Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

ABR.V ·

Arbor Metals Engages Field Crew to Conduct Summer 2020 Work Program at Rakounga GOLD Project

Exploration Programs

ARBOR METALS CORP.

Suite 2200, 885 West Georgia Street

Vancouver, British Columbia

V6C 3E8

NEWS RELEASE

ARBOR METALS ENGAGES FIELD CREW TO CONDUCT SUMMER 2020 WORK

PROGRAM AT RAKOUNGA GOLD PROJECT

June 30, 2020 – Vancouver, British Columbia – Arbor Metals Corp. (the “Company”) (TSXV:

ABR) is pleased to announce that it has engaged a field crew to conduct a sampling program at

its Rakounga Gold Project (the “Project”), located in Burkina Faso, West Africa. The field crew

will be led by Warren Robb, P.Geo., who has extensive experience in Burkina Faso and is already

familiar with the Project. The details of the work program are in the process of being finalized at

this time, and the Company anticipates commencing work in the coming weeks.

The Company does not anticipate that current market conditions will delay or impact work at the

Project. Additional information regarding the intended work program and development of the

Project, will be provided as it becomes available.

About the Rakounga Gold Project

The Rakounga Gold Project consists of an exploration permit covering a two-hundred-and-fifty

square kilometer area located along the Goren Greenstone Belt in central Burkina Faso. The

Company, through its wholly-owned subsidiary Kruger Gold Corp. (“Kruger”), holds the right to

acquire up to a one-hundred percent interest in and to the Project, subject only to pre-existing

royalty obligations. Kruger has control over operations conducted on the Project and will look to

expand on historical drilling and survey work conducted on the Project.

For further information, contact Mark Ferguson, Chief Executive Officer, at

[email protected], or visit the Company’s website at www.arbormetalscorp.com.

On behalf of the Board,

Arbor Metals Corp.

Mark Ferguson, Chief Executive Officer

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in policies of the TSX

Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

This news release may contain certain “Forward-Looking Statements” within the meaning of the United States Private

Securities Litigation Reform Act of 1995 and applicable Canadian securities laws. When or if used in this news release,

the words “anticipate”, “believe”, “estimate”, “expect”, “target, “plan”, “forecast”, “may”, “schedule” and similar words or

expressions identify forward-looking statements or information. These forward-looking statements or information may

relate to finalization of a work program at the Project, the anticipated timing for the commencement of such a program,

and other factors or information. Such statements represent the Company’s current views with respect to future events

and are necessarily based upon a number of assumptions and estimates that, while considered reasonable by the

Company, are inherently subject to significant business, economic, competitive, political and social risks, contingencies

and uncertainties. Many factors, both known and unknown, could cause results, performance or achievements to be

materially different from the results, performance or achievements that are or may be expressed or implied by such

forward-looking statements. The Company does not intend, and does not assume any obligation, to update these

forward-looking statements or information to reflect changes in assumptions or changes in circumstances or any other

events affecting such statements and information other than as required by applicable laws, rules and regulations.