Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

AAZ.V ·

Azincourt Energy Announces Agreement to Expand the BIG Hill Lithium Project, Newfoundland, Canada

Property Options & Staking

LEGAL*60541771.2

AZINCOURT ENERGY ANNOUNCES AGREEMENT TO EXPAND THE

BIG HILL LITHIUM PROJECT, NEWFOUNDLAND, CANADA

Vancouver B.C., October 19, 2023 - AZINCOURT ENERGY CORP. (“Azincourt” or the

“Company”) (TSX.V: AAZ, OTCQB: AZURF), is pleased to announce that it has entered into a

mineral property purchase and sale agreement (the “Purchase Agreement”), dated effective October

18, 2023 with Atlantis Battery Metals Corp. (“Atlantis”), pursuant to which the Company will acquire

additional ground adjacent to the Company’s Big Hill Lithium Project, located in southwestern

Newfoundland, Canada (the “Acquisition”).

The newly acquired ground consists of 2 mineral licences, 035707M and 035708M, consisting of 153

and 151 claims, respectively, wit h each mineral claim covering 25 hectares. The combined lands

package for these two licences covers a total of 7,600 hectares , which will doubl e the existing Big

Hill project from 7,500 hectares to 15,100 hectares. The new licences lie approximately 25km

eastward and 6.5km south of the Benton/Sokoman Kraken Lithium discovery.

Three high quality targets have been located on the newly acquired licences. These targets include,

the NE-trending, dike system, the Moly Zone, and the Connoire Bay Brook Zone.

Pursuant to the terms of the Purchase Agreement, the aggregate purchase price payable by Azincourt

to Atlantis consists of 5,000,000 common shares of the Company (the “Consideration Shares”). The

Company will also be issuing 500,000 common shares of the Company to an arms-length third-party

as a finder’s fee in connection with the Acquisition (the “Finder Shares”). The Company and Atlantis

are at arms-length. Upon issuance, the Consideration Shares and the Finder Shares will be subject to

a four month hold period as prescribed by applicable securities laws. Completion of the Acquisition

remains subject to the approval of the TSX Venture Exchange.

“We’re pleased we will be able to double the size of Big Hill,” said president and CEO, Alex

Klenman. “With the recent discovery of the previously unidentified pegmatite field we felt it was a

good time to increase the size of the project ground. This is a significant exploration opportunity, in

the right neighborhood, with compelling geological attributes. We’re excited to move forward with

exploration plans and will announce the next phase of work shortly,” continued Mr. Klenman.

The Company recently announced the discovery of a significant pegmatite field at Big Hill w hich

spans for ~400m trending NNE (see the Company’s previous news release dated September 26,

LEGAL*60541771.2

2023). The Big Hill claims are underexplored for lithium, and thanks to the highly impactful Kraken

find, the Company feels the area is prospective for additional discoveries. The project has size,

numerous priority targets, and the potential for many more. With year -round access, this project

gives Azincourt the ability to be active throughout the year.

Figure 1: Azincourt’s Big Hill Lithium Project, with additional licenses in red, Newfoundland

All of the known target areas have potential for spodumene -bearing pegmatites near the marginal

areas of the Burgeo Granite Intrusive Suite, including gold mineralization like Marathon Gold’s

Valentine Lake deposit located north of the Hermitage Flexure.

A recommended next phase exploration program (Phase I) would include any and all of the following:

(a) additional helicopter supported prospecting, mapping, and sampling, (b) rapid a nalytical field

analyses (portable XRF/spectrometer), and a Phase II program consisting of (c) till sampling for

spodumene where cover masks the bedrock, (d) high- resolution drone-based geophysics including,

but not limited to, radiometric and lidar surveys, (e) a high-resolution drone photographic survey, and

(f) targeted trenching where lithium -bearing pegmatites are verified, followed by a Phase II limited

diamond drill program (1,500 meters).

LEGAL*60541771.2

Figure 1: Selected photos from Big Hill Lithium Project area, (a) large, silicified pegmatite boulder

(b, c, d) in situ quartz -tourmaline±pyrite veins, (e) brecciated quartz vein, (f) silicified pegmatite

boulder.

Based on the Newfoundland mineral occurrence database, W, Mo, Pb, F, Zn, Cu, Au, Ag, Sn, Ba, Bi,

and U mineralization is common throughout the project region and may also be conducive for LCT

pegmatite formation. The discovery of spodumene-bearing pegmatites at the Kraken prospect opens

the potential of more widespread lithium pegmatite mineralization throughout the area.

The regional presence of widespread mineralization, the discovery of the Kraken Li deposit, and the

general lack of historical exploration provides an opportunity to find new mineralization. The five

mineral licenses of the Big Hill project have potential for lithium, molybdenum, fluorite, tin, tungsten,

uranium, tantalum, and other rare metals.

About the Big Hill Lithium Project

The Big Hill Lithium Project is a 15,100- hectare Lithium-Cesium-Tantalum (“LCT”) exploration

property located in southwestern Newfoundland, Canada, along the south side of the Hermitage

Flexure, approximately five kilometres south of the Benton/Sokoman JV partnership (“the Alliance”)

discovery of the Kraken Lithium Pegmatite Field (1.04% Li2O over 15.23m, 8.4m of 0.95% Li2O,

and 5.5m of 1.16% Li2O*). The Benton/Sokoman JV partnership has also discovered the cesium -

tantalum-rubidium-lithium Hydra Dyke which is located 12 kilometres northeast of the Kraken

Lithium Pegmatite Field. Channel samples returned results as high as 8.76% Cs 2O, 0.41% Li 2O,

0.025% Ta2O5, and 0.33% Rb2O over 1.20m*.

LEGAL*60541771.2

The Kraken Lithium Pegmatite discovery features numerous granitic dykes and unmapped pegmatites

in a variety of rock types with a strike length up to 40 kilometres in length. The Big Hill Lithium

Property is host primarily in the Burgeo granite with large enclaves of older mafic paragneiss. The

boundary between the two properties is marked by the Hermitage Flexure, which in part appears to

be locally segmented by sub-parallel fault segments, and the intrusive contact between the Burgeo

granite and older stratigraphy. Similar structural controls are recognized within the global tectonic

boundary stretching from the Carolina Tin- Spodumene Belt, through Avalonia in Nova Scotia, to

Newfoundland, and then on to Laurentia (Leinster) on the east side of the Atlantic Ocean.

At the Big Hill Lithium Pro ject numerous granite dykes can be seen cutting the Burgeo granite .

Coarse-grained pegmatite dykes greater than 2 meters wide and 20 meters long occur south of the

property and are anticipated to be present on the Big Hill exploration licences.

Recent preliminary prospecting at Big Hill has identified four known target ar eas, based on

extrapolation of bedrock geology, structural disaggregation of stratigraphic blocks, and apparent

folding and late shear faulting. Similar structural elements are observed in the Kraken Lithium

Pegmatite field although host rocks differ. Th ese targets are known as the River, Road, MK, and

Ridge Targets and will be the focus the initial exploration.

The area around the Big Hill Lithium Project has seen extensive mineral exploration over the past

several decades. The Peter Snout mineral occ urrences immediately east of the Kraken Lithium

Pegmatite discovery and the White Bear River area further to the northeast have seen exploration for

many years for polymetallic mineralization, but not for lithium until 2021.

* Sokoman Minerals Corp., news release March 28, 2023

Qualified Person

The technical information in this news release has been prepared in accordance wi th the Canadian

regulatory requirements set out in National Instrument 43-101 and reviewed on behalf of the company

by Paul K. Smith, a Qualified Person as defined by National Instrument 43-101.

About Azincourt Energy Corp.

Azincourt is a Canadian -based resource company specializing in the strategic acquisition,

exploration, and development of alternative energy/fuel projects, including uranium, lithium, and

other critical clean energy elements. The Company is currently active at its joint venture East Preston

uranium project located in the Athabasca Basin, Saskatchewan, and the Big Hill lithium project,

located in southwestern Newfoundland.

ON BEHALF OF THE BOARD OF AZINCOURT ENERGY CORP.

“Alex Klenman”

Alex Klenman, President & CEO

LEGAL*60541771.2

For further information please contact:

Alex Klenman, President & CEO

[email protected]

Azincourt Energy Corp.

1012 – 1030 West Georgia Street

Vancouver, BC V6E 2Y3

www.azincourtenergy.com

Cautionary Statement Regarding Forward-Looking Statements

This news release contains “forward- looking statements” or “forward- looking information”

(collectively, “forward-looking statements”) within the meaning of applicable securities legislation.

All statements, other than statements of historical fact, are forward-looking statements and are based

on expectations, estimates and projections as of the date of this news release. Forward- looking

statements include, but are not limited to, statements regarding the Acquisition, and the Company's

business and plans, including with respect to completing the Acquisition, carrying out exploration

activities in respect of its Big Hill Lithium P roject, timing of the Company’s exploration programs ,

the Company’s next phase of exploration, additional discoveries and mineralization, and estimates

of market conditions.

Forward-looking statements are subject to a variety of known and unknown risks, uncertainties and

other factors that could cause actual events or results to differ from those expressed or implied by

forward-looking statements contained herein. There can be no assurance that such statements will

prove to be accurate, as actual results and future events could differ materially from those anticipated

in such statements. Certain important factors that could cause actual results, performance or

achievements to differ materially from those in the forward-looking statements are highlighted in the

“Risks and Uncertainties” in the Company’s management discussion and analysis for the fiscal year

ended September 30, 2022, dated January 30, 2023, and also include the risks that the Acquisition

does not complete as contemplated, or at all; that the Company does not complete any further

acquisitions; that the Company does not carry out exploration activities in respect of its mineral

project as planned (or at all); and that the Company may not be able to carry out its business plans

as expected.

Forward-looking statements are based upon a number of estimates and assumptions that, while

considered reasonable by the Company at this time, are inherently subject to significant business,

economic and competitive uncertainties and contingencies that may cause the Company’s actual

financial results, performance, or achievements to be materially different from those expressed or

implied herein. Some of the material factors or assumptions used to develop forward- looking

statements include, without limitation: the future price of minerals ; anti cipated costs and the

Company’s ability to raise additional capital if and when necessary; volatility in the market price of

the Company’s securities; future sales of the Company’s securities; the Company’s ability to carry

LEGAL*60541771.2

on exploration and development activities; the success of exploration, development and operations

activities; the timing and results of drilling programs; the discovery of mineral resources on the

Company’s mineral properties; the costs of operating and exploration expenditures; the presence of

laws and regulations that may impose restrictions on mining; employee relations; relationships with

and claims by local communities and indigenous populations; availability of increasing costs

associated with mining inputs and labour; the speculati ve nature of mineral exploration and

development (including the risks of obtaining necessary licenses, permits and approvals from

government authorities); uncertainties related to title to mineral properties; assessments by taxation

authorities; fluctuations in general macroeconomic conditions.

The forward- looking statements contained in this news release are expressly qualified by this

cautionary statement. Any forward-looking statements and the assumptions made with respect thereto

are made as of the date of this news release and, accordingly, are subject to change after such date.

The Company disclaims any obligation to update any forward-looking statements, whether as a result

of new information, future events or otherwise, except as may be required by applicable securities

laws. There can be no assurance that forward-looking statements will prove to be accurate, as actual

results and future events could differ materially from those anticipated in such statements.

Accordingly, readers should not place undue reliance on forward-looking statements.

Neither the TSX-V nor its Regulation Services Provider (as that term is defined in the policies of the

TSX-V) accepts responsibility for the adequacy or accuracy of this release.