Aton announces further results from the resource infill RC drilling programme at Hamama West
FOR IMMEDIATE RELEASE
Aton announces further results from the resource infill
RC drilling programme at Hamama West
Vancouver, British Columbia September 27, 202 2: Aton Resources Inc. (AAN: TSX -V) (“Aton” or the
“Company") is pleased to update investors on the latest assay results from its Hamama West gold- silver
project, located in the Company’s 100% owned Abu Marawat Concession (“Abu Marawat” or the
“Concession”), in the Eastern Desert of Egypt.
Highlights:
• Assay results have now been received for a further 27 RC drill holes, HAP-136 to HAP-162;
• Significant intersections include the following:
• 3.71 g/t Au, 258.4 g/t Ag and 6.75 g/t AuEq over a 12m interval, from surface (drill hole HAP-137);
• 0.92 g/t Au, 26.50 g/t Ag and 1.23 g/t AuEq over a 66m interval, from 2m depth (hole HAP-148);
• 0.85 g/t Au, 26.71 g/t Ag and 1.17g/t AuEq over a 66m interval, from 14m depth (hole HAP-155);
• 0.81 g/t Au, 22.14 g/t Ag and 1.07 g/t AuEq over a 68m interval, from 23m depth (hole HAP-156).
“These latest results from Hamama West continue to meet with our expectations, and are more than
respectable” said Tonno Vahk, Interim CEO. “The RC drilling is again demonstrating the presence of the wide
and continuous body of gold-silver mineralisation at Hamama West. Aton is continuing to push ahead with the
strategy agreed with our partners at the Egyptian Mineral Resources Authority, which will lead to the initial
development of the starter open pit heap leach operation at Hamama West, followed by the Rodruin mine. ”
Hamama West RC drilling programme
The Hamama West project has an indicated resource of 137,000 ounces of gold equivalent (“AuEq”, gold and
silver combined), and an inferred resource of 341,000 ounces AuEq. The uppermost oxide and transitional
component of the Hamama West deposit (the “gold oxide cap”) comprises an inferred resource of 106,000
ounces AuEq (see news release dated January 24, 2017). Metallurgical testwork has indicated average gold
recoveries of 75.6% and 72.7% from oxide and transitional mineralisation types respectively (see news release
dated February 22, 2018), using standard heap leach processing technology. Aton plans to initially mine the
outcropping oxide gold cap of the deposit, which is mineralised directly from surface, as a low capex/opex
starter open pit mining operation, with a heap leach processing facility. The Hamama West oxides will provide
early cash flow, and will represent the first stage of phased mine development at the Abu Marawat Concession.
The reverse circulation percussion (“RC”) resource infill drilling programme at the Hamama West gold-silver
project (Figure 1) was completed on August 24, 2022. The programme was designed by Aton, in conjunction
with our mineral resource consultants, Cube Consulting (Perth, Western Australia), to primarily test the oxide
and transitional portion of the Hamama West mineral resource estimate (“MRE”), with the specific objective of
upgrading the confidence of the existing inferred resource.
A total of 6,620m was drilled for the programme, predominantly at the Hamama West zone. 3 holes were
completed, for 297m, at the Western Carbonate zone, and 5 holes, for 390m, at the West Garida prospect
approximately 3km east of Hamama West (see news release dated September 1, 2022), with the remaining
5,933m drilled at Hamama West.
Figure 1: Geology plan of the Abu Marawat Concession, showing the location of the Hamama West project
Drill holes were laid out using handheld GPS, with all collars surveyed on the completion of the programme by
total station. Drill holes were down hole surveyed at appropriate intervals using a Champ GyroTM north-seeking
gyroscopic survey tool. The location of the drill holes is shown in Figure 2, and collar details of holes HAP-136
to HAP-162 are provided in Appendix A.
Results
Selected significant intersections from the holes HAP -136 to HAP -162 are shown below in Table 1, and full
results from all holes are provided in Appendix B. All drill holes intersected mineralisation, as expected.
The southernmost holes typically intersected narrower oxide zones closer to the structural footwall of the north-
dipping Hamama West mineralisation, which typically carry the higher grades, for example hole HAP -137
which intersected 12m grading 3.71 g/t Au, 258.4 g/t Ag and 6.75 g/t AuEq (at a Au:Ag ratio of 85:1), from
surface. Other holes which returned near -surface oxide zone intersections included HAP-138 (25m grading
1.24 g/t Au, 54.1 g/t Ag and 1.84 g/t AuEq from 1m down hole depth), HAP-142 (34m grading 0.76 g/t Au,
28.12 g/t Ag and 1. 09 g/t AuEq from 1m depth) , and HAP-151 (35m grading 0.90 g/t Au, 14.14 g/t Ag and
1.07 g/t AuEq from surface). Several of the holes ended in oxide mineralisation indicating the mineralised zone
to be wider than expected, for example holes HAP-141, HAP-142, HAP-150 and HAP-151.
Figure 2: Hamama West RC drilling programme – drill hole collar plan (red: 2022 RC holes reporting;
white: pre-2022 diamond drill holes)
Hole ID
Intersection (m) 1 Au
(g/t)
Ag
(g/t)
AuEq 2
(g/t) Comments
From To Interval
HAP-137 0 12 12 3.71 258.4 6.75 Oxide mineralisation
HAP-138 1 26 25 1.24 51.41 1.84 Oxide mineralisation
HAP-141 11 40 29 0.50 34.24 0.91 EOH in mineralisation (oxide)
HAP-142 1 35 34 0.76 28.12 1.09 EOH in mineralisation (oxide)
HAP-143 0 60 60 0.61 22.37 0.88 Oxide/sulphide mineralisation
HAP-146 6 97 91 0.53 15.58 0.72 Oxide/sulphide mineralisation
HAP-147 34 89 55 0.79 22.07 1.05 Oxide/sulphide mineralisation
HAP-148 2 68 66 0.92 26.50 1.23 Oxide/sulphide mineralisation
HAP-150 0 25 25 0.91 11.62 1.04 EOH in mineralisation (oxide)
HAP-151 0 35 35 0.90 14.14 1.07 EOH in mineralisation (oxide)
HAP-153 1 53 52 0.85 17.23 1.05 Oxide/sulphide mineralisation
HAP-155 14 80 66 0.85 26.71 1.17 EOH in mineralisation (sulphide)
HAP-156 23 91 68 0.81 22.14 1.07 Oxide/sulphide mineralisation
HAP-157 16 85 69 0.58 13.99 0.74 Oxide/sulphide mineralisation
Notes:
1) Intersections calculated at a nominal cutoff grade of 0.5 g/t AuEq in runs of continuous mineralisation
2) Gold equivalent, AuEq, is calculated at a ratio of 85:1 Au:Ag (ie. 1 g/t Au = 85 g/t Ag)
Table 1: Selected mineralised intersections from RC percussion holes HAP-136 to HAP-162
The deeper holes drilled from more northerly collar positions targeted the structural footwall at greater depth,
and intersected a combination of both oxide/transitional and sulphide mineralisation types. Some of these
holes intersected wide zones of mineralisation comprising both oxide/transitional and sulphide types.
Intersections included 66m grading 0.92 g/t Au, 26.50 g/t Ag and 1.23 g/t AuEq from 2m down hole depth
(hole HAP-148), 66m grading 0. 85 g/t Au, 26.71 g/t Ag and 1.17 g/t AuEq from 14m depth (hole HAP -155),
and 91m grading 0.53 g/t Au, 15.58 g/t Ag and 0.72 g/t AuEq from 6m depth (hole HAP-148).
These latest holes continue to show good continuity of the mineralisation at Hamama West.
Sampling and analytical procedures
The RC holes were drilled at 140mm diameter, and the bulk percussion chip samples were collected directly
into pre-written large plastic bags from the cyclone every metre, numbered with the hole number and hole
depths, and laid out sequentially at the drill site. Between each metre of drilling the cyclone and top box w ere
cleaned out with compressed air. The bags were then moved to a logging and storage area where the chips
were logged by Aton geologist s. The bulk 1m samples were weighed, and subsequently riffle split through a
3-tier splitter onsite by Aton field staff to produce an approximately 1/8 split, which was collected in cloth bags,
numbered and tagged with the hole number and depth. The splitter was cleaned with compressed air between
each sample. The r eject material from this initial bulk split was re -bagged, labelled and tagged, and the bulk
reject samples will be stored and retained on site at Hamama. A representative sample of each metre was
washed, stored in marked plastic chip trays, each containing 20m of samples, photographed, and retained
onsite as a permanent record of the drill hole.
All the 1m split samples were weighed again, and the samples were riffle split onsite at the Hamama sample
preparation facility, typically a further 3- 4 times using a smaller lab splitter, to produce a nominal c. 250-500g
sample split for dispatch to the assay laboratory. Again the splitter was cleaned with compressed air between
each sample. The laboratory splits were allocated new sample numbers.
QAQC samples are inserted into the sample stream at a rate of approximately 1 certified reference material
(or “standard” sample) every 30 samples, 1 blank sample every 15 samples, and 1 field duplicate split sample
every 15 samples.
The c. 250-500g split samples were s hipped to ALS Minerals sample preparation laboratory at Marsa Alam,
Egypt, where they were pulverised to a size fraction of better than 85% passing 75 microns. From this
pulverised material a further sub-sample was split off with a nominal c. 50g size, which was shipped on to ALS
Minerals at Rosia Montana, Romania for analysis.
Samples were analysed for gold by fire assay with an atomic absorption spectroscopy (“AAS”) finish (analytical
code Au-AA23), and for silver using an aqua regia digest followed by an AAS finish (analytical code Ag-AA45).
Any high grade gold samples (Au >10 g/t) were re-analysed using analytical code Au-GRA21 (also fire assay,
with a gravimetric finish). High grade Ag samples (Ag >100 g/t) were re-analysed using the ore grade technique
Ag-AA46 (also an aqua regia digest followed by an AAS finish).
About Aton Resources Inc.
Aton Resources Inc. (AAN: TSX-V) is focused on its 100%
owned Abu Marawat Concession (“Abu Marawat”),
located in Egypt’s Arabian -Nubian Shield, approximately
200 km north of Centamin’s world-class Sukari gold mine.
Aton has identified num erous gold and base metal
exploration targets at Abu Marawat, including the
Hamama deposit in the west, the Abu Marawat deposit in
the northeast, and the advanced Rodruin exploration
prospect in the south of the Concession. Two historic
British gold mines are also located on the Concession at
Sir Bakis and Semna. Aton has identified several distinct
geological trends within Abu Marawat, which display
potential for the development of a variety of styles of
precious and base metal mineralisation. Abu Marawat is
447.7 km2 in size and is located in an area of excellent
infrastructure; a four -lane highway, a 220kV power line,
and a water pipeline are in close proximity, as are the
international airports at Hurghada and Luxor.
Qualified person
The technical information contained in this News Release
was prepared by Javier Orduña BSc (hons), MSc, MCSM,
DIC, MAIG, SEG(M), Exploration Manager of Aton
Resources Inc. Mr. Orduña is a qualified person (QP) under
National Instrument 43-101 Standards of Disclosure for
Mineral Projects.
For further information regarding Aton Resources Inc.,
please visit us at www.atonresources.com or contact:
TONNO VAHK
Interim CEO
Tel: +1 604 318 0390
Email: [email protected]
Note Regarding Forward-Looking Statements
Some of the statements contained in this release are forward-looking statements. Since forward-looking statements
address future events and conditions; by their very nature they involve inherent risks and uncertainties. Actual results
in each case could differ materially from those currently anticipated in such statements.
Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in policies of the TSX
Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.
Appendix A – RC drill hole collar details
Hole ID
Collar co-ordinates 1
Dip 2 Grid
azimuth 2
EOH
depth (m) Comments
X Y Z
HAP-136 534250.6 2913770.3 529.3 -55 180 35
HAP-137 534249.9 2913743.4 526.7 -90 0 25 Not surveyed 3
HAP-138 534203.0 2913760.6 526.3 -90 0 35 Not surveyed 3
HAP-139 534201.6 2913745.1 524.0 -90 0 25 Not surveyed 3
HAP-140 534201.6 2913799.7 526.1 -65 180 59
HAP-141 534163.0 2913766.4 529.0 -50 180 40
HAP-142 534161.9 2913750.2 523.6 -90 0 35
HAP-143 534116.7 2913795.8 526.0 -55 180 70
HAP-144 534114.3 2913819.0 527.9 -55 180 7 Collar collapsing - abandoned
HAP-144a 534114.3 2913819.0 527.9 -55 180 85 Re-drill of HAP-144
HAP-145 534050.8 2913837.0 517.0 -55 170 4 Collar collapsing - abandoned
HAP-145a 534051.7 2913833.8 516.9 -55 170 4 Collar collapsing - abandoned
HAP-145b 534051.7 2913833.8 516.9 -55 170 80 Re-drill of HAP-144/144a
HAP-146 534086.4 2913839.0 522.2 -60 175 110
HAP-147 534121.2 2913838.7 522.3 -55 180 95
HAP-148 534161.0 2913809.8 525.6 -60 180 75
HAP-149 534120.4 2913758.0 510.6 -90 0 30
HAP-150 534094.2 2913767.2 509.7 -55 180 25
HAP-151 534094.3 2913768.4 509.7 -90 0 35
HAP-152 534086.8 2913785.5 508.8 -90 0 90
HAP-153 534060.3 2913796.4 507.5 -90 0 60
HAP-154 534020.9 2913822.4 505.7 -55 180 70
HAP-155 534011.3 2913845.2 504.7 -50 180 80
HAP-156 534022.1 2913849.8 508.1 -55 180 100
HAP-157 533969.3 2913836.0 509.0 -57 180 100
HAP-158 533938.0 2913821.6 506.9 -55 180 90
HAP-159 533900.5 2913792.9 508.4 -65 150 45
HAP-160 533927.3 2913798.4 508.8 -55 165 65
HAP-161 533936.6 2913773.0 510.5 -55 180 40
HAP-162 533940.8 2913749.7 513.3 -55 180 15
Notes:
1) Collar co-ordinates surveyed by Leica TCRA1203+ R1000 Robotic total station
2) Collar surveys of drill holes undertaken at c. 3-6m depth, using a Champ Gyro north-seeking gyroscopic survey tool
3) Short vertical holes HAP-137 to HAP-139 were not downhole surveyed
4) All co-ordinates are UTM (WGS84) Zone 36R
Appendix B – Significant intersections
Hole ID
Intersection (m) 1 Au
(g/t)
Ag
(g/t)
AuEq 2
(g/t) Comments
From To Interval
HAP-136 1 13 12 0.72 23.58 1.00
and 22 26 4 0.42 72.95 1.28
HAP-137 0 12 12 3.71 258.4 6.75
HAP-138 1 26 25 1.24 51.41 1.84
HAP-139 0 8 8 2.86 48.73 3.44
HAP-140 13 55 42 0.60 19.39 0.82
HAP-141 11 40 29 0.50 34.24 0.91 Intersection to EOH
HAP-142 1 35 34 0.76 28.12 1.09 Intersection to EOH
HAP-143 0 60 60 0.61 22.37 0.88
HAP-144 - - - - - - Hole abandoned at 7m, collapsing
HAP-144a 30 68 38 0.28 9.08 0.39 Re-drill of HAP-144, sub-grade
mineralisation from 30-68m incl. 43 47 4 0.47 15.55 0.65
incl. 53 61 8 0.48 10.24 0.60
and 68 79 11 2.02 20.03 2.26
HAP-145 - - - - - - Hole abandoned at 4m, collapsing
HAP-145a - - - - - - Re-drill abandoned, collapsing
HAP-145b 0 71 71 0.55 13.96 0.71 Re-drill of HAP-145/145a
incl. 0 26 26 0.61 17.97 0.82
incl. 40 71 31 0.64 12.93 0.79
HAP-146 6 97 91 0.53 15.58 0.72
incl. 6 9 3 0.54 32.83 0.92
incl. 15 17 2 0.75 17.05 0.95
incl. 29 31 2 0.41 16.60 0.60
also incl. 46 97 51 0.75 17.70 0.95 76-82m: andesite dyke
incl. 46 76 30 0.63 19.03 0.85
incl. 82 97 15 1.23 21.69 1.48
HAP-147 13 15 2 0.31 32.60 0.69
and 19 22 3 0.59 31.63 0.96
and 34 89 55 0.79 22.07 1.05 41-48m: andesite dyke
incl. 34 41 7 0.66 20.73 0.90
incl. 48 89 41 0.94 25.65 1.24
HAP-148 2 68 66 0.92 26.50 1.23
incl. 2 54 52 0.50 20.52 0.74
incl. 54 68 14 2.49 48.71 3.07
HAP-149 3 27 24 0.71 17.31 0.92 0-3m: NSR
HAP-150 0 25 25 0.91 11.62 1.04 12-16m: andesite dyke
incl. 0 12 12 1.15 16.01 1.34
incl. 16 25 9 0.98 10.32 1.10 Hole still in mineralisation at EOH
HAP-151 0 35 35 0.90 14.14 1.07 19-24m: andesite dyke
incl. 0 19 19 1.26 17.32 1.46
incl. 24 35 11 0.70 15.05 0.88 Hole still in mineralisation at EOH
HAP-152 0 59 59 0.62 13.91 0.78 41-49m: andesite dyke
incl. 0 41 41 0.58 15.13 0.76
incl. 49 59 10 1.17 19.60 1.40
Hole ID
Intersection (m) 1 Au
(g/t)
Ag
(g/t)
AuEq 2
(g/t) Comments
From To Interval
HAP-153 1 53 52 0.85 17.23 1.05
HAP-154 0 43 43 0.80 21.56 1.06
incl. 0 17 17 0.31 13.51 0.47
incl. 17 43 26 1.13 26.82 1.44
HAP-155 14 80 66 0.85 26.71 1.17 EOH in mineralisation
incl. 14 36 22 0.55 18.83 0.78
incl. 36 80 44 1.00 30.65 1.36
HAP-156 23 91 68 0.81 22.14 1.07
incl. 23 47 24 0.57 24.07 0.86
incl. 47 91 44 0.93 21.09 1.18
HAP-157 16 85 69 0.58 13.99 0.74
incl. 16 68 52 0.43 12.95 0.58
incl. 74 85 11 1.52 23.85 1.80
HAP-158 1 29 28 0.39 16.48 0.59
HAP-159 0 29 29 0.49 31.26 0.86
HAP-160 14 28 14 0.52 11.12 0.65
HAP-161 1 9 8 1.78 42.95 2.28 0-1m: NSR
HAP-162 0 10 10 1.13 21.21 1.38
Notes:
1) Intersections calculated at a nominal cutoff grade of 0.5 g/t AuEq in runs of continuous mineralisation
2) Gold equivalent, AuEq, is calculated at a ratio of 85:1 Au:Ag (ie. 1 g/t Au = 85 g/t Ag)