Friday, September 18, 2026
MiningNewsTerminal
Friday, September 18, 2026 Admin

DAU.V ·

Desert Gold Outlines Phase 1 Exploration Plans at its Tiegba Gold Project in Ivory Coast

Exploration Programs

Desert Gold Outlines Phase 1 Exploration

Plans at its Tiegba Gold Project in Ivory Coast

Delta, British Columbia--(Newsfile Corp. - September 19, 2025) -

Desert Gold Ventures Inc.

(TSXV:

DAU) (FSE: QXR2) (OTCQB: DAUGF) (the "Company") is pleased to announce its upcoming

exploration plans at its recently acquired 297km

2

Tiegba gold project located in Ivory Coast. Phase 1

exploration will combine surface work, including mapping and geochemistry, and high resolution drone

aeromagnetic survey along with wide spaced air core drilling.

Desert Gold's CEO Jared Scharf commented "We're very excited to get back on the ground and start

work at the Tiegba gold project. Based on historic data and what we saw on the ground during our due

diligence site visits, the Tiegba project appears to be poised for a new discovery. The primary

objectives of this program is to drill test the main gold anomaly along the north-east trending shear

corridor while other surface exploration work will focus on broadening the scope of the Tiegba project on

lesser explored parts of the tenement."

Tiegba Project Highlights

District-Scale Structural Potential: Over 10 kilometers of prospective NE-trending shear corridors

mapped, with multiple jogs and bends favorable for gold concentration.

Tier-1 gold district, Proven Regional Analogy: Geological setting shares strong similarities with the

Bonikro-Agbaou mine complex, supporting the potential for large-scale orogenic gold systems.

Multi-Dataset Convergence: Coherent gold-in-soil anomalies coinciding with magnetic lineaments

and structural features, enhancing confidence in target definition.

Multiple Gold Trap Styles Identified: Project covers a largely untested segment of a fertile gold belt

with a presence of shear-hosted lodes, dilation zones, and lithological contacts, providing

significant upside through early-stage exploration.

Target Model; Greenstone shear and Intrusion-hosted deposits (vein & disseminated)

The Tiegba Project represents a highly prospective but underexplored license situated along the Tehini

Shear Zone, a regionally significant structure within a gold belt that hosts more than 7 million ounces of

known endowment (Figure 2). Despite strong surface anomalies and clear structural controls, the project

has never been drill tested, underscoring the opportunity for first-mover discovery.

The 2025-2026 program is designed to advance Tiegba from early-stage mapping toward drill-defined

targets, with the primary objective of validating a multi-kilometre mineralized system capable of

supporting a large-scale gold deposit. Total costs for the upcoming work will be $535,000 (USD) (Table

1). The current scheduled plan is outlined in Figure 1.

Upcoming Exploration Program Summary

Phase 1a - Surface Work (Q4 2025-Q2 2026)

Phase 1 will include ~3,500 soil samples to refine historical soil anomalies and expand grids across

priority areas. This will be supported by geological and regolith mapping over the 297 km² permit,

focusing on high-priority zones to establish a structural framework, transport pathways, and access

routes. Up to 500 rock samples will be collected to validate anomalies, while ~500 metres of grooving

will expose near-surface structures and provide channel samples to confirm grade continuity (Figure 4).

Phase 1b - Drone Geophysics and AC drilling (Q1 2026-Q2 2026)

A UAV-based magnetic survey covering ~164 line-kilometres will be flown over the main northeast

corridor, with a focus on the Tehini Shear Zone.

The orientation of the survey will be perpendicular to the

Tehini Shear Zone at a 50 m spacing (Figure 4). This program will map structural features and magnetic

lithologies, integrating results with soils and drilling to refine and rank targets. Outcomes will include a

stronger structural model and higher-confidence drill planning by mid-2026.

Following up on the Soils and UAV drone mag, will be a ~3500m Aircore (AC) drilling campaign to test

any soil and auger anomalies that also coincide with the updated magnetic data (Figure 3).

Outlook (Next Steps) - RC Drilling (Q2/Q3 2026)

Upon reviewing the successes of the surficial work, updated Mag data, and AC drilling, this will be

followed by target delineation and a ~2,500 metres of reverse circulation drilling to step out from positive

intercepts and test continuity at depth. By the first half of 2026, This next step is expected to deliver

validated targets and detailed collar plans for the next stage of resource drilling.

Table 1. Proposed Phase 1 Exploration Budget

Tiegba Exploration Summary Costs (USD)

AC Drilling + UAV Mag Survey

$175,000

Camp and Field

$80,000

Assays

$110,000

Technical Studies

$50,000

Surface Exploration

$120,000

Total Costs

$535,000

Figure 1. Phased work Program Timeline

To view an enhanced version of this graphic, please visit:

https://images.newsfilecorp.com/files/4954/267090_9dae8f6c84664927_001full.jpg

Figure 2. Tiegba License Regional Scale Planview Map

To view an enhanced version of this graphic, please visit:

https://images.newsfilecorp.com/files/4954/267090_9dae8f6c84664927_002full.jpg

Figure 3. Tiegba Planview highlighting Anomalous Gold Trends with Proposed AC lines (red)

To view an enhanced version of this graphic, please visit:

https://images.newsfilecorp.com/files/4954/267090_9dae8f6c84664927_003full.jpg

Figure 4. Teigba Plan View with Proposed Soils and Drone Mag survey areas

To view an enhanced version of this graphic, please visit:

https://images.newsfilecorp.com/files/4954/267090_9dae8f6c84664927_004full.jpg

On Behalf of the Board

"Jared Scharf"

___________________________

Jared Scharf

President & CEO

Qualified Person Statement

The scientific and technical information contained in this news release has been reviewed and approved

by Ty Magee (M.Sc., P. Geo), a Qualified Person as defined by National Instrument 43-101 Standards of

Disclosure for Mineral Projects. Mr. Magee is an advisor and consultant to Desert Gold Ventures and is

considered independent of the Company.

About Desert Gold

Desert Gold Ventures Inc. is a gold exploration and development company which controls the 440 km

2

SMSZ Project in Western Mali containing Measured and Indicated Mineral Resources of 8.47 million

tonnes grading 1.14 g/t gold totaling 310,300 ounces and Inferred Mineral Resources of 20.7 million

tonnes grading 1.16 g/t gold totaling 769,200 ounces.

For further information please visit

www.SEDAR.com

under the company's profile. Website:

www.desertgold.ca

Contact

Jared Scharf, President and CEO

Email:

[email protected]

References

1

Allied Gold Corporation. (2024). Annual Information Form and Technical Summary - 2024 (pp. 42-44). Retrieved from

https://www.alliedgold.com/files/documents/Allied-Gold-AIF-2024.pdf

2

Perseus Mining Limited. (2024, August). Annual Resource and Reserve Statement - FY2024. Retrieved from

https://perseusmining.com/wp-

content/uploads/2024/08/FY24-Resource-Reserve-Update.pdf

3

Thor Explorations Ltd. (September 16, 2024). "Thor Explorations Announces the Acquisition of the Guitry Project and Expansion into Côte d'Ivoire"

This news release contains forward-looking statements. These forward-looking statements entail various risks and uncertainties that could cause

actual results to differ materially from those reflected in these forward-looking statements. Such statements are based on current expectations,

are subject to a number of uncertainties and risks, and actual results may differ materially from those contained in such statements. These

uncertainties and risks include, but are not limited to, the strength of the capital markets, the price of gold; operational, funding, liquidity risks, the

degree to which Mineral Resource estimates are reflective of actual Mineral Resources, the degree to which factors which would make a mineral

deposit commercially viable, and the risks and hazards associated with mining operations. Risks and uncertainties about the Company's

business are more fully discussed in the company's disclosure materials filed with the securities regulatory authorities in Canada and available at

www.sedar.com

and readers are urged to read these materials. The Company assumes no obligation to update any forward-looking statement or

to update the reasons why actual results could differ from such statements unless required by law. Neither the TSX Venture Exchange nor its

regulation services provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or

accuracy of this release. This news release does not constitute an offer to sell or a solicitation of an offer to buy the securities described herein in

the United States. The securities described herein have not been and will not be registered under the United States securities act of 1933, as

amended, and may not be offered or sold in the United States or to the account or benefit of a U.S. person absent an exemption from the

registration requirements of such act.

To view the source version of this press release, please visit

https://www.newsfilecorp.com/release/267090