Tuesday, September 15, 2026
MiningNewsTerminal
Tuesday, September 15, 2026 Admin

ZAU.V ·

Zodiac Gold Announces Initial Trenching Results at the Ben Ben Target and Grant of Stock Options to Directors and Officers

Share Capital & Compensation

Zodiac Gold Announces Initial Trenching

Results at the Ben Ben Target and Grant of

Stock Options to Directors and Officers

Vancouver, British Columbia--(Newsfile Corp. - March 19, 2026) - Zodiac Gold Inc. (TSXV: ZAU) (FSE:

K19) ("Zodiac Gold" or the "Company"), a West African gold exploration company, is pleased to report

new trenching results from the Ben Ben target at its flagship Todi Gold Project in Liberia. The Ben Ben

target forms part of a 16-kilometre gold-in-soil anomaly along the Todi Shear Zone and is one of five

priority targets being advanced within the project area.

Zodiac Gold completed 345.8 metres ("m") of trenching at the Ben Ben target in 2025, including a

standout result of 30m at 1.24 g/t Au (including 1m at 25.1 g/t Au and 1m at 6.61 g/t Au), and

commenced a 3,600m trenching program along the Ben Ben to Youth Camp trend in February 2026.

Results from the recently completed BBT005 returned an intercept of 32m at 0.56 g/t Au (including 14m

at 1.08 g/t Au with a higher-grade interval of 1m at 9.4 g/t Au).

Additional intersections in trenches BBT002, BBT003 and BBT005 include broad zones of lower-grade

mineralization ranging from 0.21 to 0.31 g/t gold over widths of 13 to 36 metres, defining a coherent

mineralized zone which can be traced for a distance of 225m between trenches and for a total of 500m

along the soil anomaly to the artisanal mining pit to the southeast (Map 1). Zodiac Gold has commenced

drilling to test the zone beneath BBT002 as part of Zodiac Gold's on-going drilling program at the Ben

Ben target. Current and planned drill hole locations are shown on Map 1.

Map 1: Trench results at the Ben Ben target

To view an enhanced version of this graphic, please visit:

https://images.newsfilecorp.com/files/7932/289146_d26bcda91408ca50_001full.jpg

Trench collar data is shown in Table 1 and significant intersections are shown in Table 2.

Table 1: 2025-2026 trench collar data at the Ben Ben target

Trench ID

Easting

(UTM WGS84, 29N)

Northing

(UTM WGS84, 29N)

Elevation

(m)

Azimuth

(degrees)

Dip

(degrees)

Length

(m)

BBT001

325511

721959

44

34

0

116.3

BBT002

325726

722008

64

31

0

141.4

BBT003

325833

721979

66

41

0

50.3

BBT004

326074

722276

58

52

0

37.8

BBT005

325886

721838

64

31

0

170

Table 2: Significant trench intersections at Ben Ben

Trench ID

From (m)

To (m)

Interval (m)

Au g/t

BBT001

2.00

27.00

25.00

0.31

Including

22.00

23.00

1.00

3.91

BBT001

52.00

56.00

4.00

0.13

BBT001

59.00

72.00

13.00

0.14

BBT001

76.00

79.00

3.00

0.12

BBT002

0.00

36.00

36.00

0.28

Including

28.00

30.00

2.00

0.81

BBT002

50.00

80.00

30.00

1.24

Including

66.00

73.00

7.00

4.75

Including

66.00

68.00

1.00

6.61

Including

72.00

73.00

1.00

25.1

BBT002

90.00

94.00

4.00

0.13

BBT003

0.00

19.00

19.00

0.21

BBT003

27.00

29.00

2.00

0.19

BBT003

33.00

42.00

9.00

0.15

BBT004

0.00

4.00

4.00

0.21

BBT005

91.00

123.00

32.00

0.56

Including

108.00

122.00

14.00

1.08

Including

111.00

112.00

1.00

9.40

Note that significant intersections have been determined as intervals above 0.1 g/t Au with a minimum length of 2m and a maximum of 2m of

consecutive samples below 0.1 g/t Au. Further exploration is required to confirm the orientation of the mineralized zones and, as such, intervals are

sampled lengths rather than true thicknesses.

Sampling and QA/QC Procedures

After digging with an excavator, the walls of trench BBT005 were cleaned and samples were taken at 1m

intervals in channels along one wall, with care being taken to avoid contamination between samples.

QA/QC procedures included the addition of blank and duplicate samples to the sample sequence, all of

which returned acceptable results. In total, 190 samples (including QA/QC) were collected from BBT005

along a total length of 170 metres.

All samples met the standards for chain of custody without the opportunity for third party access from

Zodiac Gold's exploration camp to the Liberia Geochemical Services Inc. sample preparation laboratory

in Monrovia, Liberia. Each sample was dried and then crushed to 70% passing -2mm and a

representative 1kg split was taken by riffle splitting. The split was then pulverized to 85% passing -75

micron and approximately 200g was bagged and labelled, with the remainder being returned to Zodiac

Gold. Analysis was performed by 50g fire assay with an atomic absorption finish (method Au-AA26) at

the ALS Geochemistry laboratory in Kumasi, Ghana. ALS Geochemistry is independent of Zodiac Gold

and is accredited for method Au-AA26.

Technical Report Update

On December 3, 2025, the Company announced that it had engaged Dr. John Arthur, an accomplished

economic geologist and independent Qualified Person, to prepare an updated NI 43-101 Technical

Report on the Todi Gold Project. The updated Technical Report was originally expected to be completed

in the first quarter of 2026 and include a mineral resource estimate on the Arthington discovery and an

evaluation of exploration targets in the Ben Ben to Youth Camp areas along strike. Based on the

encouraging exploration results at the Ben Ben target to date, the Company has decided to also include

the results of the planned drilling program at Ben Ben in the Technical Report. As a result the Technical

Report is now expected to be completed in the final quarter of calendar 2026.

Stock Option Grant

The Company has granted an aggregate of 3,825,000 stock options ("Options") to its directors and

officers pursuant to the Company's Omnibus Equity Incentive plan. The Options have an exercise price of

C$0.33 per Option, vest immediately and have a ten-year term from the grant date.

Qualified Person

Tom Dowrick, Director of Exploration at Zodiac Gold, is a Chartered Geologist of the Geological Society

of London and a Qualified Person as defined by NI 43-101. He has reviewed and approved the technical

and scientific information provided in this release.

About Zodiac Gold

Zodiac Gold Inc. (TSXV: ZAU) (FSE: K19) is a West-African gold exploration company focused on its

flagship Todi Gold Project situated in Liberia-an underexplored, politically stable, mining friendly

jurisdiction hosting several large-scale gold and iron ore deposits. Strategically positioned along the

fertile Todi Shear Zone, Zodiac Gold is developing a district-scale gold opportunity with additional iron

ore potential, covering a vast 2,316 km2 land package. The Todi Gold Project has undergone de-risking,

showcasing proven gold occurrences at both surface and depth, with five drill-ready targets, of which two

have been drilled and high-grade gold intercepts.

For further information, please visit the Zodiac Gold website at

www.zodiac-gold.com

or contact:

David Kol

President & CEO

[email protected]

Forward-Looking Information

This news release includes certain "forward-looking statements" within the meaning of Canadian

securities legislation.

Forward-looking statements include predictions, projections, and forecasts and are often, but not always,

identified by the use of words such as "seek", "anticipate", "believe", "plan", "estimate", "forecast",

"expect", "potential", "project", "target", "schedule", "budget" and "intend" and statements that an event

or result "may", "will", "should", "could" or "might" occur or be achieved and other similar expressions

and includes the negatives thereof. All statements other than statements of historical fact included in this

release, including, without limitation, statements regarding the Company's planned exploration programs

and drill programs and potential significance of results are forward-looking statements that involve

various risks and uncertainties. There can be no assurance that such statements will prove to be

accurate and actual results and future events could differ materially from those anticipated in such

statements. Forward-looking statements are based on a number of material factors and assumptions.

Important factors that could cause actual results to differ materially from Company's expectations include

actual exploration results, changes in project parameters as plans continue to be refined, results of future

resource estimates, future metal prices, availability of capital, and financing on acceptable terms,

general economic, market or business conditions, uninsured risks, regulatory changes, defects in title,

availability of personnel, materials, and equipment on a timely basis, accidents or equipment

breakdowns, delays in receiving government approvals, unanticipated environmental impacts on

operations and costs to remedy same, and other exploration or other risks detailed herein and from time

to time in the filings made by the Company with securities regulators. Although the Company has

attempted to identify important factors that could cause actual actions, events, or results to differ from

those described in forward-looking statements, there may be other factors that cause such actions,

events, or results to differ materially from those anticipated. There can be no assurance that forward-

looking statements will prove to be accurate, and accordingly readers are cautioned not to place undue

reliance on forward-looking statements.

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the

policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this

release.

To view the source version of this press release, please visit

https://www.newsfilecorp.com/release/289146