Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

ABR.V ·

Arbor Metals Commences Phase One Geophysical Survey of Kemlee Lake Lithium Project

Exploration Programs

NEWS RELEASE

ARBOR METALS COMMENCES PHASE ONE GEOPHYSICAL SURVEY

OF KEMLEE LAKE LITHIUM PROJECT

Vancouver, Canada – February 5 th, 2025 – Arbor Metals Corp. (“Arbor” or the “ Company”) (TSXV: ABR,

FWB: 432 is pleased to announce the commencement of a ground magnetic geophysical survey at its

wholly owned Kemlee Lake Lithium Project (KLLP), located in the Thunder Bay Mining Division, Ontario.

This survey marks the first phase of the Company’s comprehensive exploration strategy aimed at assessing

the potential of the KLLP.

The purpose of the Phase 1 survey is to map a series of north-south trending dykes that appear to be

aligned with geological features in RockTech Lithium’s Aumacho claim blocks. These dykes are believed to

be key to identifying potential lithium-bearing pegmatites in the region. Arbor expects to complete up to

100 line kilometers of geophysical survey, effectively covering the entire project area. The results from

this Phase 1 survey will provide valuable data on the structural controls and geologic features, forming

the foundation for future exploration activities.

Following the completion of the magnetic survey, Arbor plans to implement a Phase 2 field prospecting

program to test the identified dykes for the presence of spodumene, a lithium-bearing mineral. This

program will involve detailed surface sampling and mapping to assess the lithium potential of the target

dykes.

Mark Ferguson, President and CEO of Arbor., commented, “We are excited to begin this crucial Phase 1

geophysical survey at the Kemlee Lake Lithium Project. The magnetic survey will allow us to map and

identify key structural features within the project area and lay the groundwork for our Phase 2 prospecting

program. We look forward to testing the identified dykes for spodumene and advancing the project

toward its next stages of exploration.”

The Kemlee Lake Lithium Project is strategically located in the heart of the Georgia Lake Lithium Camp

and shares many of the same geological signatures as the nearby Georgia Lake Project, which holds an

indicated mineral resource of approximately 10.6Mt at 0.88% LiO2 (as of July 2022). The KLLP is also

located near RockTech Lithium’s Aumacho claim blocks, which further enhances its potential as a source

of high-quality lithium. (Cautionary Statement: Mineralization hosted on adjacent and/or nearby and/or

geologically similar properties is not necessarily indicative of mineralization hosted on the Company’s

properties.)

Arbor remains committed to conducting its exploration activities with the utmost regard for

environmental sustainability. The Company adheres to industry-leading environmental standards and

works in collaboration with local Indigenous groups and stakeholders to ensure its activities are

responsible and aligned with the values of the communities in which it operates.

Dr. Peter Born, P .Geo., is the designated qualified person as defined by NaƟonal Instrument 43-101 and is

responsible for, and has approved, the technical informaƟon contained in this release.

About Arbor Metals Corp.

Arbor Metals Corp. is a mining explora Ɵon company focused on developing high -value, geographically

significant mineral projects worldwide. Arbor is paving the way for advanced mineral explora Ɵon as it

oversees world-class mining projects. The Company is confident that combining quality projects with

proven strategies and a dedicated team will yield excepƟonal outcomes.

The Jarnet, CorveƩe Lake and St. Pierre lithium project s, located in the James Bay region of Quebec,

comprises 83 map-designated claims, covering an area of approximately 5,606 hectares. The projects are

conƟguous to the Corve Ʃe-FCI property, where diamond drilling has confirmed significant lithium

mineralizaƟon represenƟng one of the highest-profile lithium exploraƟon projects in the sector.

The Kemlee Lake Lithium project is strategically located three kilometers east of Rock Tech Lithium Inc.'s

Aumacho claim blocks and twelve kilometers south of the Georgia Lake Project. The Project shares many

geological similariƟes with the prolific Georgia Lake deposit, including bedrock geology and the presence

of massive intrusive dykes. The primary target at the Project will be spodumene- bearing pegma Ɵtes

hosted in metasediments.

For further informaƟon, contact Mark Ferguson, Chief ExecuƟve Officer, at [email protected], or

403.852.4869, or visit the Company’s website at www.arbormetalscorp.com.

On behalf of the Board,

Arbor Metals Corp.

Mark Ferguson, Chief ExecuƟve Officer

Neither the TSX Venture Exchange nor its Regula Ɵon Services Provider (as that term is defined in policies

of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

This news release may contain certain “Forward-Looking Statements” within the meaning of the United

States Private SecuriƟes LiƟgaƟon Reform Act of 1995 and applicable Canadian securi Ɵes laws. When or

if used in this news release, the words “an Ɵcipate” , “believe”, “esƟmate”, “expect”, “target, “plan”,

“forecast”, “may”, “schedule” and similar words or expressions iden Ɵfy forward -looking statements or

informaƟon. These forward -looking statements or informa Ɵon may relate to further exploraƟon of t he

Kemlee Lake Lithium Project and other factors or informaƟon. Such statements represent the Company’s

current views with respect to future events and are necessarily based upon a number of assumpƟons and

esƟmates that, while considered reasonable by the Company, are inherently subject to significant business,

economic, compe ƟƟve, poli Ɵcal and social risks, con Ɵngencies and uncertain Ɵes. Many factors, both

known and unknown, could cause results, performance, or achievements to be materially different from

the results, performance or achievements that are or may be expressed or implied by such forward-looking

statements. The Company does not intend, and does not assume any obligaƟon, to update these forward-

looking statements or informaƟon to reflect changes in assump Ɵons or changes in circumstances or any

other events affecƟng such statements and informa Ɵon other than as required by applicable laws, rules

and regulaƟons.