Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

ABR.V ·

Arbor Metals Expands Jarnet Lithium Project, James BAY, Quebec, Canada

Property Options & Staking

NEWS RELEASE

ARBOR METALS EXPANDS JARNET LITHIUM PROJECT, JAMES BAY,

QUEBEC, CANADA

Vancouver, Canada – March 21st, 2022 – Arbor Metals Corp. (the “Company”) (TSXV: ABR, FWB: 432)

announces the expansion of the Jarnet Lithium Project, which is located in the James Bay Region of

Quebec. After extensive review and analysis of work completed in the Jarnet Lithium Project area,

combined with additional discoveries made on trend with the Company’s Jarnet Lithium Project, the

Company has successfully expanded its Jarnet Lithium Project by 154 hectares. The Company would like

to thank the Province of Quebec, Canada for these exceptional claims, and their participation in the

transaction. The additional lands are strategically located contiguously with the Corvette-FCI

Property where a number of lithium discoveries have been made recently.*

The Company intends to move forward by adding these acquisitions into their exploration modeling plans.

Details and timing of this exploration plan will be released once determined.

*Company management cautions the reader that past results or discoveries on properties in proximity to the

Company’s properties are not necessarily indicative of the presence of similar mineralization on the Company’s

properties.

Dr. Peter Born, P.Geo., is the designated qualified person as defined by National Instrument 43-101 and

is responsible for, and has approved, the technical information contained in this release.

Arbor Metal Corp . is a mining exploration company specializing in the development of high-value,

geographic significant mineral projects around the world. As industry leaders, we are paving the way for

advanced mineral exploration as we oversee world-class mining projects. We believe quality projects,

combined with proven strategies and a professional team will deliver superior results. We hold three

exceptional mineral projects.

The Miller’s Crossing Lithium Project, comprised of approximately 3800 acres of contiguous placer claims,

located in the Big Smoky Valley, Esmeralda County, Nevada. The Big Smoky Valley is located immediately

north of the Clayton Valley, home to Albemarle’s Silver Peak Lithium Brine Mine (in continuous operation

since 1967.)

Jarnet Lithium Project, located in the James Bay Region of Quebec, which comprises of forty-seven map

designated claims, covering an area of approximately 2584 hectares. The Jarnet Project is contiguous to

the Corvette-FCI Property, where diamond drilling has confirmed significant lithium mineralization; hole

(CF21-001) returned a 146.8 m interval of near continuous pegmatite, assaying 0.93% Li 2O and 114 ppm

Ta2O5, including1.09% Li2O and 108 ppm Ta2O5 over 73.0 m, and 1.04% Li2O and 145 ppm Ta2O5 over 54.6

m. This interval returned numerous samples over 2.0% Li2O, including a peak assay of 4.16% Li2O and 233

ppm Ta2O5 over 1.01 m. (November 29, 2021)

- 2 -

The Rakounga Gold Project consists of an exploration permit covering a two-hundred-and-fifty square

kilometer area located along the Goren Greenstone Belt in central Burkina Faso. The Company, through

its wholly owned subsidiary Kruger Gold Corp. (“Kruger”), holds the right to acquire up to a one-hundred

percent interest in and to the Project, subject only to pre-existing royalty obligations. Kruger has control

over operations conducted on the Project and will look to expand on historical drilling and survey work

conducted on the Project.

For further information, contact Mark Ferguson, Chief Executive Officer, at [email protected], or

visit the Company’s website at www.arbormetalscorp.com.

On behalf of the Board,

Arbor Metals Corp.

Mark Ferguson, Chief Executive Officer

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in policies

of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

This news release may contain certain “Forward-Looking Statements” within the meaning of the United

States Private Securities Litigation Reform Act of 1995 and applicable Canadian securities laws. When or

if used in this news release, the words “anticipate”, “believe”, “estimate”, “expect”, “target, “plan”,

“forecast”, “may”, “schedule” and similar words or expressions identify forward-looking statements or

information. These forward-looking statements or information may relate to the development of the

Jarnet Lithium Project and other factors or information. Such statements represent the Company’s current

views with respect to future events and are necessarily based upon a number of assumptions and estimates

that, while considered reasonable by the Company, are inherently subject to significant business,

economic, competitive, political and social risks, contingencies and uncertainties. Many factors, both

known and unknown, could cause results, performance, or achievements to be materially different from

the results, performance or achievements that are or may be expressed or implied by such forward-looking

statements. The Company does not intend, and does not assume any obligation, to update these forward-

looking statements or information to reflect changes in assumptions or changes in circumstances or any

other events affecting such statements and information other than as required by applicable laws, rules

and regulations.