Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

AAN.V ·

Aton announces the start of the Phase II diamond drilling programme at Rodruin

Exploration Programs

FOR IMMEDIATE RELEASE

Aton announces the start of the Phase II diamond

drilling programme at Rodruin

Vancouver, November 23, 2021: Aton Resources Inc. (AAN: TSX-V) (“Aton” or the “Company") is pleased to

update investors on the start of diamond drilling at its Rodruin gold exploration project (Figure 1), located in

the Company’s 100% owned Abu Marawat Concession (“Abu Marawat” or the “Concession”) , in the Eastern

Desert of Egypt.

“We are delighted to announce the start of the second phase diamond drilling programme at Rodruin” , said

Tonno Vahk, Interim CEO. “It has been a long and rocky road to this new programme, but we are very happy

to now be finally back drilling, as we aim to unlock the potential of the Rodruin gold project, as well as continuing

to advance the Hamama West project and the remainder of our highly prospective Abu Marawat Concession.”

Rodruin diamond drilling programme

In June 2021 the Company contracted Energold Drilling (EMEA) Limited (“Energold”) to undertake an initially

planned 3,350m diamond drilling programme at Rodruin (see news release dated June 14, 2021). Energold

who are regarded as one of the world’s premier mineral exploration drilling companies, and have one of the

world’s largest drilling fleets, consisting of some 160 rigs, are known specialists in drilling in difficult terrain

such as that at Rodruin. Energold have supplied a Global Drilling ID500-G track-mounted rig (Figure 2), which

is specially engineered to be able to drill horizontal and very shallow holes, as well as more conventional

inclined and vertical holes, has a small footprint and is ideal for the rugged conditions at the Rodruin project.

Figure 2: Energold’s ID500-G rig drilling on the first hole of the new programme, ROD-051

The containerised drill rig arrived onsite at Rodruin on November 11, 2021 and was reassembled by Energold’s

drilling crew, prior to tracking up the 4.5km access road to the Rodruin drill sites. The last shipment of ancillary

equipment arrived onsite on November 17, 2021, and drilling commenced on November 22, 2021.

Drilling will be supervised by Aton’s experienced exploration team, who discovered the Rodruin deposit in

2017, with drill samples being sent to ALS Minerals sample processing facility in Marsa Alam, Egypt , prior to

being exported to ALS laboratories in Europe for geochemical analysis. The first assay results from this drill

programme can be expected in January 2022.

The programme has been designed to resolve some of the structural complexities of the Rodruin

mineralisation, as well as rapidly advancing the project with Aton’s objective being to produce a maiden

resource at the Rodruin project in the shortest time frame possible. Widespread gold mineralisation has been,

and continues to be identified at surface at Rodruin (see news release dated November 3, 2021). The phase

one reverse circulation percussion (“RC”) drilling programme intersected wide zones of oxide mineralisation

from surface, as well as in deeper sulphide zone mineralisation. The new dr illing will also follow up on

mineralisation intersected in the RC drilling, which returned intersections including 36m @ 12.47 g/t Au (see

news release dated October 1, 2018). Drilling will be undertaken at the Aladdin’s Hill, Central Buttress, Spiral

Pit and GF zones (see news release dated January 29, 2019) , as well as targeting currently undrilled

mineralisation on the North Ridge which has returned assays of up to 321 g/t Au from surface samples (see

news release dated February 6, 2018).

About Aton Resources Inc.

Aton Resources Inc. (AAN: TSX-V) is focused on its 100%

owned Abu Marawat Concession (“Abu Marawat”),

located in Egypt’s Arabian -Nubian Shield, approximately

200 km north of Centamin’s world-class Sukari gold mine.

Aton has identified numerous gold and base metal

exploration targets at Abu Marawat, including the

Hamama deposit in the west, the Abu Marawat deposit in

the nort heast, and the advanced Rodruin exploration

prospect in the south of the Concession. Two historic

British gold mines are also located on the Concession at

Sir Bakis and Semna. Aton has identified several distinct

geological trends within Abu Marawat, which display

potential for the development of a variety of styles of

precious and base metal mineralisation. Abu Marawat is

447.7 km2 in size and is located in an area of excellent

infrastructure; a four -lane highway, a 220kV power line,

and a water pipeline are in close proximity, as are the

international airports at Hurghada and Luxor.

Qualified person

The technical information contained in this News Release

was prepared by Javier Orduña BSc (hons), MSc, MCSM,

DIC, MAIG, SEG(M), Exploration Manager of Aton

Resources Inc. Mr. Orduña is a qualified person (QP) under

National Instrument 43-101 Standards of Disclosure for

Mineral Projects.

For further information regarding Aton Resources Inc.,

please visit us at www.atonresources.com or contact:

TONNO VAHK

Interim CEO

Tel: +1 604 318 0390

Email: [email protected]

Note Regarding Forward-Looking Statements

Some of the statements contained in this release are forward-looking statements. Since forward-looking statements

address future events and conditions; by their very nature they involve inherent risks and uncertainties. Actual results

in each case could differ materially from those currently anticipated in such statements.

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in policies of the TSX

Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.