Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

AAZ.V ·

Azincourt Energy JV Partner Signs Exploration Agreement with Sagkeeng First Nation

Partnerships & JV

1430 – 800 West Pender Street

Vancouver, BC V6C 2V6

[email protected]

AZINCOURT ENERGY JV PARTNER SIGNS EXPLORATION

AGREEMENT WITH SAGKEENG FIRST NATION

Vancouver, BC – October 25, 2018 - Azincourt Energy Corp. (“Azincourt” or the “Company”)

(TSX-V: AAZ, OTC: AZURF) is pleased to announce that its joint venture partner, New Age

Metals (TSX.V: NAM), has signed an Exploration Agreement with the Sagkeeng First Nation, the

result of which provides a clear path to the Company’s proposed drill programs at the Lithium One

and Lithium Two projects.

The agreement is designed to promote a cooperative and mutually respectful relationship and

ensure that Sagkeeng has been properly consulted and accommodated regarding mineral

exploration activities undertaken by in Sagkeeng’s traditional territory.

“We’re very pleased New Age Metals was able to reach an agreement with the Sagkeeng Nation

and are grateful to Chief Henderson and the others who worked together to get this agreement in

place,” said Alex Klenman, President & CEO. “This is a major step toward developing our lithium

projects and we’re happy to be able to move forward in short order and complete our work

commitments for year one of the joint venture agreement. We believe very strongly the projects

have tremendous upside and are pleased to get the all important first phase drilling components

completed,” continued Mr. Klenman.

There is a total of eight projects totaling over 14,000 hectares in three distinct areas that comprise

the AAZ-NAM joint venture lithium exploration and development agreement. Work programs

this past summer and fall confirmed the presence of several hundred pegmatites across the various

project locations. Sampling at the Lithium Two project, specifically the Eagle and FD5 Pegmatites,

returned the presence of high-grade Li2O (Lithium Oxide). See Company news release of August

16, 2018 for more details.

Lithium Two Project

 Channel samples obtained in the summer of 2018 at the Eagle Pegmatite returned values

from 0.5 to 2.9% Li2O, with assays from the FD5 Pegmatite returning values from 0.9 to

3.3% Li2O.

 Several known Spodumene bearing pegmatites are present, including the 1100-meter long

Eagle Pegmatite which was drilled in 1947 and contains an historic (non-43-101 compliant)

tonnage estimate of 544,460 tonnes grading 1.4% Li2O* to the 61-meter level and remains

open to depth. The FD5 Pegmatite, located east of the Eagle Pegmatite, has never been

drilled.

 All samples obtained at Lithium Two his past summer returned lithium values, with 14

samples returning greater than 1000 ppm Li.

 To check the purity of the spodumene at Lithium Two, a sample of spodumene blade

obtained in the summer of 2018 was extracted from the FD5 Pegmatite. This sample

yielded an assay value of 7.62% Li2O. A review of Spodumene Mineral Data indicates

that spodumene can contain Li2O content from 3.73% to 8.03% Li2O. This would tend to

indicate that the spodumene present in the pegmatite dykes on the project is high in purity.

Lithium One Project

 Field work in 2016 sampled several historical pegmatites

 Grab samples of the pegmatitic granites and pegmatites in the project area returned values

from 0.00 to 4.33% Li2O with the high values obtained at the Silverleaf Pegmatite

 Several of the other pegmatites in the project area yielded lithium values from lepidolite

and spodumene

 Approximately 40 pegmatites are estimated to exist north of Greer Lake, with around 100

to the south of the lake

 The Silverleaf Pegmatite was excavated and mined for spodumene in the 1920’s, with

surface exposure of 80 m X 45 m

Figure 1 – Project areas under new Exploration Agreement with the Sagkeeng Nation

Azincourt Energy – New Age Metals Lithium Joint Venture

The pegmatites in this region of southeast Manitoba are described as being a part of the Winnipeg

River Pegmatite Field. Several large lithium-bearing pegmatites exist in this region and exploration

activity in the region is increasing. This pegmatite field is host to the world-class Tanco Pegmatite,

which is a highly fractionated Lithium-Cesium-Tantalum (LCT Type) pegmatite and has been

mined in varying capacities since 1969. The LCT-type pegmatites can contain large amounts of

spodumene (one of the primary ores used in hard rock lithium extraction) and are a primary

geological target in hard rock lithium exploration. They also can contain economic qualities of

tantalum and cesium as well as other lithium bearing minerals such as mica. With eight projects

totaling over 14,000 hectares the Azincourt-New Age JV is the largest claim holder for Lithium

Projects in the Winnipeg River Pegmatite Field. For a map of the project locations please visit

www.azincourtenergy.com.

* Note: The mineral reserve estimate cited above as part of the Lithium Two project is presented

as a historical estimate which does not conform to current NI 43-101 standards. A qualified person

has not done sufficient work to classify the historical estimate as current mineral resources or

mineral reserves. Although the historical estimates are believed to be based on reasonable

assumptions, they were calculated prior to the implementation of National Instrument 43-101

standards. The Company is not treating the historical estimate as current mineral resources or

mineral reserves.

About Azincourt Energy Corp.

Azincourt Energy is a Canadian-based resource company specializing in the strategic acquisition,

exploration and development of alternative energy/fuel projects, including uranium, lithium, and

other critical clean energy elements. The Company is currently active at its joint venture East

Preston and Patterson Lake North uranium projects in the Athabasca Basin, Saskatchewan,

Canada, and its lithium exploration projects in the Winnipeg River Pegmatite Field, Manitoba,

Canada.

ON BEHALF OF THE BOARD OF AZINCOURT ENERGY CORP.

“Alex Klenman”

Alex Klenman, President & CEO

Neither the TSX Venture Exchange nor its regulation services provider (as that term is defined in

the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of

this release.

This press release includes “forward-looking statements”, including forecasts, estimates,

expectations and objectives for future operations that are subject to a number of assumptions, risks

and uncertainties, many of which are beyond the control of Azincourt. Investors are cautioned

that any such statements are not guarantees of future performance and that actual results or

developments may differ materially from those projected in the forward-looking statements. Such

forward-looking information represents management’s best judgment based on information

currently available. No forward-looking statement can be guaranteed, and actual future results

may vary materially.

For further information please contact:

Alex Klenman, President & CEO

Tel: 604-638-8063

[email protected]

Azincourt Energy Corp.

1430 – 800 West Pender Street

Vancouver, BC V6C 2V6

www.azincourtenergy.com