, “target, “plan”,
“forecast”, “may”, “schedule” and similar words or expressions identify forward-looking statements or
information. These forward-looking statements or information may relate to the development of the
Miller’s Crossing Lithium Project and other factors or information. Such statements represent the
Company’s current views with respect to future events and are necessarily based upon a number of
assumptions and estimates that, while considered reasonable by the Company, are inherently subject to
significant business, economic, competitive, political and social risks, contingencies and uncertainties.
Many factors, both known and unknown, could cause results, performance, or achievements to be
materially different from the results, performance or achievements that are or may be expressed or
implied by such forward-looking statements. The Company does not intend, and does not assume any
obligation, to update these forward-looking statements or information to reflect changes in assumptions
or changes in circumstances or any other events affecting such statements and information other than as
required by applicable laws, rules and regulations.