Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

AAZ.V ·

Azincourt Energy Plans Inaugural Work Program at the Snegamook Uranium Project Permits received Up to 1000 meters of initial drilling planned to confirm and expand known uranium mineralization

Drill Results Permits & Approvals

Azincourt Energy Plans Inaugural Work

Program at the Snegamook Uranium Project

Permits received

Up to 1000 meters of initial drilling planned to confirm and expand known uranium

mineralization

Vancouver, British Columbia--(Newsfile Corp. - March 25, 2025) -

AZINCOURT ENERGY CORP.

(TSXV: AAZ) (OTCQB: AZURF)

("

Azincourt

" or the "

Company

"), is pleased to announce that it has

permitting for an exploration program at its recently acquired Snegamook uranium project (the "Project"),

located in the Province of Newfoundland and Labrador.

SUMMARY:

Azincourt Energy

has received permitting for and will begin exploration at its newly acquired

Snegamook Uranium Project

in Canada's Central Mineral Belt, near the historical Two Time

Zone deposit (Indicated and Inferred resource of 5.55 Mlb U

3

O

8

, June 2008)*.

Historical drilling at the Snegamook Project revealed

shallow-dipping uranium lenses

with

grades up to

0.11% U

O

, indicating strong potential for further discovery.

The Company's

2025 work program

includes site reconnaissance, review of historical drill core,

and up to

1,000 meters of helicopter-supported diamond drilling

to confirm and expand

known mineralization.

The Project is strategically located to the southeast of Snegamook Lake within Labrador's Central

Mineral Belt and less than 1 km south of the Two Time Zone (Indicated and Inferred resource of 5.55 Mlb

U

3

O

8

, June 2008)*, formerly held by Silver Spruce Resources Inc. as part of a larger land package, and

consists of a mineral licence block comprised of 17 contiguous claims covering 423 hectares.

Drilling to follow up a radon gas anomaly identified the

"Snegamook Zone"

uranium occurrence

located 1.3 km along strike to the southeast of the Two Time Zone (

Figure 1, below

). Four mineralized

lenses were traced over a strike length of 300 meters and to a vertical depth of 200 meters.

The lenses

are shallow dipping (15 to 20 degrees west) and vary in width from five to 53 meters with values ranging

from 225 to 771 ppm U

3

O

8

. Individual one-meter samples returned values up to 0.11% U

3

O

8

.

Figure 1: Snegamook and Two Time Zone mineralization map

To view an enhanced version of this graphic, please visit:

https://images.newsfilecorp.com/files/6137/245932_2f160edf74e9bb12_002full.jpg

Mineralization and related hydrothermal alteration appear to be structurally controlled within lineaments

crosscutting the host intrusive gneissic units. The zones appear to be disrupted to the south and down

dip by steeply dipping fault structures that displace the basement gneiss but remain open to the north.

Drilling to test a radon gas anomaly 500 meters to the south of the Snegamook Zone also intersected

zones of mineralization with grades up to 0.11% U

3

O

8

over 3 m and 0.11% U

3

O

8

over 2 m.

The Company is proposing an initial program of site reconnaissance and assessment of historical core

located at the site of the old exploration camp from 2008, to be followed by up to 1,000 m of diamond

drilling to confirm the existing mineralization within the Snegamook Zone and begin to expand the

unnamed showing identified to the south.

The program is anticipated to utilize one helicopter supported

drill rig based out of a temporary work camp in the area.

All equipment and supplies would be staged out

of Happy Valley - Goose Bay, approximately 100 km to the south.

It is anticipated that the

reconnaissance phase of the program will be undertaken in June with the diamond drilling conducted in

late summer to early fall.

"We are excited to get on the ground at Snegamook and begin to expand this deposit" said Vice

President, Exploration Trevor Perkins.

"The Project has great potential, and historical work has just given

a hint of what may be in store for us to discover," continued Mr. Perkins.

Figure 2: Snegamook Project Location Map - Central Mineral Belt, Labrador, Canada.

To view an enhanced version of this graphic, please visit:

https://images.newsfilecorp.com/files/6137/245932_2f160edf74e9bb12_003full.jpg

*

The historical interpretation and drill intersections described here in have not been verified and are extracted from news releases issued by

Silver Spruce Resources Inc on April 24, 2008, and August 12, 2008, as well as annual Management Discussion and Analysis documents filed on

www.sedarplus.ca

, and disclosure published on the website for Paladin Energy Limited (

www.paladinenergy.com.au

).

The Company has not

completed sufficient work to confirm and validate any of the historical data from the Snegamook occurrence.

The Company considers the

historical work a reliable indication of the potential of the Project and the information may be of assistance to readers.

Qualified Person

The technical information in this news release has been prepared in accordance with the Canadian

regulatory requirements set out in National Instrument 43-101, reviewed, and approved on behalf of the

company by C. Trevor Perkins, P.Geo., Vice President, Exploration of Azincourt Energy, and a Qualified

Person as defined by National Instrument 43-101.

About Azincourt Energy Corp.

Azincourt is a Canadian-based resource company specializing in the strategic acquisition, exploration,

and development of alternative energy/fuel projects. The Company has been a uranium explorer for over

a decade and is currently active at its majority-owned joint venture East Preston uranium project located

in the Athabasca Basin, Saskatchewan.

ON BEHALF OF THE BOARD OF AZINCOURT ENERGY CORP.

"Alex Klenman"

Alex Klenman, President & CEO

For further information please contact:

Alex Klenman, President & CEO

Tel: 604-638-8063

[email protected]

Azincourt Energy Corp.

1430 - 800 West Pender Street

Vancouver, BC V6C 2V6

www.azincourtenergy.com

Cautionary Statement Regarding Forward-Looking Statements

This news release may contain certain "Forward-Looking Statements" within the meaning of the

United States Private Securities Litigation Reform Act of 1995 and applicable Canadian securities

laws. When or if used in this news release, the words "anticipate", "believe", "estimate", "expect",

"target, "plan", "forecast", "may", "schedule" and similar words or expressions identify forward-looking

statements or information. Such statements represent the Company's current views with respect to

future events and are necessarily based upon a number of assumptions and estimates that, while

considered reasonable by the Company, are inherently subject to significant business, economic,

competitive, political, and social risks, contingencies and uncertainties. Many factors, both known and

unknown, could cause results, performance, or achievements to be materially different from the

results, performance or achievements that are or may be expressed or implied by such forward-

looking statements. The Company does not intend, and does not assume any obligation, to update

these forward-looking statements or information to reflect changes in assumptions or changes in

circumstances or any other events affecting such statements and information other than as required

by applicable laws, rules, and regulations.

Neither the TSX Venture Exchange nor its regulation services provider (as that term is defined in the

policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this

release.

To view the source version of this press release, please visit

https://www.newsfilecorp.com/release/245932