Sunday, September 20, 2026
MiningNewsTerminal
Sunday, September 20, 2026 Admin

UX.CN ·

Ten Hole Diamond Drilling Program Completed at Alicia High-Grade Gold Project

Exploration Programs

Ten Hole Diamond Drilling Program Completed at

Alicia High-Grade Gold Project

TORONTO, ON - January 13, 2021 - Monterey Minerals Inc. (the “Company” or “ Monterey”) (CSE:

MREY and FSE :2DK ) is pleased to announce that the Company has completed the previously

announced ten (10) hole diamond drilling program (see press release date d October 7, 2020 ) at its

wholly-owned Alicia high-grade gold and base metals project in the Philippines (“Alicia Project”).

Highlights:

• Monterey’s diamond drilling program at the Alicia Project was completed in December 2020 (see

Figure 1).

• The drilling program consisted of 10 diamond holes for a total of 2,074 metres.

• Preliminary geological interpretations of the drilling results have confirmed the targeted

epithermal style vein structures have been intersected in all holes.

• Assay results are expected in Q1 2021

Figure 1: Plan View of Alicia Project showing location of 2020 drilling and historic sampling results

The ten -hole diamond drilling program commenced on October 7, 2020 and 2,074 metres were

completed in December 2020. The depth of the holes ranged from the first hole, which was 150 metres

in length to the hole number 6, which was 318.8 metres in length with the average length being just

over 200 metres. Monterey’s primary focus was to test the along strike and down dip potential of the

Alicia epithermal vein system. The program targeted three veins (Pamaraw, Baloy and Sandi) and also

included the discovery of a new vein (the Toto Vein) on the property. Alicia now hosts eleven veins

that have been discovered at the project to date.

The target model for the Al icia Project, is that of a multi vein epithermal deposit, located within the

highly prospective “boiling zone” of the hydrothermal system. Recent drilling (Hole #10 – EX SV 019)

also indicates (Figure 2) that there may be a degree of telescoping at the project. Telescoping in

epithermal and porphyry copper systems occurs when there is a reduction in the volcanic surface

throughout the formative life -span of the host volcano. This process is capable of superimposing or

juxtaposing copper porphyry mineralization with the epithermal system.

Figure 2: Chalcopyrite (copper sulphide) identified in Hole #10,

hosted in brecciated silica alteration

Monterey will outline plans for 2021, including further work at the Alicia Project to attempt to identify

additional signs of telescoping of the system. Company geologists will examine both the recent and

historic core for the presence of copper porphyry veinlets; breccias inspected for clasts of potassic

alteration and alteration mapping done to determine if there are any significant areas of potassic

alteration. The previously completed ground magnetic survey will also be reviewed and additional

surveys planned, as well as investigating the use of Induced-Polarisation surveys at the project site.

Qualified Person

The technical information in this press release has been reviewed and approved by Max Tuesley, the

Company’s In-Country Manager, who is a Qualified Person as defined by NI 43-101. Max is a member of the

Australian Institute of Mining and Metallurgy (AusIMM). He is an Australian geologist with over 30 years’

experience and sufficient experience of relevance to the styles of mineralization and types of deposits under

consideration to qualify as a Competent Person as defined by the 2012 Edition of the Joint Ore Reserves

Committee (JORC) Australian Code for Reporting of Exploration Results, Mineral Resources, and Ore Reserves.

About Monterey Minerals Inc.

The Company owns 100% of the Alicia Project in the Alicia Municipality of the Philippines. The Alicia

Project is a system of multiple, high-grade gold and silver veins with base metals over a strike length of

greater than ten kilometres. The Company also owns the Cobalt Mountain Property (the “Property”)

in the Omineca Mining Division of British Columbia near the town of Smithers. The Company’s NI 43 -

101 technical report, available on SEDAR, notes historic sampling on the Property that returned

mineralized showings of gold, silver, copper, zinc and cobalt. The Company also owns 877 sq. km. of

prospective Pilbara Basin tenements on the eastern flank of the Pilbara Basin in Western Australia.

For more information, contact investor relations at [email protected]

On Behalf of the Board of Directors,

James Macintosh,

President and CEO

Neither the Canadian Securities Exchange nor its regulation services provider has reviewed or accepted responsibility for

the adequacy or accuracy of this press release

This press release may include forward -looking information within the meaning of Canadian securities legislation,

concerning the business of the Company. Forward-looking information is based on certain key expectations and assumptions

made by the management of the Company. Although the Company believes that the expectations and assumptions on

which such forward-looking information is based on are reasonable, undue reliance should not be placed on the forwar d-

looking information because the Company can give no assurance that they will prove to be correct. Forward -looking

statements contained in this press release are made as of the date of this press release. The Company disclaims any intent

or obligation to update publicly any forward-looking information, whether as a result of new information, future events or

results or otherwise, other than as required by applicable securities laws.