Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

ABI.V ·

Abcourt intersects 3.7 g/t gold over 11 metres directly below the Cartwright stripping and publishes a summary of the 2025 drilling campaign on its Flordin property in the Lebel-Sur-Quévillon area

Drill Results

For Immediate Release

TSX Venture Exchange: ABI. V

Abcourt intersects 3.7 g/t gold over 11 metres directly below the Cartwright stripping

and publishes a summary of the 2025 drilling campaign on its Flordin property in the

Lebel-Sur-Quévillon area

Rouyn-Noranda, Canada, May 12, 2025 – Abcourt Mines Inc. (“Abcourt” or the “Company”) (TSX

Venture : ABI) (OTCQB : ABMBF) is pleased to announce the latest assay results from its 2025 drilling

campaign on its Flordin property in the Lebel -Sur-Quévillon area. Hole FL-25-284 intersected 3.7 g/t

gold over 11 metres including 11.0 g/t gold over 2.4 metres. The high-grade gold mineralized zone

was intercepted less than 3 metres from surface directly below the Cartwright stripping. Note that the

easternmost hole of the stripping (FL-25-277: 1.4 g/t gold over 13 metres) confirms that the Adam and

Horse mineralized zones continue well beyond this one and therefore remains open to the East. The

same is true for the westernmost hole (FL-25-286: 0.4 g/t gold over 16 metres) which also confirms that

the mineralization is continuous and open in this direction.

The mineralization described in the Cartwright area consists mainly of gold -bearing pyrite band with

silica-hematite without quartz vein. This type of characteristic high-grade gold mineralization has been

described in the central area of the property (2023 drilling) and in the South Zone area which is located

almost 2 kilometres from the Cartwright Zone (see surface plan for general locatio n). A comparative

petrographic study is being conducted by Ms. Lucie Mathieu, Ph.D. of GEOX Consulting Inc. to describe

the similarities and differences observed in the gold mineralization for the three sectors (Cartwright,

Central Zone and South Zone). A geochemical study of the major elements is also being carried out,

which will make it possible to identify the lithologies and alterations present in the various mineralized

areas of the property.

The objectives of the 2025 drilling campaign on the Flordin property are:

Objective 1 : Confirm the continuity of gold mineralization directly below the Cartwright stripping

completed in the fall of 2024. A total of nine (9) short holes for a total of 1227 metres were drilled in the

Cartwright area. All the 2025 drillings carried out under stripping returned gold values over tens of metres

in length. Hole FL-25-274 returned 3.5 g/t gold over 27.5 metres, including 12.1 g/t over 7.5 metres.

Making this intersection one of the richest in gold in the project.

Objective 2: Confirm the presence and continuity of the South Zone that was discovered in 1988 by

Cambior. Demonstrate that the mineralization of the South Zone is similar/different to that observed and

described in the Cartwright area. In all, four (4) deep holes for a total of 2403 metres were made. All

2025 drilling in this area returned gold values over tens of metres in length. Hole FL-25-282 returned 1.1

g/t gold over 47.2 metres, including 7.6 g/t gold over 3 metres.

The mineralization of the South Zone is like that described in the Cartwright area. In general, silicification

seems to be more important for the South Zone. However, it should be noted that both zones are

characterized by high-grade gold mineralization associated with bands of pyrite, silica and hematite. The

gold mineralization is not associated with quartz veins but rather with pyrite-silica-hematite bands.

The table below provides a summary of all significant gold assay results obtained from the 2025 holes.

It should be noted that all the holes drilled during this phase of work, i.e. 100% of the drill holes intercepted

gold values.

Hole # From (m) To (m) Length

(m)

Grade

(g/t) Zones

Metal Factor

(length X

grade)

FL-25-273 29.5 48 18.5 1.2 22

incl. 29.5 38 8.5 0.6 Adam 5

incl. 46 48 2.0 6.6 Horse 13

FL-23-274 28 55.5 27.5 3.5 96

incl. 28 31 3.0 0.8 Adam 2

incl. 48 55.5 7.5 12.1 Horse 91

FL-25-275 43 43.5 0.5 1.8 Adam 1

81.5 82 0.5 1.3 Horse 1

FL-25-276 45.5 46.5 1.0 1.5 Adam 2

82 87 5.0 1.5 8

incl. 86.5 87 0.5 11.1 Horse 6

FL-25-277 27.5 29.5 2.0 0.9 Adam 2

38 51 13.0 1.4 18

incl. 48.5 51 2.5 5.4 Horse 14

FL-25-278 27.5 29.5 0.5 0.5 Adam 0

44 67.5 23.5 1.2 28

incl. 64 67.5 3.5 4.5 Horse 16

FL-25-280 483.5 484 0.5 5.7 South Zone 2

540.5 569 28.5 1.3 New 37

Incl. 563 565 3.0 5.1 New 15

FL-25-281

Incl.

394

398

451

413

400

452

17

2

1

0.5

1.3

1.2

South Zone

South Zone

New

9

3

1

FL-25-282 367 414.2 47.2 1.1 South Zone 52

Incl. 374 377 3.0 7.6 South Zone 23

FL-25-283 130 149 19.0 0.9 Altered 17

Incl. 140.9 144 3.1 3.1 Altered 10

557 574 17.0 1.0 South Zone 17

Incl. 560 561 1 6.5 South Zone 7

FL-25-284 3 14 11.0 3.7 Adam 41

Hole # From (m) To (m) Length

(m)

Grade

(g/t) Zones

Metal Factor

(length X

grade)

Incl. 6.6 9 2.4 11.0 26

55 59 4 1.3 Horse 5

FL-25-285 64 66 2.0 1.2 Adam 2

107 111 4.0 0.6 Horse 2

FL-25-286 58 74 16.0 0.4 Adam 6

73 74 1 1.2 Horse 1

Pascal Hamelin, President and Chief Executive Officer comments : “The 2025 drilling campaign

carried out on our Flordin project was a great success. All the drill holes drilled by our technical team

returned gold values over tens of meters of thickness. This first phase of work will have identified a

characteristic type of high-grade gold mineralization over a distance of at least 2 kilometres. The second

phase of drilling will aim to link the various mineralized zones laterally. The Flordin project is

advantageously located less than 20 kilometres North of the municipality of Lebel-Sur-Quévillon and less

than 1.5 kilometres North of the Canadian National Transcontinental Railway.”

Figure 1 : Regional Location of the Flordin Property

Figure 2 : Location of the Flordin Property and adjacent DEE owners

Figure 3 : Surface Plane

Figure 4 : Drilling 2025, Cartwright Area

Figure 5 : Drill Hole 2025, South Zone