Sunday, September 20, 2026
MiningNewsTerminal
Sunday, September 20, 2026 Admin

BFG.CN ·

Bam Bam Resources Announces Majuba Hill Copper Project Drilling Plans

Exploration Programs

NEWS RELEASE

BAM BAM RESOURCES ANNOUNCES MAJUBA HILL COPPER PROJECT

DRILLING PLANS

VANCOUVER—March 25, 2020— Bam Bam Resources Corp. (CSE: BBR / OTC: NPEZF / FSE:

4NPA) (“Bam Bam” or the “Company”) is pleased to announce that contractors have been

identified to carry out the drilling plans at the Majuba Hill Copper Project (the “Project”).

Mr. David Greenway, President & CEO, reports: “I couldn’t be happier with this exploration

update! Drilling plans and contractors have been finalized for the Majuba Hill Copper Project. With

copper coming back into the forefront and investor sentiment on the rise we are very excited to

tell our shareholders about our plans to drill and update the NI 43-101 Technical Report for Majuba

Hill. The previous results and our new interpretation of data has led us to pick the most

advantageous locations for a mixture of core and RC holes. Very exciting times at Bam Bam.”

Majuba Hill is located 156 miles north of Reno, Nevada with excellent road and rail access. The

Project is being explored for near-surface copper oxide porphyry-style mineralization as well as

deeper porphyry-style copper, silver, gold sulfide mineralization. The Company plans to use

Harris Exploration Drilling & Associate, Inc. to drill two core holes in the known copper oxide

mineralization zone on the private, patented mining claims. Harris is based in Fallon, Nevada

and has been providing drilling services for over 50 years.

The Company also plans to use Delong Construction and Drilling to build drill sites and access.

Pending the acceptance of the Drill Notice by the BLM , Delong will also provide Reverse

Circulation drilling for step out and

exploration drill holes. Delong is

based in Winnemucca Nevada.

Historic surface drilling has

delineated an outcropping copper

and silver oxide zone. Historic

core holes drilled by Max

Resources and described in the

Technical Report prepared for

Galileo Exploration Ltd. in May

2017 (NI 43-101 Technical

Report, Majuba Hill Project,

Pershing County, Nevada, A.J.

Morris CPG QP) returned good

oxide copper in a discrete area

around the historic underground

workings. These include:

• MM-05: 89.2 m @ 0.27% Cu from 0 to 89.2 m

• MM-06: 47.4 m at 1.06% Cu from 0 to 47.4 m

• MH-7: 97.5 m at 0.33% Cu from 25.9 to 123.4 m

• MG1703: 20.4 m at 0.71% Cu from 102.9 to 123.3 m

• MMX-24: 112.8 m at 0.45% Cu from 222.5 to 335.3

The goal of the drilling is to confirm and extend the depth and width of the known copper oxide

mineralization and to extend the oxide mineralization to the east.

The Company intends to complete the above drilling and initiate a NI 43-101 compliant report on

the Project which will further delineate the next steps to be taken by the Company to advance the

Project.

About Bam Bam Resources Corp.

Bam Bam Resources Corp. (CSE: BBR / OTC: NPEZF / FSE: 4NP A) is engaged in the

identification, review and acquisition of latter stage copper and copper/gold assets. Management

has been mandated to focus on safe, mining friendly jurisdictions and government regulations

supportive of mining operations.

On Behalf of the Board of Bam Bam Resources Corp.

“David Greenway”

President & CEO

Corporate Office

310-221 West Esplanade

North Vancouver, BC

V7M 3J3

For further information, please contact:

E: [email protected]

P: (604) 318-0114

Neither the Canadian Securities Exchange nor its Market Regulator (as that term is defined in the policies of the

Canadian Securities Exchange) accepts responsibility for the adequacy or accuracy of this release.

This news release may contain forward-looking statements based on assumptions and judgments of management

regarding future events or results. Such statements are subject to a variety of risks and uncertainties, which could

cause actual events or results to differ materially from those reflected in the forward-looking statements. The

Company disclaims any intention or obligation to revise or update such statements.