Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

AAZ.V ·

Azincourt Energy Extends Alteration Zone at the East Preston Uranium Project

Drill Results

AZINCOURT ENERGY EXTENDS ALTERATION ZONE AT THE EAST

PRESTON URANIUM PROJECT

• Significant Alteration in K-Zone increased to 1200 meters

• Budget increased to maximize impact of winter program

Vancouver B.C., March 16, 2022 - AZINCOURT ENERGY CORP. (“Azincourt” or the

“Company”) (TSX.V: AAZ , OTC QB: AZURF ), is pleased to provide an update on the 2022

exploration program at the East Preston uranium project, located in the western Athabasca Basin,

Saskatchewan, Canada.

Drilling at the East Preston Project commenced on January 24th, and to date, 4,301 meters have been

completed in 18 drill holes. Despite being plagued by extreme cold weather and its associated

logistics and mechanical problems, two drill rigs are operational on the project. 15 drill holes are

complete, one was abandoned, and two are in progress on the K - and H- Zones. Prior progress has

been reported in previous press releases dated February 14th, 2022, and March 1st, 2022.

TerraLogic Exploration Inc . is executing the winter 2022 diamond drilling program under the

guidance and supervision of Azincourt’s Vice President, Exploration, Trevor Perkins, P.Geo, and

Jarrod Brown, M.Sc., P.Geo, Chief Geologist and Project Manager with TerraLogic Exploration. The

program is planned for approximately 5,500m of drilling. Drilling focused on the A-G and K-H-Q

trends and commenced in the G-Zone where the 2021 drill program ended. The program continue s

to evaluate the K-H-Q trend (Figure 2).

Drilling on the northeast trending G-Zone (Figure 3) was halted with nine holes completed. Extensive

hydrothermal alteration and evidence of east-west cross-cutting structures have been intersected along

the southern portion of the zone. The alteration zone is highlighted in holes EP0030 and EP0037 with

intervals of hydrothermal hematite alteration and extensive evidence for a steep east-west fault cross-

cutting the main northeast trending structure and graphitic lithologies. An evaluation of the structural

data and geochemistry will be undertaken to aid in planning for addit ional follow-up drilling and

evaluation of this area in the next drill program.

On the north-south trending K-Zone (Figure 3), five holes have been completed and one is in progress.

One hole was lost in a sand filled fault zone at the north end of the zone. Drilling on the K-Zone has

intersected extensive hydrothermal hematite alteration in all holes, indicating this alteration zone is

at least 1200 meters long. E xtensive zones of hydrothermal hematite have been intersected in all

holes, with clay alter ation also being present. Additional drilling is underway to evaluate the

significance of this alteration zone and follow -up the elevated radioactivity ( in excess of 10 times

background values, identified from both handheld scintillometers and a downhole gamma probe )

previously reported in the Company’s news release dated March 1 st, 2022. Samples from this zone

have been sent to the lab to evaluate the significance of the elevated radioactivity in this area.

The H-Zone covers a change in orientation of the structural and conductive trend from north south to

southwest trending (Figure 2). One hole has been completed on the north part of the trend and one is

in progress. The first hole on the H-Zone has intersected a thick zone of hydrothermal alteration and

an intense graphitic fault zone. Whether this zone is a continuation of that in K -Zone or constitutes

a new alteration zone is yet to be determined. Drilling will continue to evaluate this zone.

The company considers the drilling results to date to be significant, as major uranium discoveries in

the Athabasca Basin such as McArthur River, Key Lake, and Millennium were primarily the result of

drill testing of strong alteration zones related to conductor features. Identifying the strong alteration

zones is a significant step forward in identifying the key areas along the conductor trends where more

attention is required. As a consequence of the promising results to date, many holes have been drilled

significantly deeper than initially planned to get through alteration and structure intersected, and

additional holes are being drilled to follow up key results.

With the discovery of this alteration zone, planned overall meterage in this drill program is expected

to be achieved, however fewer total holes may be completed . In addition, the planned holes for Q -

Zone have been postponed allowing further evaluation of th e favourable findings encountered thus

far in both the K- and H-Zones.

Increased costs associated with colder weather, and changes to the program due to the discovery of

the alteration zone, have resulted in an increase to the overall program budget. Incurring increased

costs now will help facilitate the acquisition of as much critical data as possible during the current

field season.

“We are encouraged by the response we are seeing in the K -Zone,” said VP, Exploration, Trevor

Perkins. “ The extensive alteration we have encountered is very encouraging. I am curious to see

what H -Zone may reveal and how it relates to what we are already seeing in K -Zone. This just

reinforces the need to focus extensively in these areas,” continued Mr. Perkins.

“The extension of the alteration, now to over a kilometer in length, is a significant development,” said

Alex Klenman, President and CEO. “ The zone is large and appears to be getting larger, and it’s

showing very positive geological characteristics. This is what we need to see, what we want to see.

Chasing this type of alteration has been established as an effective method of making meaningful

discovery. The fact that this zone continues as we move south speaks to the need to keep drilling in

this area. We’re excited by the results so far and we’re eager to see what more holes in this area

reveal,” continued Mr. Klenman.

The property is accessed via a 73 km winter road from Highway 955. Accurate Industries is

maintaining the winter access road and facilitat ing transport of fuel and supplies to camp for the

duration of the program. Discovery Mining Services is maintaining and managing the exploration

camp at Snoop Lake and Full Force Drilling Ltd is providing two diamond drill rigs and conducting

the drilling program, which is expected to continue until mid to late March. Significant snowfall and

blowing snow have resulted in extra ti me and effort being put in to maintaining the access roads to

ensure safe and consistent accessibility.

East Preston Targets

The primary target area for the 2022 program continues to be the conductive corridors from the A -

Zone through to the G -Zone (A-G Trend) and the K -Zone through to the H and Q -Zones (K-H-Q

Trend) (Figures 1 and 2). The selection of these trends is based on a compilation of results from the

2018 through 2020 ground- based EM and gravity surveys, property wide VTEM and magnetic

surveys, a nd the 2019 through 2021 drill programs, the 2020 HLEM survey indicates multiple

prospective conductors and structural complexity along these corridors.

The 2019-2021 drilling programs on the A-G Trend confirmed that geophysical conductors comprise

structurally disrupted zones that are host to accumulations of graphite, sulphides, and carbonates.

Anomalous radioactivity has been demonstrated to exist within these structurally disrupted conductor

zones. The 2022 drilling program will target similar structurally disrupted zones prioritized on the

presence and strength of corresponding electromagnetic , magnetic and gravity geophysical

anomalies.

Permitting and Community Engagement

Permits are in place to complete all the planned work through the winter of 2022. Azincourt Energy

continues to be engaged in regular meetings with the Clearwater River Dene Nation and other rights

holders to ensure that concerns of the local communities are addressed. Azincou rt looks forward to

a continued close working relationship with CRDN and other rights holders to ensure that any

potential impacts and concerns are addressed and that the communities can benefit from activities in

the area through support of local business , employment opportunities, and sponsorship of select

community programs and initiatives . Several members of the Clearwater River Dene Nation are

directly employed on site or provide support and services to keep the camp and program running.

Figure 1: Target corridors at the East Preston Uranium Project, Western Athabasca Basin

Saskatchewan

Figure 2: 2022 Drill progress and Target areas at the East Preston Uranium Project

Figure 3: Project Location – Western Athabasca Basin, Saskatchewan, Canada

About East Preston

Azincourt controls a majority 72.8% interest in the 25,000+ hectare East Preston project as part of a

joint venture agreement with Skyharbour Resources (TSX.V: SYH), and Dixie Gold. Three

prospective conductive, low magnetic signature corridors have been discovered on the property. The

three distinct corridors have a total strike length of over 25 km, each with multiple EM conductor

trends identified. Ground prospecting and sampling work completed to date has identi fied outcrop,

soil, biogeochemical and radon anomalies, which are key pathfinder elements for unconformity

uranium deposit discovery.

The East Preston Project has multiple long linear conductors with flexural changes in orientation and

offset breaks in the vicinity of interpreted fault lineaments – classic targets for basement -hosted

unconformity uranium deposits. These are not just simple basement conductors; they are clearly

upgraded/enhanced prospectivity targets because of the structural complexity.

The targets are basement-hosted unconformity related uranium deposits similar to NexGen’s Arrow

deposit and Cameco’s Eagle Point mine. East Preston is near the southern edge of the western

Athabasca Basin, where targets are in a near surface environment without Athabasca sandstone cover

– therefore they are relatively shallow targets but can have great depth extent when discovered. The

project ground is located along a parallel conductive trend between the PLS -Arrow trend and

Cameco’s Centennial deposit (Virgin River-Dufferin Lake trend).

Qualified Person

The technical information in this news release has been prepared in accordance with the Canadian

regulatory requirements set out in National Instrument 43-101 and reviewed on behalf of the company

by C. Tre vor Perkins , P.Geo., Vice President, Exploration of Azincourt Energy, and a Qualified

Person as defined by National Instrument 43-101.

About Azincourt Energy Corp.

Azincourt Energy is a Canadian- based resource company specializing in the strategic acquisition,

exploration, and development of alternative energy/fuel projects, including uranium, lithium, and

other critical clean energy elements. The Company is current ly active at its majority -owned joint

venture East Preston uranium project, and it’s recently acquired Hatchet Lake uranium project, both

located on the edges of the Athabasca Basin, Saskatchewan, Canada, and the Escalera Group uranium-

lithium project, located on the Picotani Plateau in southeastern Peru.

ON BEHALF OF THE BOARD OF AZINCOURT ENERGY CORP.

“Alex Klenman”

Alex Klenman, President & CEO

Neither the TSX Venture Exchange nor its regulation services provider (as that term is defined in the

policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this

release.

This press release includes “forward-looking statements”, including forecasts, estimates, expectations

and objectives for future operations that are subject to a number of assumptions, risks and

uncertainties, many of which are beyond the control of Azincourt. Investors are cautioned that any

such statements are not guarantees of future performance and that actual results or developments may

differ ma terially from those projected in the forward -looking statements. Such forward -looking

information represents management’s best judgment based on information currently available. No

forward-looking statement can be guaranteed, and actual future results may vary materially.

For further information please contact:

Alex Klenman, President & CEO

Tel: 604-638-8063

[email protected]

Azincourt Energy Corp.

1430 – 800 West Pender Street

Vancouver, BC V6C 2V6

www.azincourtenergy.com