Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

ABR.V ·

Arbor Metals Completes Phase 2 Drilling at Jarnet Lithium Project

Exploration Programs

NEWS RELEASE

ARBOR METALS COMPLETES PHASE 2 DRILLING AT JARNET LITHIUM PROJECT

Vancouver, Canada – March 20 th, 2025 – Arbor Metals Corp. (“Arbor” or the “ Company”) (TSXV: ABR,

FWB: 432) is pleased to announce the completion of its 2025 phase 2 diamond drilling program at its

wholly owned Jarnet Lithium Project, located in the Corvette Lake Lithium Camp, Eeyou-Istchee Baie-

James territory in Quebec North region.

The Phase 2 drilling campaign completed a total of 16 NQ2 holes, for a combined drilling length of 3792

meters. Four distinct target areas were investigated based on results of the 2024 drill program. Drilling

depths varied from 152m to 369m in length. All holes were drilled by Fusion drilling. Approximately 1300

samples have been sent for analysis, including blanks and standards to confirm lab quality.

Granitic pegmatites were noted and sampled in all 16 holes covering all target areas. Molybdenite was

noted and pegmatite related in five drill holes. Molybdenite was recorded in three separate target zones.

The host rock for the pegmatites is quartz monzonite and/or greywacke.

Mark Ferguson, President of Arbor, stated, “We are pleased to complete this important phase of our

drilling program at the Jarnet Lithium Project. The results are promising, and we look forward to

continuing our work in this highly prospective region as we move toward advancing the project. Our focus

remains on delivering shareholder value while adhering to best practices in sustainability and responsible

exploration.”

Arbor is committed to conducting all of its exploration activities with a strong focus on environmental

stewardship. The Company adheres to industry-leading environmental guidelines and strives to minimize

its environmental footprint. Furthermore, Arbor continues to work collaboratively with local communities

and other stakeholders to ensure its activities are aligned with the needs and concerns of the communities

in which it operates, including ongoing engagement with indigenous groups to ensure their perspectives

are respected and integrated into the project’s development.

Martin Demers, PGeo, registered in the Province of Québec (OGQ No. 770), a consultant to Arbor and a

qualified person under National Instrument 43-101 – Standards of Disclosure for Mineral Projects , has

reviewed the technical contents of this news release and has approved the disclosure of the technical

information contained herein.

About Arbor Metals Corp.

Arbor Metals Corp. is a mining explora Ɵon company focused on developing high -value, geographically

significant mineral projects worldwide. Arbor is paving the way for advanced mineral explora Ɵon as it

oversees world-class mining projects. The Company is confident that combining quality projects with

proven strategies and a dedicated team will yield excepƟonal outcomes.

The Jarnet, CorveƩe Lake and St. Pierre lithium project s, located in the James Bay region of Quebec,

comprises 83 map-designated claims, covering an area of approximately 5,606 hectares. The projects are

conƟguous to the Corve Ʃe-FCI property, where diamond drilling has confirmed significant lithium

mineralizaƟon represenƟng one of the highest-profile lithium exploraƟon projects in the sector.

The Kemlee Lake Lithium project is strategically located three kilometers east of Rock Tech Lithium Inc.'s

Aumacho claim blocks and twelve kilometers south of the Georgia Lake Project. The Project shares many

geological similariƟes with the prolific Georgia Lake deposit, including bedrock geology and the presence

of massive intrusive dykes. The primary target at the Project will be spodumene- bearing pegma Ɵtes

hosted in metasediments.

For further informaƟon, contact Mark Ferguson, Chief ExecuƟve Officer, at [email protected], or

403.852.4869, or visit the Company’s website at www.arbormetalscorp.com.

On behalf of the Board,

Arbor Metals Corp.

Mark Ferguson, Chief ExecuƟve Officer

Neither the TSX Venture Exchange nor its Regula Ɵon Services Provider (as that term is defined in policies

of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

This news release may contain certain “Forward-Looking Statements” within the meaning of the United

States Private SecuriƟes LiƟgaƟon Reform Act of 1995 and applicable Canadian securi Ɵes laws. When or

if used in this news release, the words “an Ɵcipate” , “believe”, “esƟmate”, “expect”, “target, “plan”,

“forecast”, “may”, “schedule” and similar words or expressions iden Ɵfy forward -looking statements or

informaƟon. These forward -looking statements or informa Ɵon may relate to further exploraƟon of t he

Jarnet Lithium Project and other factors or informaƟon. Such statements represent the Company’s current

views with respect to future events and are necessarily based upon a number of assumpƟons and esƟmates

that, while considered reasonable by the Company, are inherently subject to significant business, economic,

compeƟƟve, poli Ɵcal and social risks, con Ɵngencies and uncertain Ɵes. Many factors, both known and

unknown, could cause results, performance, or achievements to be materially different from the results,

performance or achievements that are or may be expressed or implied by such forward-looking statements.

The Company does not intend, and does not assume any obliga Ɵon, to update these forward -looking

statements or informa Ɵon to reflect changes in assump Ɵons or changes in circumstances or any other

events affecƟng such statements and informa Ɵon other than as required by applicable laws, rules and

regulaƟons.