FOR IMMEDIAT E RELEASE Aton reports the first results from its Phase 3 RC drilling programme at the Semna project , including 14.33 g/t Au over an interval of 9 metres and 10.74 g/t Au over 6 metres

Drill Results Exploration Programs

FOR IMMEDIAT E RELEASE

Aton reports the first results from its Phase 3 RC drilling

programme at the Semna project , including 14.33 g/t Au over

an interval of 9 metres and 10.74 g/t Au over 6 metres

Vancouver, British Columbia, July 2, 2025: Aton Resources Inc. (AAN: TSX -V) (“Aton” or the “Company")

updates investors on the results of its phase 3 reverse circulation percussion (“RC”) drilling programme at the

Semna gold mine project, located within the retained exploration areas of the Company’s Abu Marawat

Concession (“Abu Marawat” or the “Concession”) in the Eastern Desert of Egypt.

Highlights:

• 44 RC drill holes (SMP-049 to SMP-092) have been drilled in the current programme to date at Semna,

for a total of 5,257m. Full assay results, including conventional fire assay and metallic screen fire assay

results, are now available for the first 25 holes of the programme (SMP-049 to SMP-073);

• Significant high grade mineralised intersections (based on screen fire assay analyses) , returned to

date, include the following:

• 14.33 g/t Au over a 9m interval , from 72m downhole depth , from hole SMP-050, including

intervals of 46.50 g/t Au over 1m and 26.11 g/t Au over 3m;

• 5.41 g/t Au over a 14m interval, from 39m downhole depth, including an interval of 22.57m g/t

Au over 3m (hole SMP-056);

• 10.74 g/t Au over a 6m interval, from 138m downhole depth (hole SMP-073);

• 8.66 g/t Au over a 7m interval, from 44m downhole depth, including an interval of 21.73m g/t Au

over 2m (hole SMP-052);

• 10.06 g/t Au over a 3m interval, from 125m downhole depth (hole SMP-071);

• 6.16 g/t Au over a 6m interval, from 38m downhole depth (hole SMP-053).

“This latest set of very positive drilling results continues on from the previous programmes, further confirming

the presence and persistence of the high grade veins at Semna, and we are really very happy with them” said

Tonno Vahk, CEO. “We are currently pushing ahead at full speed with the objective of being able to include

the Semna and Abu Marawat deposits in the PFS that we commenced last year , as Aton continues to work

steadily towards its objective of developing multiple mining operations on the Abu Marawat Concession . We

have also now completed the diamond drilling programme at Abu Marawat, and the rig will be mobilising to

Hamama in the coming days to start on a short geotechnical and metallurgical drilling programme. We have

temporarily suspended the RC drilling at Semna, with the rig also having been moved to Hamama to drill

groundwater wells, as part of the vitally important programme to develop a process water suppl y for the

projects. We plan to be back both RC and diamond drilling at Semna again within the next 2 months to continue

on from the success of these latest results, and we will also be kicking off a follow-up RC drilling programme

at Abu Marawat within the next 4 weeks.”

Semna gold mine project

The Semna prospect is located approximately 27km east-northeast of the Hamama West deposit and 13km

north-northeast of the Rodruin deposit, and is accessed via desert tracks from either Hamama, Rodruin or the

Abu Marawat deposit to the north (Figure 1). The Semna area has a long history of gold mining , dating back

thousands of years to the Old Kingdom, and it was more recently exploited between 1904 and 1906 by two

British companies, which worked the Main Vein on two underground levels. It is anecdotally suggested that

the Semna mine had the widest vein exploited during the early 20th Century phase of gold mining in Egypt,

reaching up to 6m width in places, with the British companies report ing mining grades of over 2 ounces per

ton. Reports from the British Mining Journal from 1905 indicated that some remnant pillars within the ancient

Pharaonic-era stopes assayed up to 5.5 ounces per ton of gold. More recently the area has been extensively

worked by illegal artisanal miners, who have now been removed from the site.

Figure 1: Geology plan of the Abu Marawat Concession, showing the location of the Semna prospect

During 2023 Aton completed a first phase of RC drilling at Semna, drilling 21 holes for a total of 3,662 metres.

This initial programme yielded excellent results with mineralised intersections including 50.07 g/t Au over a

6m interval (hole SMP -016), 28.36 g/t Au over a 4m interval (hole SMP -003), 10.61 g/t Au over a 9m

interval (hole SMP-019), and 5.73 g/t Au over a 14m interval (hole SMP-017). The RC drilling confirmed the

presence of significant coarse gold in the Semna mineralisation (see news release dated December 18, 2023).

Subsequent metallurgical testwork undertaken by Aton returned very positive results with gold recoveries in

excess of 97% from 2 representative bulk samples of the Semna mineralisation . Gold was also recovered to

2 gravity concentrates at rates of 56.4% and 62.2%, again indicating a significant component of coarse gold

in the Semna mineralisation . The testwork indicated that the Semna mineralisation is amenable to treatment

by both conventional CIL, and gravity concentration-leach processing options (see news release dated January

4, 2024).

In 2024 the Company completed a 27 hole follow up diamond drilling programme for a total of 4,701 metres

drilled (see news release dated July 4, 2024). This programme also returned significant high grade

intersections including 11.69 g/t Au over a 5.19m interval, from 126.35m downhole depth, and 21.53 g/t Au

over a 1.50m interval , from 147.20m (both from hole SMD -048), 15.05 g/t Au over a 2.55m interval , from

100.45m (hole SMD -025), 27.90 g/t Au over a 1.37m interval , from 68.94m (hole SMD -043), 8.10 g/t Au

over a 3.13m mineral, from 135.83m (hole SMD-027), and 16.77 g/t Au over a 1.55m interval, from 64.30m

(hole SMD-044).

The mineralisation at Semna is interpreted as being orogenic in style, and is associated with an array of

structures, presumed to have formed in dilational zones, accompanied by shearing and weak to moderate

phyllic wall rock alteration. The mineralised structures appear to be localised between and offset by a series

of regional north-northeast striking faults. These structures are frequently manifested as milky white quartz

veins, which apparently anastomose and pinch and swell, and are associated with loc ally strong phyllic wall

rock alteration . The quartz veins are variably sulphidic, and the highest grades of gold mineralisation are

typically associated with lenses and selvages of sulphide minerals, sub-parallel to the veins, as well as

occurring at the margins of the veins, and in the immediately adjacent altered wall rocks. The mineralisation at

Semna predominantly consists only of gold, which is often coarse and nuggety. The sheared veins locally

contain abundant chalcopyrite, and can carry significantly elevated grades of silver and copper.

Figure 2: Remnant rib pillar of the Main Vein in the underground workings, showing

lenses and ribbons of vein-parallel sulphidic material (*)

Semna phase 3 RC drilling programme

To date 44 RC drill holes (SMP -049 to SMP -092) have been drilled in the current programme, for a total of

5,257 metres (Figure 3). The current phase 3 Semna RC programme has been temporarily suspended, as the

RC rig has been moved to Hamama for other priority work on the Hamama Pre-Feasibility Study. Once this is

completed the rig will carry out a c. 5,000m programme of RC drilling at Abu Marawat, before returning to

Semna.

The phase 3 RC drilling has initially been undertaken on a reasonably tight spacing as the Company looks to

accelerate the estimation of a maiden resource at Semna, while considering the grade variability and the

irregular distribution of the nuggety coarse gold in the pinching and swelling veins, as well as continuing to test

the eastern and depth extensions of the identified mineralisation. Full collar details of all holes are provided in

Appendix A.

Samples were initially composited over 4m intervals, with the entire length of all the drill holes being submitted

for gold fire assay analysis. Selected 1m split samples collected directly during the drill ing were subsequently

submitted for additional gold fire assay analysis, as well as for silver and copper analysis, after the receipt of

the 4m composite assay results. After receipt of the 1m split assay results a further 165 selected 1m splits

from the drilling were also submitted for metallic screen fire assay analysis, comprising most of the samples

from within the mineralised intervals.

Figure 3: Geology and drill hole collar plan of the Semna prospect, SMP-049 to SMP-073

Discussion of results

Selected mineralised intersections from holes SMP -049 to SMP -073 are shown below in Table 1. Full

mineralised intersection details from SMP-049 to SMP-073 are provided in Appendices B, C, and D (based on

screen fire assay analyses, conventional fire assay analyses from the 1m split samples, and conventional fire

assay analyses from the 4m composite samples, respectively).

Hole ID

Intersection (m) Au 1

(g/t)

Ag

(g/t)

Cu

(ppm) Comments

From To Interval

SMP-050 72 81 9 14.33 2.2 29 Fire assay: 9m @ 13.39 g/t Au

incl. 75 76 1 46.50 6.7 62

and incl. 75 78 3 26.11 3.6 26

SMP-051 35 49 14 2.93 0.7 68 Fire assay: 14m @ 2.60 g/t Au

incl. 44 49 5 7.65 1.7 73

SMP-052 44 51 7 8.66 1.4 19 Fire assay: 7m @ 10.52 g/t Au

incl. 49 51 2 21.73 3.9 23

SMP-053 38 44 6 6.16 0.8 39 Fire assay: 6m @ 7.79 g/t Au

SMP-056 39 53 14 5.41 1.1 39 Fire assay: 14m @ 6.97 g/t Au

incl. 50 53 3 22.57 4.3 36

SMP-058 1 10 9 1.85 0.3 338 Fire assay: 9m @ 1.92 g/t Au

incl. 5 6 1 11.65 0.6 242

SMP-066 30 40 10 1.99 2.9 158 Fire assay: 10m @ 2.11 g/t Au

SMP-069 77 81 4 3.98 3.3 2,097 Fire assay: 4m @ 5.33 g/t Au

SMP-071 125 128 3 10.06 0.8 22 Fire assay: 3m @ 5.14 g/t Au

incl. 125 126 1 29.10 2.1 34

SMP-073 138 144 6 10.74 1.9 16 Fire assay: 6m @ 12.29 g/t Au

incl. 138 139 1 35.20 6.7 55

Notes:

1) Screen fire gold assays (ALS analytical code Au-SCR-24), where available, are used in the calculation of intersections

Table 1: Selected final intersections from the Semna phase 3 RC drilling, SMP-049 to SMP-073

Figure 4: RC percussion chips from hole SMP-050, 60-100m depth, showing the mineralised

interval between 72-81m, associated with a massive white quartz vein

The latest phase of RC drilling continues to indicate that the gold mineralisation is usually associated with the

milky white quartz veins, with gold appearing to be distributed both within the quartz veins themselves, but

usually at lower grades, and typically also at higher grades in the sulphid e-bearing margins and wall rock

adjacent to the veins, as was mapped in the underground workings (Figures 2, 4 above and 5 below). Note

that in hole SMP-050 (Figure 4) the highest grades returned come from the immediate margins of the quartz

vein: 45.6 g/t Au between 75 -76m and 61.8 g/t Au between 79 -80m. The same is noted in hole SMP -073

(Figure 5), with the highest grades also returned from margins of the quartz vein: 35.2 g/t Au between 138 -

139m and 13.5 g/t Au between 142-143m.

Figure 5: RC percussion chips from hole SMP-073, 134-146m depth, showing the mineralised

interval between 138-144m, also associated with a massive white quartz vein

The quartz veins themselves can be either virtually barren or weakly mineralised ( eg. SMP-050: 0.30 g/t Au

between 76-78m, see Figure 4), or well mineralised (eg. SMP-073: 6.85 g/t Au between 140-142m, see Figure

5). However there does appear to be a fairly clear correlation between the gold grades and the quantity of

sulphide present in the veins themselves, and on their margins.

Figure 6: Cross-section O3 through the eastern extension of the Semna deposit

(refer to Figure 2 for location)

The latest phase of drilling continues to indicate the presence of a sub-vertical zone of multiple quartz veins in

the area tested, which appear to be largely sub-parallel, over a true width of approximately 20m (Figure 6).

There is also increasing evidence from the drilling of the presence of a series of well mineralised “flat” easterly-

dipping structures, as mapped at surface in channel sample profile SMC -065, which returned a mineralised

interval at surface of 2.60 g/t Au over 39.3 metres (see news relea se dated February 1, 2024). Surface

mapping and evidence from drill holes suggest that the “flat-dipping” veins to be quite narrow, in contrast to

the steep milky quartz veins, which reach several metres in width. The “flat -dipping” veins rarely exceed 10-

20cm in width individually , but numerous stacked tension gash style veins occur in these structural zo nes.

Anecdotally these “flat-dipping” vein arrays appear to be associated with elevated copper grades.

Sampling methodology and analysis

Please also refer to the “ Sampling and analytical procedures ” section below for fuller details of these

procedures.

The drilling was undertaken by Capital Limited, using an Explorac 100 RC drilling rig with an onboard cone

splitter. The onboard splitter was set to produce 2 sub-samples of the chips (“L” and “R” samples, collected in

cloth bags) each representing c. 12.5% of the entire sample over a metre interval. The remaining c. 75% of

the sample was collected in bulk plastic bags at the rig. Sampling of each and every hole was undertaken in

their entirety at 1 metre intervals.

Hole SMP-050

Depth (m) 4m composites 1m splits Screen fire assays

From To Au (g/t) 1 Au (g/t) 2 Ag (g/t) Cu (ppm) Au (g/t) 3

68 69

0.03

0.01 <0.2 20 -

69 70 0.01 <0.2 25 -

70 71 0.05 <0.2 53 -

71 72 0.06 <0.2 40 -

72 73

11.95

0.55 0.3 46 0.55

73 74 1.36 1.0 26 2.10

74 75 1.46 0.7 43 1.81

75 76 44.30 6.7 62 45.60

76 77

14.75

0.22 <0.2 4 0.25

77 78 0.49 <0.2 4 0.35

78 79 4.83 0.7 10 7.51

79 80 54.80 8.0 44 61.80

80 81

2.54

12.55 2.0 23 9.02

81 82 0.21 0.2 28 0.24

82 83 0.17 <0.2 43 -

83 84 0.04 <0.2 11 -

84 85

0.09

0.02 <0.2 5 -

85 86 0.05 <0.2 8 -

86 87 0.02 <0.2 45 -

87 88 0.02 <0.2 13 -

Notes:

1) Gold analysis by ALS code Au-AA23 (conventional fire assay, 30g charge, with an AA finish)

2) Gold analysis by ALS code Au-AA23 (conventional fire assay, 30g charge, with an AA finish)

3) Gold analysis by ALS code Au-SCR24 (metallic screen fire assay, 1kg sample)

Table 2: Compiled assay results, SMP-050, 68-88m

Aton field crews then took sub -samples of the “L” samples, and com bined them into 4m composite samples,

thoroughly mixing and homogenising the samples. These 4m samples were then split down to c. 500 -1,000g

samples which were dispatched from site for gold fire assay analysis.

Upon receipt of the 4m composite assay results, selected 1m mineralised intervals were then selected with a

further c. 500-1,000g sub-sample being split off from the retained material from the “L” bags and sent to the

laboratory for gold, silver and copper analysis.

After the results of the 1m split samples were received, a further 165 samples were selected from the

mineralised intervals, with another 1kg sub-sample being split off, this time from the “R” bags, and these were

sent for metallic screen fire assay analysis.

An example of all the assays received from the 3 different sampling techniques/assaying methods is presented

in Table 2 above, showing the mineralised intersection from hole SMP-050 between 72-81m. Furthermore, a

comparison was made between all the mineralised intervals from holes SMP -049 and SMP -073, using both

the 4m composite sample assays and the 1m split sample assays, as a direct comparison cannot be made

between individual 1m and 4m composite samples, and this is plotted as a scatter graph in Figure 7 below.

Figure 7: Comparison between mineralised intervals from the 4m composite samples

and the 1m split samples, holes SMP-049 to SMP-073