Arbor Metals Completes Ground Magnetic Survey at Kemlee Lake Lithium Project
NEWS RELEASE
ARBOR METALS COMPLETES GROUND MAGNETIC SURVEY AT KEMLEE LAKE LITHIUM PROJECT
Vancouver, Canada – February 18, 2025 – Arbor Metals Corp. (“Arbor” or the “Company”) (TSXV: ABR,
FWB: 432) is pleased to announce the completion of its ground magnetic survey on its wholly owned
Kemlee Lake Lithium Project, located on the east shore of Lake Nipigon, Ontario. The Phase 1 survey was
conducted over 28 days, during which 75 kilometers of survey lines were completed, primarily covering a
NNE-SSW trending dyke that transects the property.
This survey represents a significant step in Arbor's exploration strategy for the Kemlee Lake Lithium
Project. The results from this program will facilitate the mapping of pegmatite dykes and other subsurface
geological features, and serve as a critical guide for future exploration programs. The survey utilized five
Gem GSM-19W Overhauser Magnetometers and a base station to acquire high-quality geophysical data.
Data from the survey is currently being evaluated, and the Company expects to receive results in the near
term.
Mark Ferguson, President and CEO of Arbor, commented, “We are very pleased to have completed this
important ground magnetic survey at our Kemlee Lake Lithium Project. The survey provides us with
valuable data that will enable us to better understand the geological structure of the property and
prioritize future exploration targets. We are excited to move forward with our plans to explore this
promising project further.”
Arbor is committed to conducting all of its exploration activities with a strong focus on environmental
responsibility. The Company adheres to industry-leading environmental guidelines and strives to minimize
its environmental footprint throughout the exploration process. Furthermore, Arbor continues to work
collaboratively with local indigenous groups and other stakeholders to ensure that its activities are aligned
with the needs and concerns of the communities in which it operates.
Dr. Peter Born, PGeo, is the designated qualified person as defined by Nafional Instrument 43-101 and is
responsible for, and has approved, the technical informafion contained in this release.
About Arbor Metals Corp.
Arbor Metals Corp. is a mining explorafion company focused on developing high-value, geographically
significant mineral projects worldwide. Arbor is paving the way for advanced mineral explorafion as it
oversees world-class mining projects. The Company is confident that combining quality projects with
proven strategies and a dedicated team will yield excepfional outcomes.
The Jarnet, Corvefte Lake and St. Pierre lithium projects, located in the James Bay region of Quebec,
comprises 83 map-designated claims, covering an area of approximately 5,606 hectares. The projects are
configuous to the Corvefte-FCI property, where diamond drilling has confirmed significant lithium
mineralizafion represenfing one of the highest-profile lithium explorafion projects in the sector.
The Kemlee Lake Lithium project is strategically located three kilometers east of Rock Tech Lithium Inc.'s
Aumacho claim blocks and twelve kilometers south of the Georgia Lake Project. The Project shares many
geological similarifies with the prolific Georgia Lake deposit, including bedrock geology and the presence
of massive intrusive dykes. The primary target at the Project will be spodumene- bearing pegmafites
hosted in metasediments.
For further informafion, contact Mark Ferguson, Chief Execufive Officer, at [email protected], or
403.852.4869, or visit the Company’s website at www.arbormetalscorp.com.
On behalf of the Board,
Arbor Metals Corp.
Mark Ferguson, Chief Execufive Officer
Neither the TSX Venture Exchange nor its Regulafion Services Provider (as that term is defined in policies
of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.
This news release may contain certain “Forward-Looking Statements” within the meaning of the United
States Private Securifies Lifigafion Reform Act of 1995 and applicable Canadian securifies laws. When or
if used in this news release, the words “anficipate”, “believe”, “esfimate”, “expect”, “target, “plan”,
“forecast”, “may”, “schedule” and similar words or expressions idenfify forward-looking statements or
informafion. These forward-looking statements or informafion may relate to further explorafion of the
Kemlee Lake Lithium Project and other factors or informafion. Such statements represent the Company’s
current views with respect to future events and are necessarily based upon a number of assumpfions and
esfimates that, while considered reasonable by the Company, are inherently subject to significant business,
economic, compefifive, polifical and social risks, confingencies and uncertainfies. Many factors, both
known and unknown, could cause results, performance, or achievements to be materially different from
the results, performance or achievements that are or may be expressed or implied by such forward-looking
statements. The Company does not intend, and does not assume any obligafion, to update these forward-
looking statements or informafion to reflect changes in assumpfions or changes in circumstances or any
other events affecfing such statements and informafion other than as required by applicable laws, rules
and regulafions.