FOR IMMEDIAT E RELEASE Aton reports wide zones of surface mineralisation from channel sampling at Semna and final RC drill results from Zeno

Drill Results Exploration Programs

FOR IMMEDIAT E RELEASE

Aton reports wide zones of surface mineralisation from

channel sampling at Semna and final RC drill results

from Zeno

Vancouver, British Columbia, February 1, 2024: Aton Resources Inc. (AAN: TSX-V) (“Aton” or the “Company")

is pleased to update investors on further exploration results from its Abu Marawat Concession (“Abu Marawat”

or the “Concession”), in the Eastern Desert of Egypt, including channel sampling results from the new Semna

drill discovery and the final reverse circulation percussion (“RC”) drilling results from the Zeno prospect.

Highlights:

• 7 mechanical saw-cut channel sampling profiles have been completed at the Semna prospect , for a

total length of 331m, along exposed rock faces and drill road cuttings . The channel profiles were

sampled at nominal 2m intervals. Significant mineralised intersections from this programme include:

• 2.80 g/t Au over a 39.3m interval (profile SMC-065), associated with shallow-dipping stockwork

veins on the Central Vein Zone;

• 2.60 g/t Au over a 39.3m interval (profile SMC-066), associated with exposed mineralisation on

the eastern extension of the Main Vein zone; and

• 3.02 g/t Au over a 21.6m interval (profile SMC-069), associated with a narrow footwall structure

to the Main Vein zone;

• At the Zeno prospect 21 RC holes were drilled for a total of 3,216m, with the programme designed to

test a number of different mineralised veins an d structures which had been identified at surface.

Significant mineralised intersections from this programme include:

• 9.77 g/t Au over a 3m interval, from a down hole depth of 42m (hole ZEP-005);

• 4.16 g/t Au over a 6m interval, from a down hole depth of 107m (hole ZEP-020); and

• 2.60 g/t Au over a 5 m interval, from a down hole depth of 74m, and 8.63 g/t Au over a 1 m

interval, from a down hole depth of 87m (both from hole ZEP-016).

“We are pleased to announce more very positive exploration results from our new Semna discovery today, this

time the results from a recent surface channel sampling programme” said Tonno Vahk, CEO. “The results

show broad zones of good grade mineralisation outcropping at surface, and appear to confirm the continuity

of the high grade mineralisation identified in the 2023 RC drilling all the way up to surface. Perhaps most

importantly the results continue to s upport the interpretation of a major structural system at Semna with high

grade mineralisation hosted in multiple veins and structures, and in various orientations. We have now

executed a contract with Geodrill to undertake a second phase of diamond drilling at Semna, as we fast-track

the project. We now expect the drilling to be underway next week , with an initial 5,000m of drilling planned.

We are also pleased to report the final results from the RC drilling at Zeno last year which returned a number

of high grade intersections, from a prosp ect which is only about 4km away from Semna. Aton firmly believes

that the wide r area, on which we are planning an aggressive exploration programme, stretching all the way

from Sir Bakis in the west through Bohlog, Zeno and Black Gaharish to Semna East has excellent potential to

host additional very significant structurally-controlled orogenic gold deposits, similar to what Semna already

appears to be shaping up to be”.

Semna Prospect

The Semna prospect is located approximately 27 km east-northeast of the Hamama West deposit and 13 km

north-northeast of the Rodruin deposit, and is accessed via desert tracks from either Hamama, Rodruin or the

Abu Marawat deposit to the north (Figure 1). The Semna area has a long history of gold mining, during both

ancient and modern times. Archaeological evidence suggests that mining dates back as far as the Old Kingdom

period, over 4,500 years ago. In modern times, Semna was exploited between 1904 and 1906 by two British

companies, which worked the Main Vein on two underground levels. There was also some further development

work carried out at Semna in the 1950’s by an Egyptian company.

Figure 1: Geology plan of the Abu Marawat Concession, showing the location of the Semna and

Zeno prospects

Semna channel sampling

7 channel profiles, SMC-065 to SMC-071, were cut and sampled at the Semna prospect, for a total sampled

length of 331.1m during late 2023 (see Figure 2). Profiles were marked up along exposed faces and drill roads

where appropriate, in areas of potential surface mineralisation. After the faces and road cuttings had been

exposed and cleaned up by an excavator, they were prepared for channel sampling. The channels were

created by cutting 2 parallel cuts, approximately 50mm apart with a large generator -powered angle grinder.

The channel was subsequently sampled using a hammer and chisel with the sampled material excavated from

between the 2 saw cuts, at nominal 2m sample intervals. All channel profiles were mapped and photographed,

and the start and end positions of each sample were surveyed using a differential GPS survey system.

Figure 2: Drill hole collar and channel sampling plan of the Semna prospect

Discussion of results

Details of the mineralised intersections from the channel profile sampling are provided in Table 1. Several well

mineralised zones were identified with intersections including 2.80 g/t Au over a 39.3m interval (profile SMC-

065), 2.60 g/t Au over a 39.3m interval (profile SMC-066), and 3.02 g/t Au over a 21.6m interval (profile

SMC-069).

The mineralisation in profile SMC -065 was associated with a stockwork zone consisting of narrow, primarily

shallow SE-dipping quartz veins, and included several discrete high grade zones. These high grade zones

returned individual sample assays including 19.3, 17.0, 11.95 and 8.59 g/t Au, the last of which was associated

with a shallow ancient working approximately 1.5m in width. The mineralisation is interpreted as being

associated with a shallow cross-structure, which was not intersected in the RC drillin g. This is highly

encouraging as it is suggestive of a significant structural system at Semna with a broader array of mineralised

veins and zones, rather than just a few discrete mineralised structures such as the Main Vein zone (“MVZ”),

which was targeted by the RC drilling (see news release dated December 18, 2023).

The mineralised intersection in profile SMC-066 was sampled at the foot of the mountainside on the margin of

wadi sediments, and is located approximately 40-50m up-dip of the high grade mineralisation intersected in

RC hole SMP -018 (11.98 g/t Au over a 16m interval , see news release dated December 18, 2023 ). The

results from SMC-066 indicate probable near-vertical continuity of this mineralisation to the base of the over -

lying wadi alluvium, and to surface, where its exposed margin was sampled in SMC-066.

The wider zone of mineralisation in profile SMC -069 was associated with a narrow quartz vein located in the

footwall of the MVZ, and returned an assay of 41.9 g/t Au from a 1m wide individual sample, again indicating

the presence of multiple high grade structures at Semna . Lower grade mineralisation was also intersected at

the end of this profile, and is possibly indicative of further blind mineralisation concealed under wadi sediments

immediately to the south of this channel profile.

Profiles SMC -067 and SMC -068 tested a massive white quartz vein approximately 2m wide, which is

interpreted as being a faulted offset of the MVZ. The lower grades in this zone were consistent with the samples

being taken largely from the quartz vein in the se profiles, with the gold interpreted as being largely in the

altered wall rocks, rather than the quartz vein itself. A single 1.7m wide sample from SMC -067 returned an

assay of 5.69 g/t Au from the immediate hangingwall of the quartz vein

Channel Profile Intersection (m)

Au

(g/t)

Ag

(g/t)

Cu 1

(ppm)

Pb 1

(ppm)

Zn 1

(ppm) Comments

ID Length

(m) From To Interval

SMC-065

59.0

2.0 41.3 39.3 2.80 0.4 31 5 49 Shallow SE-

dipping quartz

stockwork zone incl. 2.0 14.0 12.0 1.71 0.3 16 5 36

incl. 18.0 20.0 2.0 17.00 1.7 62 6 29

incl. 29.0 32.0 3.0 15.63 1.7 84 6 38

incl. 40.7 41.3 0.6 8.59 1.2 76 6 49 Sub-vertical CVZ

structure

SMC-066 74.0 13.5 52.8 39.3 2.60 0.4 29 n/a n/a MVZ-EX zone

SMC-067 5.8 0.0 5.8 5.8 2.68 0.5 137 n/a n/a MVZ structure

SMC-068 7.6 0.0 3.7 3.7 0.94 0.4 33 n/a n/a MVZ structure

SMC-069

146.0

6.5 8.2 1.7 2.42 0.3 74 n/a n/a MVZ hangingwall

structure

and 38.4 40.4 2.0 1.26 0.9 300 n/a n/a MVZ footwall

structure and 56.4 78.0 21.6 3.02 0.4 534 n/a n/a

and 127.3 146.0 18.7 0.61 0.3 359 n/a n/a

SMC-070 13.7 - - - - - - - - NSA > 0.40 g/t Au

SMC-071 25.0 - - - - - - - - NSA > 0.49 g/t Au

Notes:

1) Cu, Pb and Zn analyses for profiles SMC-066 to SMC-071 were not undertaken

Table 1: Mineralised intersections from the Semna channel sample profiles

Zeno prospect

The Zeno prospect area is located approximately 4 km west of the Semna gold mine and 12 km north of the

Rodruin mineral deposit (Figure 1). Artisanal miners have been very active in the general Zeno area since

about 2020, and have excavated numerous open pit and underground workings over a wide area on what Aton

believe to be potentially high grade gold mineralised veins and structures. Surface sampling by Aton of visible

gold and iron oxide bearing quartz veins has returned assays including 117.5 g/t Au and 100.5 g/t Au (see

news release dated May 30, 2 018), and more recently 104.5 g/t Au and 67.1 g/t Au (see news release dated

June 26, 2023) . The quartz veins and mineralised structures are almost universally hosted in granodioritic

intrusive rocks at Zeno, belonging to the basement “Older Granites” suite.

Zeno RC drilling

21 drill holes, ZEP -001 to ZEP-020, were drilled at the Zeno prospect, for a total of 3,216 m during the 2023

regional RC drill programme (Figure 1). Collar details of the holes are provided in Table A3 in Appendix A. The

first-pass programme was designed to test a number of mineralised veins and structures, many of which have

been exploited near to surface by artisanal miners or “dahabbas” in recent years.

Figure 3: Zeno prospect RC drill hole collar plan

Hole ID

Intersection (m) Au

(g/t)

Ag

(g/t)

Cu

(ppm)

Pb

(ppm)

Zn

(ppm) Comments

From To Interval

ZEP-001 12 13 1 1.23 0.8 16 3 97

and 50 51 1 4.92 1.7 85 4 1,690

ZEP-004 94 95 1 2.96 0.7 27 2 626

ZEP-005 28 29 1 1.09 0.4 531 1 44

and 42 45 3 9.77 2.3 25 5 47

ZEP-007 45 46 1 1.11 0.2 32 5 43

ZEP-008 76 77 1 1.23 0.3 14 5 45

ZEP-010 58 59 1 2.52 0.2 51 5 103

and 64 66 2 3.50 0.2 47 5 288

ZEP-012 138 140 2 1.71 0.4 36 7 124

ZEP-015 146 147 1 1.23 0.3 10 8 43

ZEP-016 74 79 5 2.60 0.4 28 6 66

and 87 88 1 8.63 1.5 13 7 226

ZEP-018a 97 101 4 2.93 0.8 10 6 28 Re-drill of ZEP-018

ZEP-019 39 40 1 1.48 0.3 47 6 85

ZEP-020 103 104 1 1.62 0.3 19 5 58

and 107 113 6 4.16 0.7 36 6 271

Table 2: Final mineralised intersections from the Zeno RC drilling

Discussion of results

Mineralised intersections from the drilling are presented in Table 2. The majority of the holes intersected narrow

zones of mineralisation, returning intersections including 9.77 g/t Au over a 3m interval (hole ZEP-005), 4.16

g/t Au over a 6m interval (hole ZEP-020), and 2.60 g/t Au over a 5m interval and 8.63 g/t Au over a 1m

interval (both from hole ZEP-018a).

The results from the first pass of drilling are encouraging with many of the holes intersecting depth extensions

of the mineralisation identified at surface. There are numerous mineralised veins and structures covering a

wide area at Zeno, and intersection of the narrow-high grade vein style mineralisation at depth, notably in hole

ZEP-005 (9.77 g/t Au over a 3m interval ) is encouraging from a first -pass programme with only a single hole

drilled into most of the tested structures. It is noted that many of t he veins and structures can be mapped on

the ground at Zeno over strike lengths of hundreds of metres, and while the first pass programme has identified

good grades of gold in several of the structures, this first-pass drill programme was very preliminary in nature.

Exploration activity update

• A contract was signed with Geodrill For Leasing and Specialized Services Freezone LLC (the local

Egyptian subsidiary of Geodrill ) on January 30, 2024 to undertake the a second phase programme of

diamond drilling at Semna, consisting of an initial 5,000m. Geodrill completed the 2023 regional RC drilling

programme at Abu Marawat, and are a leading exploration drilling company with operations currently on

two continents and seven countries, and operate a fleet of 82 surface and underground drill rigs. Geodrill

will supply a crawler mounted UDR200 diamond drill rig and service unit to undertake the programme,

which is expected to start within the next 7 days.

• A second batch of lower grade samples from Semna has been submitted for metallic screen fire assay

analysis, to assess the relative abundance of coarse gold in the Semna mineralisation. The results of both

batches of samples will be released when they become available.

• Aton geologists have been undertaking an ongoing mapping and surface sampling programme covering

the northern Zeno, Bohlog, and Black Gaharish areas, focusing on areas recently exploited and exposed

by artisanal miners, and the Company expects to release the results of this exercise in the coming weeks.

Sampling and analytical procedures

Semna channel sampling

Exposed faces and access road cutting s selected for channel sampling initially had their exposed faces

cleaned by an excavator, prior to sampling. A single continuous sample channel was cut along each profile

using a large, generator powered angle grinder. Sample intervals were marked up on t he cleaned faces with

spray paint, with the start and end points of individual samples marked on the exposed faces. The channels

were created by sawing 2 parallel cuts, approximately 50mm apart, with the angle grinder. The cut channel

was subsequently samp led using a hammer and chisel, with the sampled material excavated from between

the 2 cuts. The profiles were sampled at nominal 2m intervals, but with individual sample lengths varying from

less than 1m to greater than 3m, as appropriate.

Samples were bagged up in cloth bags, and dried and crushed to -4mm at Aton’s onsite Rodruin sample

preparation laboratory, and split to a nominal c. 250-500g sample size.

The dried, crushed and split samples were shipped to ALS Minerals sample preparation facility at Marsa Alam,

Egypt where they were pulverised to a size fraction of better than 85% passing 75 microns . From this

pulverised material a further sub-sample was split off with a nominal c. 50g size, which was shipped on to ALS

Minerals at Rosia Montana, Romania for analysis.

Samples were analysed for gold by fire assay with an atomic absorption spectro metry finish (analytical code

Au-AA23 and for silver, copper, lead and zinc using an aqua regia digest followed by an AAS finish (analytical

code Ag-AA45). Any high grade overlimit gold samples (>10 ppm Au) were re-analysed using analytical code

Au-GRA21 (also fire assay, but with a gravimetric finish).

Zeno RC drilling

The RC holes were drilled at 5¾” or 5½” diameter, and the bulk percussion chip samples were collected directly

into pre-written large plastic bags from the cyclone every metre, numbered with the hole number and hole

depths, and laid out sequentially at the drill site. Between each metre of drill ing the cyclone and top box were

cleaned out with compressed air. The bags were logged on the drill sites by Aton geologists. The bulk 1m

samples were weighed, and subsequently riffle split through a 3-tier splitter onsite by Aton field staff to produce

an approximately 1/8 split, which was collected in cloth bags, numbered and tagged with the hole number and

depth. The splitter was cleaned with compressed air between each sample. The reject material from this initial

bulk split was re-bagged, labelled and tagged, and retained on the drill sites. A representative sample of each

metre was washed, stored in marked plastic chip trays, each containing 20m of samples, photographed, and

retained onsite as a permanent record of the drill hole.

The 1m split samples, weighing approximately 5kg each were then transported to the Rodruin sample

processing facility, where they were 1/2 riffle split into 2 separate sub-samples, weighing approximately 2.5kg.

One of these sub -samples was marked and label led, and retained at the laboratory for storage. The second

1m sub-samples were then combined into 4m composite samples, weighing approximately 10kg. These were

thoroughly mixed and again riffle split to produce a nominal c. 250-500g 4m composite sample which was

dispatched to ALS Minerals for analysis . Again the splitter was cleaned with compressed air between each

sample. The laboratory composites were allocated new sample numbers. The bulk reject material from the

riffle split 4m composite samples was disposed of.

QAQC samples were inserted into the 4m composite sample stream at a rate of approximately 1 certified

reference material (or “standard” sample) every 60 samples, 1 blank sample every 30 samples, and 1 field

duplicate split sample every 30 samples.

The 4m composite samples were shipped to ALS Minerals sample preparation laboratory at Marsa Alam,

Egypt, where they were pulverised to a size fraction of better than 85% passing 75 microns. From this

pulverised material a further sub-sample was split off with a nominal c. 50g size, which was shipped on to ALS

Minerals at Rosia Montana, Romania for analysis.

The 4m composite s amples were analysed for gold by fire assay with an atomic absorption spectroscopy

(“AAS”) finish (analytical code Au -AA23. Any high grade samples (Au >10 g/t) were re -analysed using

analytical code Au-GRA21 (also fire assay, with a gravimetric finish).

Upon receipt of the final assay results from the 4m composite samples from ALS, some of the 1m sub-samples

retained at Rodruin were selected by a senior Aton geologist for re-assaying, corresponding to 4m composite

assays, deemed to be of significance. These selected 1m split samples were again riffle split to produce a

nominal c. 250-500g 1m split sample which was dispatched to ALS Minerals for the same sample preparation

at Marsa Alam and analysis at Rosia Montana. The bulk reject material from the 1m sub-sample splits was re-

bagged and retained onsite for storage at Rodruin.

The 1m split samples were analysed for gold by fire assay with an atomic absorption spectroscopy (“AAS”)

finish (analytical code Au-AA23), and for silver, copper, lead and zinc using an aqua regia digest followed by

an AAS finish (analytical code Ag -AA45). Any high grade gold samples (Au >10 g/t) were re -analysed using

analytical code Au-GRA21 (also fire assay, with a gravimetric finish).

All intersections herein reported relate to 1m split samples.

About Aton Resources Inc.

Aton Resources Inc. (AAN: TSX-V) is focused on its 100% owned Abu Marawat Concession (“Abu Marawat”), located

in Egypt’s Arabian -Nubian Shield, approximately 200 km north of Centamin’s world -class Sukari gold mine. Aton has

identified numerous gold and base metal exploration targets at Abu Marawat, including the Hamama deposit in the west,

the Abu Marawat deposit in the northeast, and the Rodruin deposit in the south of the Concession. Two historic British

gold mines are also located on the Concession at Se mna and Sir Bakis. Aton has identified several distinct geological

trends within Abu Marawat, which display potential for the development of a variety of styles of precious and base metal

mineralisation. The Abu Marawat exploitation lease is 57.66 km2 in size , covering the Hamama West and Rodruin

mineral deposits, and was established In January 2024 and is valid for an initial period of 20 years. The Concession

also includes an additional 255.0 km2 of exploration areas at Abu Marawat, retained for a further period of 4 years from

January 2024. Abu Marawat is located in an area of excellent infrastructure; a four -lane highway, a 220kV power line,

and a water pipeline are in close proximity, as are the international airports at Hurghada and Luxor.

Qualified person

The technical information contained in this News Release was prepared by Javier Orduña BSc (hons), MSc, MCSM,

DIC, MAIG, SEG(M), Chief Geologist of Aton Resources Inc. Mr. Orduña is a qualified person (QP) under National

Instrument 43-101 Standards of Disclosure for Mineral Projects.

For further information regarding Aton Resources Inc., please visit us at www.atonresources.com or contact:

TONNO VAHK

Chief Executive Officer

Tel: +1 604 318 0390

Email: [email protected]

Note Regarding Forward-Looking Statements

Some of the statements contained in this release are forward -looking statements. Since forward -looking statements

address future events and conditions; by their very nature they involve inherent risks and uncertainties. Actual results

in each case could differ materially from those currently anticipated in such statements.

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in policies of the TSX

Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.