Aton Announces the Final Results of Surface Trenching at the Sir Bakis Prospect, and Confirms the Presence of a Broad Zone of Anomalous Surface GOLD Mineralization

Drill Results Exploration Programs Sampling & Geoscience Results

FOR IMMEDIATE RELEASE:

ATON ANNOUNCES THE FINAL RESULTS OF SURFACE TRENCHING AT THE SIR BAKIS PROSPECT, AND

CONFIRMS THE PRESENCE OF A BROAD ZONE OF ANOMALOUS SURFACE GOLD MINERALIZATION

Vancouver, March 19, 2018 : Aton Resources Inc. (AAN: TSX -V) (“Aton” or the “Company") is pleased to

provide investors with an update on exploration activities at the Co mpany’s 100% owned Abu Marawat

Concession (“Abu Marawat” or the “Concession”), and to announce final gold assay results from the surface

trenching programme at the Sir Bakis prospect, and initial grab sampling assay results from Sidi Samarin.

Highlights:

• A total of 12 machine excavated trenches have been completed at the Sir Bakis prospect (SBT-001 to

SBT-012);

• Trenching has confirmed the presence of a broad zone of anomalous gold mineralization at surface,

associated with a sheeted vein swarm, returning intersections including 45.85m @ 0.36 g/t Au

(trench SBT-005), and suggestive of RIRG style mineralization ;

• A short programme of selective grab sampling from the Sidi Samarin area, approximately 2.5km

north-west of Sir Bakis, has returned gold assay values including 9.78 g/t Au and 4.86 g/t Au .

“These results from one of the historic mining areas within our license show real promise . The British last

mined at Sir Bakis early in the last century, but there has been mining activity there since Pharaonic times. ”

said Mark Campbell, President and CEO. ”The results also help us confirm our understanding of the geology

in this part of the Concession, as we have various styles of mineralization throughout our license .”

Sir Bakis Prospect

The Sir Bakis prospect is located approximately 12km NE of the Company’s Hamama West mineral deposit,

and approximately 10km NW of the new Rodruin discovery (see Figure 1), and has been extensively worked

in both ancient and modern times. There are signifi cant ancient mine workings and the remains of ancient

settlements spread over a wide area at Sir Bakis, and archaeological evidence suggest s that mining dates

back to the New Kingdom period, over 3,000 years ago.

The Main Vein at Sir Bakis, which was the focus of the modern underground mining between 1904 and 1906

by a British company, Eridia (Egypt) Exploration Company, can be traced at surface for a distance of some

1.6km in a N -S strike direction. The Main Vein is a high grade sheared quartz vein and w as mined at widths

of up to 1.5m underground. Approximately 600m NW of the British adits there is a zone of very narrow

sheeted quartz veins which have been worked extensively at surface to shallow depths in ancient times. The

sheeted vein s warm is approxi mately 400m along its N -S strike length at surface, and in excess of 100m in

width. Results from the initial phase of trenching over the sheeted vein swarm included an intersection of

109.1m @ 0.21 g/t Au (trench SBT-001, see news release dated September 1 3, 2017).

There are also a number of other major veins in the area, to the NW of the modern mine workings, and

numerous smaller veins and shears through the area which have been worked by the ancients. P revious

channel sampling at Sir Bakis by the Company has returned assays of up to 29.5 g/t Au from the Main Vein ,

and 7.94 g/t Au from the westernmost vein . A selective grab sample of vein quartz from the northern

extension of the Main Vein workings returned an assay of 3 2.9 g/t Au (see news release dated September

13, 2017).

Figure 1: Abu Marawat regional geology, showing the location of the Sir Bakis prospect

Figure 2: Location of the Sidi Samarin and Sir Bakis prospects

Figure 3: Sir Bakis trench and sample locations, showing gold assay results

Surface trench sampling

The surface trenching programme was completed during 2017 at Sir Bakis for a total of 12 trenches (SBT-001

to SBT-012 inclusive) with a total excavated length of 1,762.5m. Assay results from the first 3 trenches, SBT -

001 to SBT -003 have previously been reported (see news release dated September 13, 2017) . The locations

of the trenches are shown in Figure 3 above. The trenches were manually channel sampled, over nominal 2m

intervals, with a tot al of 918 samples being collected over the entire programme. All samples were crushed

to -4mm at the Company’s onsite sample preparation facility at Hamama, with c. 500g splits shipped to ALS

Minerals at Rosia Montana, Romania for analysis . All s amples were analyzed for gold by fire assay using

analytical code AA-Au23.

Trenches SBT-001 to SBT -002, SBT-004 to SBT -006, and SBT-009 targeted the sheeted vein swarm, with the

remainder targeting various other veins and structures. Results from the trenches continue to be very

encouraging with strongly a nomalous results being returned from all trenches , except trench SBT -011.

Mineralized intersections from all trenches SBT -004 to SBT -012 are provided in Appendix A, and selected

intervals are presented below in Table 1.

Trenches SBT -004, SBT -005, and SBT -006 all intersected broad zones of anomalous surface mineralization

over the main sheeted vein swarm , confirming the highly anomalous interval of 109.1m @ 0.21 g/t Au

previously reported from trench SBT -001, with intersections including 45.85m @ 0.36 g/t Au and 9.35 @

0.69 g/t Au (trench SBT-005). There are many shallow, narrow ancient workings over the sheeted vein swarm

(see Figure 3), typically less than a meter in width to a maximum of 3-4m depth, with the highest grade quartz

veins having been removed by the ancient miners. It is therefore considered highly probable that the trench

assays have underestimated the true grade of the mineralized interval at surface, prior to the ancient shallow

mining activity, due to the selective removal of high grade quartz veins .

Trench ID From (m) To (m) Interval (m) Au (g/t) Comments

SBT-004 17.60 33.50 15.90 0.15 Main sheeted vein swarm

SBT-004 65.45 108.25 42.80 0.11 Main sheeted vein swarm

SBT-005 6.70 52.55 45.85 0.36 Main sheeted vein swarm

SBT-005 62.20 71.55 9.35 0.69 Main sheeted vein swarm

SBT-006 12.10 21.90 9.80 0.26 Main sheeted vein swarm

SBT-006 58.50 69.75 11.25 0.17 Main sheeted vein swarm

SBT-007 26.10 64.40 38.30 0.18 Eastern zone

SBT-010 27.60 59.30 31.70 0.14 N extension of sheeted veins?

Table 1: Selected mineralized intersections from Sir Bakis trenches SBT -004 to SBT-012

The main sheeted vein swarm appears to be offset by a fault which is approximately parallel to trench SBT -

002, and the anomalous mineralization intersected in trenches SBT -007 and SBT-008 suggests the possibility

of a separate eastern vein swarm zone possibly extending to the south under wadi sediments.

The Company continues to be very encouraged by the trench results and believes that the sheeted vein style

mineralization identified at Sir Bakis displays strong affinities with reduced intrusion related go ld (RIRG)

systems, possibly associated with blind stocks or apophyses of granite associated with the late Ria al Jarrah

granite (see Figure 2). Small, irregular outcrops of distinctive pink granite stocks have been mapped at Sir

Bakis area in the immediate area of the identified mineralization .

Sidi Samarin Prospect

A short first- pass programme of selective grab sampling has been completed at the Sidi Samarin prospect ,

located approximately 2.5km NW of the Sir Bakis prospect (See Figure 4). The Sidi Samarin area is located

within a wedge of predominantly orogenic ‘grey granite s’, with minor meta volcanics located between the

late Ria al Jarrah and Garida granite plutons (see Figures 1 and 2). Mineralization in the area is primarily

associated with narrow, sheared and iron-stained quartz veins, hosted mainly in granodiorites, and appears

to be similar to that at the Massaghat prospect (see Figure 2), which has returned gold assay values of up to

470 g/t Au (see news releases dated August 15, 2012 and 4 December, 2017). There are a number of small,

isolated ancient workings in the Sidi Samarin area, exploiting such quartz veins.

Sample ID East North Au

(g/t) Sample Description

AHA-17649 543652 2919800 0.03 Gossanous silica-carbonate in andesite country rock

AHA-17677 543624 2919801 0.03 Gossanous silica-carbonate in andesite country rock

AHA-17678 543607 2919824 0.03 Fine-grained reddish gossan

AHA-17679 542969 2919789 2.80 Fe-stained quartz vein in sheared andesite dyke, granodiorite host

AHA-17681 542961 2919815 9.78 Fe-stained quartz vein, ancient dump material

AHA-17682 542798 2919729 0.38 Gossanous vuggy quartz vein, ancient dump material, in granodiorite

AHA-17683 542826 2919661 3.32 Altered, sheared quartz vein, from ancient shaft, granodiorite host

AHA-17684 542687 2919680 1.23 Fe-stained, sheared quartz vein, ancient dump material

AHA-17685 542657 2919751 0.52 Gossanous quartz vein, traces Cu staining

AHA-17686 544142 2919477 4.86 Fe-stained quartz vein, ancient dump material, granodiorite host

AHA-17687 543553 2919059 0.05 Gossanous vuggy quartz vein, in granodiorite

AHA-17688 543518 2919388 0.60 Fe-stained quartz vein, in granodiorite

AHA-17689 542721 2919475 0.01 Fe-stained quartz vein

Table 2: Details of Sidi Samarin grab samples

A short programme of selective grab sampling has been completed at Sidi Samarin, with encouraging results.

All samples were crushed to -4mm at the Company’s onsite sample preparation facility at Hamama, with c.

500g splits shipped to ALS Minerals at Rosia Montana, Romania for analysis. All s amples were analyzed for

gold by fire assay using analytical code AA -Au23. Details of the samples are provided above in Table 2, and

sample locations are shown in Figure 4. Of the 13 samples, 5 retur ned assays greater than 1 g/t Au, and

results included assays of up to 9.78 g/t and 4.86 g/t Au .

Figure 4: Sidi Samarin sample locations, showing gold assay results

Activity update:

• The Company remains on course to submit its financial and technical study on the Hamama West

deposit to the Egyptian Mineral Resources Authority by May 2018, in support of its intention to

declare a commercial discovery at Hamama (see news release, dated November 20, 2017) ;

• Geotechnical trial pitting at 2 potential locations for the Hamama West heap leach facility has been

completed, and it is anticipated that samples will be submitted to an ISO certified laboratory in Cairo

within the next week for geotechnical testwork;

• The final report on t he deep ground penetrating radar geophysical survey has now been completed

by Terravision Exploration , with the survey having identified a number of promising new targets .

Further details of the GPR survey will be released soon ;

• Additional surface sampling has been completed at the Rodruin prospect to follow up on the highly

promising initial surface sampling results (see news release s dated February 6, 2018 and March 5,

2018). Samples have been dispatched to ALS Romania for analysis, and further updates will be

provided shortly;

• Construction of the Rodruin access road has commenced, and the road is progressing well. Drilling is

planned to start at Rodruin, as soon as the access road has been completed and drill pads have been

constructed.

About Aton Resources Inc.

Aton Resources Inc. (AAN: TSX -V) is focused on its 100% owned Abu Marawat Concession (“Abu Marawat”),

located in Egypt’s Arabian-Nubian Shield, approximately 200 km north of Centamin’s Sukari gold mine. Aton

has identified a 40 km long gold mineralized trend at Abu Marawat, anchored by the Hamama deposit in the

west and the Abu Marawat deposit in the east, containing numerous gold exploration targets, including three

historic British mines. Aton has identified several distinct geological trends within Abu Marawat, which

display potential for the development of RIRG and orogenic gold mineralization, VMS precious and base

metal mineralization, and epithermal -IOCG precious and base metal mineralization. Abu Marawat is ove r

738km2 in size and is located in an area of excellent infrastructure; a four-lane highway, a 220kV power line,

and a water pipeline are in close proximity.

Qualified Person

The technical information contained in this News Release was prepared by Roderick Cavaney BSc, MSc (hons),

MSc (Mining & Exploration Geology), FAusIMM, GSA, SME, Vice President, Exploration, of Aton Resources

Inc. Mr. Cavaney is a qualified person (QP) under National Instrument 43 -101 Standards of Disclosure for

Mineral Projects.

For further information regarding Aton Resources Inc., please visit us at www.atonresources.com or contact:

Mark Campbell

President and Chief Executive Officer

Tel: +202-27356548

Email: [email protected]

Note Regarding Forward-Looking Statements

Some of the statements contained in this release are forward -looking statements. Since forward -looking

statements address future events and conditions; by their very nature they involve inherent risks and

uncertainties. Actual results in each case could differ materially from those currently anticipated in such

statements.

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in policies of the

TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

Appendix A – Sir Bakis trench intersection results

Trench ID Length From (m) To (m) Interval (m) Au (g/t) Comments

SBT-004 124.15

17.60 33.50 15.90 0.15 Main sheeted vein swarm

48.05 53.50 5.45 0.15 Main sheeted vein swarm

65.45 108.25 42.80 0.11 Main sheeted vein swarm

SBT-005 117.40

6.70 52.55 45.85 0.36 Main sheeted vein swarm

62.20 71.55 9.35 0.69 Main sheeted vein swarm

77.80 79.80 2.00 0.45 Main sheeted vein swarm

SBT-006 128.90

12.10 21.90 9.80 0.26 Main sheeted vein swarm

48.40 50.40 2.00 2.72 Main sheeted vein swarm

58.50 69.75 11.25 0.17 Main sheeted vein swarm

81.15 82.95 1.80 0.27 Main sheeted vein swarm

100.70 108.20 7.50 0.09 Main sheeted vein swarm

119.05 125.65 6.60 0.11 Main sheeted vein swarm

SBT-007 94.35

8.45 17.05 8.60 0.61 Eastern zone

26.10 64.40 38.30 0.18 Eastern zone

SBT-008 68.15 6.40 8.50 2.10 3.90 Eastern zone

SBT-009 111.60 49.10 51.20 2.10 0.52

96.65 104.60 7.95 0.15

SBT-010 66.30 0.00 4.65 4.65 0.09

27.60 59.30 31.70 0.14

SBT-011 208.70 NSA > 0.07 g/t Au

SBT-012 124.00

8.40 18.70 10.30 0.19

52.75 55.15 2.40 0.25