Arbor Metals Completes Phase 2 Ground Program at Jarnet Lithium Project
NEWS RELEASE
ARBOR METALS COMPLETES PHASE 2 GROUND PROGRAM AT JARNET LITHIUM PROJECT
Vancouver, Canada – June 16th, 2024 – Arbor Metals Corp. (“Arbor” or the “Company”) (TSXV: ABR,
FWB: 432) is pleased to announce the successful completion of the Phase 2 exploration program at its
wholly owned Jarnet Lithium Project in the Corvette Lake Lithium Camp, central Quebec. This milestone
represents a significant advancement in Arbor's efforts to delineate and develop its lithium resources in
this highly prospective region.
The Phase 2 program encompassed extensive exploration activities across multiple blocks within the
Jarnet Lithium Project, including Jarnet 1-3, Firebird, and Corvette Lake. A total of 302 soil samples were
collected, predominantly at the C-horizon level, strategically positioned to test for the presence of lithium
near interpreted pegmatite dykes. In addition, 128 rock samples were extracted from pegmatite outcrops
at the Jarnet 2 block, leveraging advanced LIBS (laser-induced breakdown spectroscopy) technology to
evaluate lithium potential.
"We are delighted with the outcomes of our Phase 2 exploration program at the Jarnet Lithium Project,"
commented Mark Ferguson, President and CEO of Arbor. "The discovery of new pegmatite swarms
underscore the project's significant potential. These findings will guide our future exploration strategy as
we advance towards defining drilling targets."
The Phase 2 program also included the discovery of a new pluri-metric pegmatite on the Firebird claims,
located approximately 4 kilometers south-west of Patriot Battery Metal’s Corvette CV13 and CV14 zones.
The identification of internal zonation and specific crystallization textures associated with LCT (lithium-
cesium-tantalum) pegmatites further enhances the prospectivity of the area.
All rock samples collected during the program have been prepared and shipped to ALS Laboratories for
analysis. Arbor is eagerly anticipating the assay results, which will provide further insights into the lithium
content and mineralization characteristics across its project areas.
Arbor continues to uphold industry-leading environmental standards while fostering positive relationships
with stakeholders. By integrating sustainability into its core practices, Arbor aims to create enduring value
while minimizing its environmental footprint.
Martin Demers, P.Geo., registered in the Province of Québec (ogq No. 770), a consultant to Arbor and a
qualified person under National Instrument 43 101 -- Standards of Disclosure for Mineral Projects , has
reviewed the technical contents of this news release and has approved the disclosure of the technical
information contained herein.
About Arbor Metals Corp.
Arbor Metals Corp. is a mining exploration company focused on developing high-value, geographically
significant mineral projects worldwide. Arbor is paving the way for advanced mineral exploration as it
oversees world-class mining projects. The Company is confident that combining quality projects with
proven strategies and a dedicated team will yield exceptional outcomes.
The Jarnet, Corvette Lake and St. Pierre lithium projects , located in the James Bay region of Quebec,
comprises 83 map-designated claims, covering an area of approximately 5,606 hectares. The projects are
contiguous to the Corvette-FCI property, where diamond drilling has confirmed significant lithium
mineralization representing one of the highest-profile lithium exploration projects in the sector.
Kemlee Lake Lithium is strategically located three kilometers east of Rock Tech Lithium Inc.'s Aumacho
claim blocks and twelve kilometers south of the Georgia Lake Project. The Project shares many geological
similarities with the prolific Georgia Lake deposit, including bedrock geology and the presence of massive
intrusive dykes. The primary target at the Project will be spodumene-bearing pegmatites hosted in
metasediments.
For further information, contact Mark Ferguson, Chief Executive Officer, at [email protected],
or 403.852.4869, or visit the Company’s website at www.arbormetalscorp.com.
On behalf of the Board,
Arbor Metals Corp.
Mark Ferguson, Chief Executive Officer
Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in policies
of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.
This news release may contain certain “Forward-Looking Statements” within the meaning of the United
States Private Securities Litigation Reform Act of 1995 and applicable Canadian securities laws. When or
if used in this news release, the words “anticipate”, “believe”, “estimate”, “expect”, “target, “plan”,
“forecast”, “may”, “schedule” and similar words or expressions identify forward-looking statements or
information. These forward-looking statements or information may relate to the analysis of assay results
from the Jarnet Lithium Project and other factors or information. Such statements represent the
Company’s current views with respect to future events and are necessarily based upon a number of
assumptions and estimates that, while considered reasonable by the Company, are inherently subject to
significant business, economic, competitive, political and social risks, contingencies and uncertainties.
Many factors, both known and unknown, could cause results, performance, or achievements to be
materially different from the results, performance or achievements that are or may be expressed or implied
by such forward-looking statements. The Company does not intend, and does not assume any obligation,
to update these forward-looking statements or information to reflect changes in assumptions or changes
in circumstances or any other events affecting such statements and information other than as required by
applicable laws, rules and regulations.