Arbor Metals Commences Phase 2 Exploration Program at Kemlee Lake Lithium Project
NEWS RELEASE
ARBOR METALS COMMENCES PHASE 2 EXPLORATION PROGRAM
AT KEMLEE LAKE LITHIUM PROJECT
Vancouver, Canada – June 9th, 2025 – Arbor Metals Corp. (“Arbor” or the “Company”) (TSXV: ABR, FWB:
432) is pleased to announce the commencement of its Phase 2 exploration program at its wholly owned
Kemlee Lake Lithium Project, located on the eastern shore of Lake Nipigon, Ontario. This program follows
the successful completion of the Phase 1 ground magnetic survey, which provided critical data to guide
the next stage of exploration.
The Phase 2 program involves a property-wide prospecting campaign, with a particular focus on examining
a ten-kilometer north-south trending dyke for the presence of spodumene, a lithium-bearing mineral. The
prospecting program is expected to last between 3-4 weeks and will include surface sampling, mapping,
and geological assessments to better define potential drill targets for future exploration.
“We are excited to begin Phase 2 of the exploration program at the Kemlee Lake Lithium Project,” said
Mark Ferguson, President and CEO of Arbor. “The results of the Phase 1 ground magnetic survey have
provided us with invaluable data, and we are eager to advance the project by focusing on the spodumene-
bearing dykes identified in the geophysical survey. Our team is committed to exploring this promising area
and building on the foundation laid by the initial exploration work.”
Arbor is committed to conducting all of its exploration activities with a strong focus on environmental
responsibility. The Company adheres to industry-leading environmental guidelines and strives to minimize
its environmental footprint throughout the exploration process. Furthermore, Arbor continues to work
collaboratively with local indigenous groups and other stakeholders to ensure that its activities are aligned
with the needs and concerns of the communities in which it operates. The Company is dedicated to
fostering positive relationships and ensuring that the Kemlee Lake project benefits all involved parties.
Dr. Peter Born, P.Geo., is the designated qualified person as defined by National Instrument 43-101 and
is responsible for and has approved the technical information contained in this release.
About Arbor Metals Corp.
Arbor Metals Corp. is a mining explora Ɵon company focused on developing high -value, geographically
significant mineral projects worldwide. Arbor is paving the way for advanced mineral explora Ɵon as it
oversees world-class mining projects. The Company is confident that combining quality projects with
proven strategies and a dedicated team will yield excepƟonal outcomes.
The Jarnet, CorveƩe Lake and St. Pierre lithium project s, located in the James Bay region of Quebec,
comprises 83 map-designated claims, covering an area of approximately 5,606 hectares. The projects are
conƟguous to the Corve Ʃe-FCI property, where diamond drilling has confirmed significant lithium
mineralizaƟon represenƟng one of the highest-profile lithium exploraƟon projects in the sector.
The Kemlee Lake Lithium project is strategically located three kilometers east of Rock Tech Lithium Inc.'s
Aumacho claim blocks and twelve kilometers south of the Georgia Lake Project. The Project shares many
geological similariƟes with the prolific Georgia Lake deposit, including bedrock geology and the presence
of massive intrusive dykes. The primary target at the Project will be spodumene- bearing pegma Ɵtes
hosted in metasediments.
For further informaƟon, contact Mark Ferguson, Chief ExecuƟve Officer, at [email protected], or
403.852.4869, or visit the Company’s website at www.arbormetalscorp.com.
On behalf of the Board,
Arbor Metals Corp.
Mark Ferguson, Chief ExecuƟve Officer
Neither the TSX Venture Exchange nor its Regula Ɵon Services Provider (as that term is defined in policies
of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.
This news release may contain certain “Forward-Looking Statements” within the meaning of the United
States Private SecuriƟes LiƟgaƟon Reform Act of 1995 and applicable Canadian securi Ɵes laws. When or
if used in this news release, the words “an Ɵcipate” , “believe”, “esƟmate”, “expect”, “target, “plan”,
“forecast”, “may”, “schedule” and similar words or expressions iden Ɵfy forward -looking statements or
informaƟon. These forward -looking statements or informa Ɵon may relate to further exploraƟon of t he
Kemlee Lake Lithium Project and other factors or informaƟon. Such statements represent the Company’s
current views with respect to future events and are necessarily based upon a number of assumpƟons and
esƟmates that, while considered reasonable by the Company, are inherently subject to significant business,
economic, compe ƟƟve, poli Ɵcal and social risks, con Ɵngencies and uncertain Ɵes. Many factors, both
known and unknown, could cause results, performance, or achievements to be materially different from
the results, performance or achievements that are or may be expressed or implied by such forward-looking
statements. The Company does not intend, and does not assume any obligaƟon, to update these forward-
looking statements or informaƟon to reflect changes in assump Ɵons or changes in circumstances or any
other events affecƟng such statements and informa Ɵon other than as required by applicable laws, rules
and regulaƟons.