Azincourt Energy Commences Work Program at Escalera Urainum Project, PERU
1430 – 800 West Pender Street
Vancouver, BC V6C 2V6
AZINCOURT ENERGY COMMENCES WORK PROGRAM AT
ESCALERA URAINUM PROJECT, PERU
Vancouver, BC – October 24, 2018 - Azincourt Energy Corp. (“Azincourt” or the “Company”)
(TSX-V: AAZ, OTC: AZURF) is pleased to announce the commencement of its initial work
program at the recently acquired series of uranium-lithium exploration projects located in the
Picotani volcanic field in Carabaya and San Antanio De Putina Provinces, Puno Region, in
southeastern Peru, collectively known as the “Escalera Group”.
The Projects cover a combined area of 7,400 hectares of prospective exploration targets for
volcanic hosted supergene/surficial uranium and lithium on the Picotani Plateau (or “mesata” in
Spanish). Surface rock samples obtained in 2017 from the Escalera project were processed by
ALS Minerals, in Lima, Peru, and returned values of up to 3,560 ppm uranium and 153 ppm
lithium. Historical samples taken from the Escalera project have yielded values up to 6,812 ppm
uranium* (see table below).
A crew of experienced geologists familiar with the area are assembling in country over the next
ten days and are immediately commencing a comprehensive phase one work program at all three
concessions forming the Escalera Group (Escalera, Lituania, Condorlit), which is expected to last
throughout the month of November.
First phase ground work will include detailed reconnaissance to locate favorable outcroppings
and known host rock formations, focused ground radiometric geophysical surveys using hand
portable scintillometers to test for elevated radioactivity at surface, and a comprehensive channel
sampling program.
“We’re pleased to get on the ground and start the work programs there,” said president & CEO,
Alex Klenman. “As we know, the Macusani-Crucero-Picotani area is very mineral-rich
environment, with uranium, lithium and other metals present. Both recent and historical
sampling at the Escalera Group have returned very solid uranium numbers, so we’d like to
confirm and expand on that success. The data we glean from this initial work program will give
us a better understanding of the geological footprints at each site and will allow us to zero-in on
drill targets. Our goal is to get the projects to drill-ready status as soon as possible,” continued
Mr. Klenman.
The initial work program will focus on full digital data compilation of detailed geological
mapping, reconnaissance level scintillometer radioactivity surveying, and surface rock and soil
sampling with the purpose of generating high-priority drill targets for subsequent work
programs. The program is being managed by Michael Moore, P. Geo., who has both extensive
Latin American and uranium exploration experience. Results from this program will be released
once received, reviewed and verified.
The Macusani-Crucero-Picotani Volcanic Fields have been of interest for uranium exploration
since the 1980’s. A 1981 report by the International Atomic Energy Agency** examined the
Macusani-Crucero-Picotani area and concluded “…the large Crucero to Picotani basin, although
having less well exposed occurrences may have more potential. Isolated outcrops of the volcanic
sequence around the rim of the basin may have been available both during sedimentation and
later basin evolution, leading to the accumulation of significant deposits.”
The projects are accessible year-round via paved/dirt road access, with a national airport only
130km to the south.
Figure 1 – Project Location Map
Historical sample results – Escalera Project
** IUREP Orientation Phase Mission Report, PERU, Donald L. Hetland, Uisdean McL. Michie,
August-October 1981
Qualified Person
The technical information in this news release has been reviewed and approved by Michael Moore,
P.Geo, an independent Qualified Person under National Instrument 43-101.
About Azincourt Energy Corp.
Azincourt Energy is a Canadian-based resource company specializing in the strategic acquisition,
exploration and development of alternative energy/fuel projects, including uranium, lithium, and
other critical clean energy elements. The Company is currently active at its joint venture East
Preston and Patterson Lake North uranium projects in the Athabasca Basin, Saskatchewan,
Canada, and its lithium exploration projects in the Winnipeg River Pegmatite Field, Manitoba,
Canada.
ON BEHALF OF THE BOARD OF AZINCOURT ENERGY CORP.
“Alex Klenman”
Alex Klenman, President & CEO
Neither the TSX Venture Exchange nor its regulation services provider (as that term is defined in
the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of
this release.
This press release includes “forward-looking statements”, including forecasts, estimates,
expectations and objectives for future operations that are subject to a number of assumptions, risks
and uncertainties, many of which are beyond the control of Azincourt. Investors are cautioned
that any such statements are not guarantees of future performance and that actual results or
developments may differ materially from those projected in the forward-looking statements. Such
forward-looking information represents management’s best judgment based on information
currently available. No forward-looking statement can be guaranteed and actual future results may
vary materially.
For further information please contact:
Alex Klenman, President & CEO
Tel: 604-638-8063
Azincourt Energy Corp.
1430 – 800 West Pender Street
Vancouver, BC V6C 2V6
www.azincourtenergy.com