Arbor Metals Completes Phase 3 Diamond Drilling at Jarnet Lithium Project
NEWS RELEASE
ARBOR METALS COMPLETES PHASE 3 DIAMOND DRILLING AT JARNET LITHIUM PROJECT
Vancouver, Canada – July 21, 2025 – Arbor Metals Corp. (“Arbor” or the “Company”) (TSXV: ABR, FWB:
432) is pleased to announce the successful completion of its 2025 Phase 3 diamond drilling program at its
wholly owned Jarnet Lithium Project, located in the Corvette Lake Lithium Camp, Eeyou-Istchee Baie-
James territory in the Quebec North region.
The Phase 3 drilling campaign saw the completion of 10 NQ2 holes, with a combined drilling length of
2,451 meters. Drilling depths ranged from 137 meters to 462 meters, with approximately 572 samples
collected during the program including QAQC samples. Samples will be cataloged and characterized
before being sent for assay to be compared with other pegmatites and mineralized systems in the
Corvette Lake area. The drilling program was carried out by Muskw Drilling, a local joint venture with the
Cree community.
Drilling was completed across the Corvette, Firebird, and Jarnet 2 claim blocks. Pegmatites were
encountered in every hole, with the majority of samples collected from within pegmatite bodies.
Additionally, select samples taken from chlorite -altered iron formations with veining and sulphides at
Corvette will be assayed for gold, further adding to the potential of the project.
Holes JAR25-27, JAR25-32 and JAR25-33 were drilled in large batholiths intrusions located on the Firebird
claims. Drilling showed generally different generations of pegmatites, which included intrusion swarms,
cross cutting over significant lengths, between 10 and 20 metres.
About 5km to the south on the Corvette property, holes JAR25-29 and JAR25-31 intersected thin
pegmatite dykes, which are generally of less than 1 metre. Otherwise, large intervals of disseminated
sulfides (pyrrhotite and chalcopyrite) were encountered in mafic and ultramafic intrusions. The Company
is confident to have generated a new exploration target on ground which had not been previously drilled.
Holes JAR25-34, JAR25-35, JAR25-36 were drilled on the Jarnet claims, following the identification of
targets outside the main pegmatite trend. . Hole JAR-25-35 and 36 were drilled inside a magnetic front
and multiple pegmatites were intersected at regular spacing inside granitic host rock.
“We are very pleased with the successful completion of our Phase 3 drilling program at the Jarnet Lithium
Project,” said Mark Ferguson, President and CEO of Arbor. “The consistent presence of pegmatites
encountered throughout the drilling campaign is a positive sign for the project, and we are eager to
receive the assay results to better understand the lithium potential of the site. We are also excited to
explore the gold potential in certain areas, which adds another dimension to the project’s value. We look
forward to continuing to advance this promising project.”
Arbor is committed to conducting all of its exploration activities with a strong focus on environmental
stewardship. The Company adheres to industry-leading environmental guidelines and strives to minimize
its environmental footprint. Furthermore, Arbor continues to work collaboratively with local indigenous
groups and other stakeholders to ensure that its activities are aligned with the needs and concerns of the
communities in which it operates. Arbor is dedicated to responsible resource development and
sustainable exploration practices that foster long-term value for both the Company and its stakeholders.
Martin Demers, PGeo, registered in the Province of Québec (OGQ No. 770), a consultant to Arbor and a
qualified person under National Instrument 43-101 – Standards of Disclosure for Mineral Projects , has
reviewed the technical contents of this news release and has approved the disclosure of the technical
information contained herein.
About Arbor Metals Corp.
Arbor Metals Corp. is a mining explora Ɵon company focused on developing high -value, geographically
significant mineral projects worldwide. Arbor is paving the way for advanced mineral explora Ɵon as it
oversees world-class mining projects. The Company is confident that combining quality projects with
proven strategies and a dedicated team will yield excepƟonal outcomes.
The Jarnet, CorveƩe Lake and St. Pierre lithium project s, located in the James Bay region of Quebec,
comprises 83 map-designated claims, covering an area of approximately 5,606 hectares. The projects are
conƟguous to the Corve Ʃe-FCI property, where diamond drilling has confirmed significant lithium
mineralizaƟon represenƟng one of the highest-profile lithium exploraƟon projects in the sector.
The Kemlee Lake Lithium project is strategically located three kilometers east of Rock Tech Lithium Inc.'s
Aumacho claim blocks and twelve kilometers south of the Georgia Lake Project. The Project shares many
geological similariƟes with the prolific Georgia Lake deposit, including bedrock geology and the presence
of massive intrusive dykes. The primary target at the Project will be spodumene- bearing pegma Ɵtes
hosted in metasediments.
For further informaƟon, contact Mark Ferguson, Chief ExecuƟve Officer, at [email protected], or
403.852.4869, or visit the Company’s website at www.arbormetalscorp.com.
On behalf of the Board,
Arbor Metals Corp.
Mark Ferguson, Chief ExecuƟve Officer
Neither the TSX Venture Exchange nor its Regula Ɵon Services Provider (as that term is defined in policies
of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.
This news release may contain certain “Forward-Looking Statements” within the meaning of the United
States Private SecuriƟes LiƟgaƟon Reform Act of 1995 and applicable Canadian securi Ɵes laws. When or
if used in this news release, the words “an Ɵcipate” , “believe”, “esƟmate”, “expect”, “target, “plan”,
“forecast”, “may”, “schedule” and similar words or expressions iden Ɵfy forward -looking statements or
informaƟon. These forward -looking statements or informa Ɵon may relate to further exploraƟon of t he
Jarnet Lithium Project and other factors or informaƟon. Such statements represent the Company’s current
views with respect to future events and are necessarily based upon a number of assumpƟons and esƟmates
that, while considered reasonable by the Company, are inherently subject to significant business, economic,
compeƟƟve, poli Ɵcal and social risks, con Ɵngencies and uncertain Ɵes. Many factors, both known and
unknown, could cause results, performance, or achievements to be materially different from the results,
performance or achievements that are or may be expressed or implied by such forward-looking statements.
The Company does not intend, and does not assume any obliga Ɵon, to update these forward -looking
statements or informa Ɵon to reflect changes in assump Ɵons or changes in circumstances or any other
events affecƟng such statements and informa Ɵon other than as required by applicable laws, rules and
regulaƟons.