Canstar Consolidates Mary March Land Position with Strategic Eagleridge Option
Canstar Consolidates Mary March Land Position with
Strategic Eagleridge Option
Toronto, Ontario--(Newsfile Corp. - February 19, 2026) - Canstar Resources Inc. (TSXV:
ROX) (OTCID: CSRNF) ("Canstar" or the "Company") has entered into an option
agreement dated January 16, 2026 (the “Option Agreement”) with Eagleridge International
Limited (the “Optionor”) to acquire a 100% undivided interest in mineral licence 006894M
(17 claims) located adjacent to the Company’s Mary March Project in central
Newfoundland (the “Eagleridge Claims”).
The Eagleridge Claims directly adjoin Mary March at Beothuk Lake and extend Canstar’s
tenure across the projected eastern continuation of the Mary March–Nancy April
volcanogenic massive sulphide (“VMS”) system (Figure 1).
Juan Carlos Giron Jr., President & CEO, stated:
“This is a strategic consolidation of the Mary March system. The geology does not stop at
the former property boundary, and neither should our exploration. The Eagleridge Claims
extend our control over the projected eastern continuation of the Mary March–Nancy April
VMS system and allow us to execute our 2026 geophysical and drill programs without
constraint.
With our partnership with VMS Mining Corporation, a fully funded 2026 exploration
program, and multiple high-confidence targets emerging from our structural model, we
believe Mary March represents a rare opportunity — high-grade VMS potential in a proven
district that remains materially underexplored with modern tools.”
Strategic Rationale
This acquisition completes a key gap in Canstar’s land position over a structurally
complex, high-grade VMS system within the Buchans-Roberts Arm Belt — host to the
historic Buchans Mine, which produced 16.2 million tonnes of ore at average grades of
approximately 14.5% Zn, 7.6% Pb, 1.3% Cu, 126 g/t Ag and 1.37 g/t Au between 1928 and
1984.
Mary March has already delivered one of the most significant base metal drill intercepts in
the belt outside the historic mine area:
9.63 metres grading 4.2 g/t Au, 122 g/t Ag, 10.1% Zn, 1.8% Pb and 0.64% Cu1
Multiple historic drill holes extended eastward beneath Beothuk Lake into the Eagleridge
ground and encountered strongly altered felsic volcanic rocks consistent with VMS
footwall environments. The regional structural model — characterized by stacked thrust
panels — indicates that fault-offset repetitions of the Mary March–Nancy April system may
occur to the east.
By securing the Eagleridge Claims, Canstar:
• Consolidates control of the full projected strike and structural continuation of the
Mary March system
• Eliminates a historic property boundary that bisected the geological model
• Enables seamless execution of ground geophysics and drilling across the entire
target corridor
• Prevents competitive encroachment in a proven but underexplored sector of the
Buchans belt
Over the past 12 months, Canstar has staked new licenses and purchased claims from
prospectors to systematically expand and consolidate its land package at Mary March to
build a contiguous, district-scale position in what management believes is one of the most
prospective yet underexplored portions of the Buchans camp.
Figure 1: The Eagleridge Claims directly adjoin Mary March at Beothuk Lake and extend
Canstar’s tenure across the projected eastern continuation of the Mary March–Nancy April
volcanogenic massive sulphide.
Integration into 2026 Exploration Program
The Eagleridge Claims are being immediately incorporated into Canstar’s winter 2026
technical/geophysical program, which includes:
• High-resolution drone magnetics
• Ground-based induced polarization (IP) surveys
• Borehole electromagnetic (EM) surveys of select historic drill holes
Continuous geophysical coverage across the former property boundary is expected to
materially enhance structural interpretation and drill targeting.
These programs are designed to refine high-confidence, structurally informed drill targets
in advance of Canstar’s fully funded 2026 drill campaign, expected to commence when
ground conditions permit in early 2026 under the Company’s strategic exploration JV with
VMS Mining Corp for up to $11.5 million.
Land Access Agreement
The Company has also entered into a land access agreement (the “Access Agreement”)
with a private landholder in the Mary March area. Under the terms of the Access
Agreement, dated February 4, 2026, Canstar may access the private land for its winter
geophysics program by issuing 79,000 common shares and making a one-time cash
payment of $7,500. The transaction remains subject to TSX Venture Exchange approval,
and all securities issued will be subject to a statutory hold period.
Option Agreement Terms
Under the terms of the Option Agreement, dated January 16, 2026, Canstar may acquire a
100% undivided interest in the Eagleridge Claims over a three-year period by issuing an
aggregate of 575,000 common shares, making aggregate cash payments of $110,000, and
incurring $450,000 in exploration expenditures. Upon receipt of TSX Venture Exchange
approval, the Company will issue 100,000 common shares and pay $10,000 in cash. On or
before the first anniversary of the agreement, Canstar must incur $100,000 in exploration
expenditures, issue 125,000 common shares and pay $25,000 in cash. On or before the
second anniversary, the Company must incur an additional $150,000 in expenditures,
issue 150,000 common shares and pay $30,000 in cash. On or before the third anniversary,
Canstar must incur a further $200,000 in expenditures, issue 200,000 common shares and
pay $45,000 in cash. Upon exercise of the option, the Property will be subject to a 1.0% net
smelter returns royalty. The transaction remains subject to TSX Venture Exchange
approval, and all securities issued will be subject to a statutory hold period.
Qualified Person Statement
Bob Patey B.Sc. (Hons), Vice President for Exploration for Canstar and a Qualified Person as
defined in NI 43 -101, has reviewed and approved all scientific and technical information
disclosed in this news release.
Acknowledgement
Canstar acknowledges the financial support of the Junior Exploration Assistance (“JEA”)
Program from the Government of Newfoundland and Labrador Department of Industry,
Energy and Technology, which has been a valuable contribution to the exploration programs
on the Company’s Buchans-Mary March and Golden Baie projects.
About Canstar Resources Inc.
Canstar Resources Inc. (TSXV: ROX) is an exploration company focused on critical minerals
and gold. The Company’s 100%-owned Golden Baie Project (489.5 km 2) hosts high-grade
gold and antimony showings along a major mineralized structure that also hosts a large
number of gold deposits. The Buchans and Mary March projects (142.1 km 2) are located
within the world-class, past -producing VMS zinc -, copper-, gold - and silver-rich Buchans
Mining Camp and boast high-grade zinc and copper discoveries.
(1) Reported by Phelps Dodge in 1999 (historic unverified assays).
For further information, please contact:
Juan Carlos Giron, Jr.
President & Chief Executive Officer
Email : [email protected]
Phone : (647) 557-3442
Website: www.canstarresources.com
Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in
the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or
accuracy of this release.
Forward-Looking Statements
This news release contains certain “forward -looking statements” and “forward -looking
information” within the meaning of applicable Canadian securities laws. Forward-looking
information is generally identifiable by the use of forward -looking terminology suc h as
“expects”, “plans”, “intends”, “anticipates”, “believes”, “estimates”, “may”, “will”,
“potential”, “proposed” or variations of such words and phrases, or statements that certain
actions, events or results “may”, “could”, “would” or “might” occur or be achieved.
Forward-looking statements are not historical facts.
Forward-looking statements in this news release include, but are not limited to, statements
regarding: the anticipated benefits and strategic rationale of the Option Agreement and the
consolidation of the Company’s land position at the Mary March Project; the projected strike
and structural continuation of the Mary March–Nancy April VMS system and the Company’s
interpretation of the geological potential of the Eagleridge Claims; the integration of the
Eagleridge Claims into the Company’s planned winter 2026 technical and geophysical
program; the timing, scope, and expected outcomes of planned exploration activities,
including drone magnetic surveys, induced polarization surveys, borehole electromagnetic
surveys, and the anticipated impact of continuous geophysical coverage on structural
interpretation and drill targeting; the timing and expected commencement of the Company’s
2026 drill program; the objectives, scope, and anticipated benefits of the Company’s
strategic exploration joint venture with VMS Mining Corporation and the anticipated funding
available thereunder; the Company’s ability to satisfy the terms of the Option Agreement,
including the issuance of common shares, the payment of cash consideration , and the
incurrence of exploration expenditures within the required timeframes; the receipt of TSX
Venture Exchange approval for the Option Agreement and the Access Agreement; and the
expected ability to access private lands pursuant to the Access Agreement and complete
the related consideration, including the issuance of common shares and the payment of the
cash amount.
Forward-looking statements are based on management’s expectations and assumptions as
of the date hereof, including, without limitation: the Company’s ability to obtain TSX Venture
Exchange and other required regulatory approvals; the Company’s ability to satisfy the terms
and timelines of the Option Agreement and Access Agreement; the continued cooperation
of counterparties and landholders; the availability of contractors, equipment, supplies and
qualified personnel; favourable weather and ground conditions ; the ability to access the
project area and conduct planned exploration activities as scheduled; the Company’s ability
to maintain its exploration joint venture arrangements on terms consistent with current
expectations, including the availability of funding for planned programs; and commodity
prices and market conditions remaining broadly consistent with current expectations.
Forward-looking statements are subject to known and unknown risks, uncertainties and
other factors that may cause actual results, performance or achievements to differ
materially from those expressed or implied by such forward-looking statements. These risks
and uncertainties include, but are not limited to: the risk that the Company does not obtain
TSX Venture Exchange approval for the Option Agreement and/or the Access Agreement; the
risk that the Company is unable to satisfy the terms of the Option Agree ment or the Access
Agreement within the required timeframes, including the issuance of shares, payment of
cash consideration, or incurrence of required exploration expenditures; the risk that
counterparties or landholders do not perform as expected; risks inherent in mineral
exploration, including that exploration results may not be as anticipated or may not support
further exploration or development; uncertainties in geological interpretation and modelling,
including that the projected continuation of mine ralization may not be confirmed by
exploration; operational and logistical risks, including adverse weather, delays, equipment
failure, contractor performance, and access limitations; permitting and regulatory risks; the
risk that the Company’s planned programs are delayed or cannot be carried out as currently
contemplated; commodity price fluctuations, foreign exchange fluctuations, and general
market and financing conditions. Additional risks are described in the Company’s public
disclosure available on SEDAR+.
Although the Company has attempted to identify important factors that could cause actual
results to differ materially from those contained in forward -looking statements, there may
be other factors that cause results not to be as anticipated, estimated or i ntended. There
can be no assurance that such statements will prove to be accurate, as actual results and
future events could differ materially from those anticipated in such statements. Forward -
looking information is provided as of the date of this news release and the Company
undertakes no obligation to update or revise any forward -looking information, whether as a
result of new information, future events or otherwise, except as required by applicable law.