Bam Bam Completes 2021 Drill Program at Majuba Hill Project in Nevada
1
*Press Release December 6, 2021
Bam Bam Completes 2021 Drill Program
at Majuba Hill Project in Nevada
VANCOUVER, BC — December 6, 2021 — Bam Bam Resources Corp. (CSE: BBR /
OTC: NPEZF / FSE: 4NPB) (“Bam Bam” or the “Company”) is pleased to report that
the 2021 core and reverse-circulation (“RC”) drill program is complete for the Majuba
Hill Project in Pershing County Nevada. 2021 Drilling focused on three areas:
• Majuba Known Copper Oxide
• Copper-Gold Target (New Porphyry Discovery-BBR News Nov. 8, 2021)
• DeSoto Copper Oxide Target
Sixteen holes were drilled for a total of 4,539.5 meters (14,893.5 feet).
All RC and core samples have been processed and delivered to the ALS Sample Prep
Facilities in Reno and Elko, Nevada. Assay results will be reported when they are
complete.
2
David Greenway, President and CEO, commented: “I am pleased with the 2021
drilling program. The visual results we were able to report from the core in the
Copper-Gold Discovery area is very exciting for the development of a significant
copper porphyry deposit at Majuba Hill.”
Hole Target Type Azimuth Angle Length (m) Length (ft)
MHB-10 Known Oxide RC 0 -90 257.6 845
MHB-11 Known Oxide RC 0 -70 152.4 500
MHB-12 Known Oxide RC 0 -45 213.4 700
MHB-13 Known Oxide RC 0 -90 208.8 685
MHB-14 Known Oxide RC 0 -90 356.6 1170
MHB-15 Known Oxide RC 0 -90 304.8 1000
MHB-16 Known Oxide RC 0 -90 196.3 644
MHB-17 Known Oxide RC 0 -90 243.8 800
MHB-18 Known Oxide RC 0 -90 243.8 800
MHB-19 Known Oxide RC 110 -45 54.9 180
MHB-20 Copper-Gold Core 10 -70 310.0 1017
MHB-21 Known Oxide RC 252 -80 454.2 1490
MHB-22 Copper-Gold Core 140 -60 549.4 1802.5
MHB-23 Known Oxide RC 0 -90 304.8 1000
MHB-24 Known Oxide RC 90 -45 243.8 800
MHB-25 DeSoto RC 0 -90 140.2 460
MHB-26 DeSoto RC 0 -90 304.8 1000
Quality Assurance/Quality Control ("QA/QC") Measures, Chain of Custody
The Company has implemented a QA/QC program using best industry practices at
the Majuba Hill Project. The samples are transported from the BBR secure warehouse
or directly from the project to the ALS Sample Prep Facility in Reno or Elko, Nevada.
ALS then t ransports the prepared pulps to their analytical lab in Reno, Nevada or
Vancouver, B.C. Soil and rock chip samples are transported by the company directly
to Elko or Reno, Nevada.
Drill core samples are sawn in half lengthwise and one half is placed in labeled cloth
sample bags. All samples are analyzed for copper, gold, silver, and 3 3 other
elements. Gold is determined by ALS method Au-AA23 which is a fire assay with an
AAS finish on a 30 gram split. Copper, silver and the remaining 31 elements are
determined by ALS method ME -ICP61 which is a four acid digestion and ICP -AES
assay. Approximately 5% of the submitted samples are drill duplicates and copper-
gold-porphyry commercial standard reference material pulps.
Qualified Person
The scientific and technica l information contained in this news release has been
reviewed by E.L. "Buster" Hunsaker III, CPG 8137, a non -independent consulting
geologist who is a "Qualified Person" as such term is defined under National
Instrument 43-101 - Standards of Disclosure for Mineral Projects ("NI 43- 101").
3
About Bam Bam Resources Corp.
Bam Bam Resources Corp. (CSE: BBR / OTC: NPEZF / FSE: 4NPB) is engaged in the
identification, review and acquisition of latter stage copper and copper/ silver/gold
assets. This is in direct response to the growing worldwide demand and lack of supply
for precious metals fueled by the Green New Deal in the US and most other developed
nations with similar programs aimed at addressing climat e change. Such programs
are heavily reliant on silver, gold and especially copper to produce Electric Vehicles
and other renewable power sources, as well as building infrastructure to provide clean
and affordable electricity.
The flagship project is the Majuba Hill copper , silver and gold District located 156
miles outside Reno, Nevada, USA. Management has been mandated to focus on safe,
mining friendly jurisdictions where government regulations are supportive of mining
operations.
Neither the Canadian Securities Exchange nor its Market Regulator (as that term is
defined in the policies of the Canadian Securities Exchange) accepts responsibility for
the adequacy or accuracy of this release.
On Behalf of the Board of Bam Bam Resources Corp.
“David Greenway”
David C. Greenway
President & CEO
For further information, please contact:
Joel Warawa
VP of Corporate Communications
P: 1 (855) 475-0745
Forward-Looking Statements
This news release contains certain statements that may be deemed "forward -looking" statements. Forward looking
statements are statements that are not historical facts and are generally, but not always, identified by the words
"expects", "plans", "anticipat es", "believes", "intends", "estimates", "projects", "potential" and similar expressions, or
that events or conditions "will", "would", "may", "could" or "should" occur. Although Bam Bam Resources Corp. believes
the expectations expressed in such forward -looking statements are based on reasonable assumptions, such
statements are not guarantees of future performance and actual results may differ materially from those in forward
looking statements. Forward looking statements are based on the beliefs, estimate s and opinions of Bam Bam
Resources Corp. management on the date the statements are made. Except as required by law, Bam Bam Resources
Corp. undertakes no obligation to update these forward -looking statements in the event that management's beliefs,
estimates or opinions, or other factors, should change.