Aris Mining Reports Q2 2023 Financial and Operating Results

Production Results Financials

Vancouver, Canada, August 9, 2023 – Aris Mining Corporation (Aris Mining or the Company) (TSX: ARIS; OTCQX: TPRFF) announces financial and operating results for the three and six months ended June 30, 2023 (H1 2023). All amounts are in US dollars unless otherwise indicated.

Aris Mining CEO Neil Woodyer stated: “Since the merger with GCM Mining in September 2022, Aris Mining has been making continuous progress in the integration and transformation of our Colombian operations. We've been diligently advancing our growth projects by closely collaborating with local stakeholders. With the acquisition of permits and secure funding in place, we are poised to commence construction on the Marmato Lower Mine project in late Q3 2023.

Additionally, our efforts are focused on driving forward the Soto Norte project. Notably, this project has recently received confirmation of its location outside the Páramo de Santurbán, a protected area of the Andes mountains. This affirmation comes after a favorable delimitation process completed in June 2023, involving local communities and government authorities in the four municipalities associated with the project.

During the six-months ending on June 30, we achieved significant milestones. Our gold sales reached 103,386 ounces, resulting in $68 million in income from mining operations. A particular emphasis of our operations review has been on the Segovia Operations business structure. Here, approximately 55% of our production stems from the traditional 'owner-operated' mining approach, while the remaining 45% originates from 'partner-operated' mining. This partner-operated mining category encompasses our contractor workforce as well as the acquisition of mill-feed from artisanal and small-scale miner units.

Our 'for-profit' partnerships with community-based groups introduce two distinct operating cost structures at the Segovia Operations. During H1 2023, the all-in sustaining costs from our owner-operated mining operations were $1,007 per ounce of gold1. In contrast, the AISC from partner-operated mining operations was $1,236 per ounce of gold1. It's notable that our partner-operated cost structure primarily hinges on a percentage of the spot gold price.

Anticipating an upswing in partner-operated mining activities for the latter half of 2023, we have developed projections based on an average gold price of $1,900 per ounce. As a result, we are revising our overall 2023 outlook for the Segovia Operations AISC to a range of between $1,125 and $1,175 per ounce of gold.”

Operations Review – H1 2023

  • Total production of 104,906 ounces of gold from the Segovia Operations (94,395 ounces) and the Marmato Upper Mine (10,511 ounces).
  • Segovia Operations had attributable gold production from owner-operated mining of 52,732 ounces at an AISC of $1,007 per ounce, and 41,663 ounces from partner-operated mining at an AISC of $1,236 per ounce.
  • Income from mining operations of $68.0 million.
  • EBITDA of $51.6 million1 and adjusted EBITDA of $78.2 million1.
  • Expenditures of $30.9 million on growth capital, including $10.2 million at the Segovia Operations, $11.3 million at the Marmato Upper and Lower Mines, and $9.3 million at the Toroparu Project1.
  • Net earnings of $2.9 million or $0.02 per share.
  • Adjusted earnings of $26 million or $0.19 per share1.
  • Cash and cash-equivalents of $214.3 million as of June 30, 2023, following a $52.9 million annual tax payment in Q2 related to Segovia Operations taxable income from 2022.

Full Year 2023 Outlook

  • To continue developing and expanding the ‘partner-operated’ mining model across the Segovia Operations, Marmato Mine and the Soto Norte Project. This commitment is rooted in our firm belief that cultivating ‘for-profit’ community partnerships is the most effective way to drive the sustained growth of our business within the Colombian landscape; it not only bolsters the well-being of those involved but also contributes to the broader objective of responsible mining practices.
  • Based on H1 production and H2 outlook (see table below), the Segovia Operations are expected to produce between 195,000 and 210,000 ounces at an AISC of between $1,125 and $1,175 per ounce during 2023.
  • The Marmato Lower Mine construction plan is expected to allow the existing Upper Mine to continue producing gold in the range of 20,000 to 30,000 ounces during 2023, in line with the 25,216 ounces produced in 2022.
  • On a consolidated basis, Aris Mining expects to produce between 220,000 and 240,000 ounces during 2023, which compares to the previous guidance range of between 230,000 and 270,000 ounces.

Segovia Operations – Mid-year 2023 Outlook

H1H2 Outlook Low - HighFY 2023 Outlook
ActualLow-High
Owner-operated mining (ounces)1 52,732 57,000 - 66,000 Attributable AISC/oz $ 1,007 $ 950 - $ 1,050 Partner-operated mining (ounces)2 41,663 43,000 - 51,000 Attributable AISC/oz $ 1,236 $ 1,200 - $ 1,300 Total Segovia Operations 94,395 100,000 - 115,000 AISC/oz, total mining operations $ 1,108 $ 1,145 - $ 1,245 Previous 2023 production guidance for Segovia Operations Previous 2023 AISC/oz guidance for Segovia Operations352,732111,000-118,000
$ 1,007$1,000-$ 1,050
41,66384,000-92,000
$ 1,236$1,250-$ 1,300
94,395195,000-210,000
$ 1,108$ 1,125-$ 1,175
1 Refer t directly cAISC/oz, total mining operatio Previous 2023 production guid Previous 2023 AISC/oz guidanc 1. Attributable production from Comp 2. Attributable production from contr Company’s Maria Dama plant for pr 3. Previous 2023 AISC/oz guidance waAISC/oz, total mining operatio Previous 2023 production guid Previous 2023 AISC/oz guidanc
200,000-230,000
$950-$1,050
o the Non-IFRS Measures section for a rec omparable financial measure disclosed in
News Release Additional Q2 2023 and H1 2023 Financial and Operating Highlights Three months ended Three months ended Six months ended June 30, 2023 March 31, 2023 June 30, 2023
Three months endedSix months ended
June 30, 2023June 30, 2023
54,22849,158 50,903 1,869 91,863 922 1,214 33,152 21,105 38,646 (5,401) 11,176 (0.04) 0.08103,386
54,003104,906
1,9591,888
106,239198,102
1,019973
1,2341,225
34,87768,029
30,49651,601
39,52878,174
8,2582,857
14,83726,013
0.060.02
0.110.19
Balance sheet, as at ($000s)June 30, 2023December 31, 2022
Cash and cash equivalents Total assets Total debt2 Senior Notes Gold Notes Convertible Debentures Shareholders’ equity214,344299,461 1,242,120 300,000 66,006 13,300 501,375
1,235,023
300,000
62,312
13,593
570,679

1. Refer to the Non-IFRS Measures section for full details on cash costs ($ per oz sold), AISC ($ per oz sold), EBITDA, adjusted EBITDA, adjusted earnings and additions to mining interests. Comparative cash cost and AISC values have been adjusted from amounts disclosed prior to Q3 2022 following a change in the methodology used to calculate total cash costs ($ per oz sold) and AISC ($ per oz sold) in Q3 of 2022.

2. The principal of current and long-term debt as at June 30, 2023 are as disclosed in Note 10 to the Interim Financial Statements.

Aris Mining’s Q2 2023 interim financial statements and related MD&A are available on SEDAR+ and in the Financials section of Aris Mining’s website here.

About Aris Mining

Aris Mining is a Canadian company led by an executive team with a track record of creating value through building globally relevant mining companies. In Colombia, Aris Mining operates several high-grade underground mines at its Segovia Operations and the Marmato Mine, which together produced 235,000 ounces of gold in 2022. Aris Mining is currently advancing the Marmato Lower Mine Expansion project, which will provide access to wider porphyry mineralization below the current Upper Mine. Following completion and ramp up of the Marmato Lower Mine Expansion project in 2025, the Marmato Mine is expected to deliver average production of 162,000 ounces per year over a nearly 20-year mine life from the existing mineral reserves2. Aris Mining also operates the Soto Norte Project joint venture, where environmental licensing is advancing to develop a new underground gold, silver and copper mine. In Guyana, Aris Mining is advancing the Toroparu Project, a gold/copper project. Aris Mining plans to pursue acquisition and other growth opportunities to unlock value creation from scale and diversification.

Aris Mining promotes the formalization of artisanal and small-scale mining as this process enables all miners to operate in a legal, safe and responsible manner that protects them and the environment.

Additional information on Aris Mining can be found at www.aris-mining.com and www.sedarplus.ca.

Aris Mining contacts:

Tyron Breytenbach Kettina Cordero Senior Vice President, Capital Markets Vice President, Investor Relations +1 416.399.2739 + 604.417.2574 [email protected]

Cautionary Language

Non-IFRS Measures

Cash costs ($ per oz sold), AISC ($ per oz sold), EBITDA, adjusted EBITDA, adjusted (loss)/earnings and expenditures on growth capital are non-IFRS financial measures and non-IFRS ratios contained in this document. These measures do not have any standardized meaning prescribed under IFRS, and therefore may not be comparable to other issuers. For full details on these measures and ratios refer to the “Non-IFRS Measures” section of the Company’s Management’s Discussion and Analysis for the three months and six months ended June 30, 2023 (MD&A). The MD&A is incorporated by reference into this news release and is available on the Company’s profile on SEDAR+ at www.sedarplus.ca.

The tables below reconcile the non-IFRS financial measures contained in this news release for the current and comparative periods to the most directly comparable financial measure disclosed in the Company's Q2 2023 financial statements.

2 See sec
tion entitled Qualified Person and Technic

2 See section entitled Qualified Person and Technical Information for the reference to technical information.

News Release Total cash costs Segovia Operations Total Operations Three months ended, Six months ended, Three months ended, Six months ended, ($000s except per ounce amounts) Jun 30, 2023 Mar 31, 2023 Jun 30, 2023 Jun 30, 2023 Mar 31, 2023 Jun 30, 2023 Total gold sold (ounces) 48,381 44,908 93,289 54,228 49,158 103,386 Cost of sales1 51,030 44,083 95,113 62,947 53,705 116,652 Less: royalties1 (3,488) (2,660) (6,148) (4,615) (3,410) (8,025) Less: by-product revenue1 (2,755) (4,877) (7,632) (3,077) (5,043) (8,120) Less: other adjustments - - - - 77 77 Total cash costs 44,787 36,546 81,333 55,255 45,329 100,584 Total cash costs ($ per oz gold 926 814 872 1,019 922 973 sold)News Release Total cash costs Segovia Operations Total Operations Three months ended, Six months ended, Three months ended, Six months ended, ($000s except per ounce amounts) Jun 30, 2023 Mar 31, 2023 Jun 30, 2023 Jun 30, 2023 Mar 31, 2023 Jun 30, 2023
Jun 30, 2023Jun 30, 2023
93,28954,228 49,158 62,947 53,705 (4,615) (3,410) (3,077) (5,043) - 77103,386
95,113116,652
(6,148)(8,025)
(7,632)(8,120)
-77
81,33355,255 45,329100,584
8721,019 922973

1. As presented in the Interim Financial Statements and notes for the respective periods.

All-in sustaining costs (AISC)

Segovia Operations Total Operations

Three months ended, Six months ended, Three months ended, Six months ended,

($000s except per ounce amounts) Jun 30, 2023 Mar 31, 2023Jun 30, 2023Jun 30, 2023 Mar 31, 2023Jun 30, 2023
Total gold sold (ounces) 48,381 44,908 Total cash costs 44,787 36,546 Add: royalties1 3,488 2,660 Add: social programs1 2,419 2,404 Add: sustaining capital 2,450 7,332 expenditures Add: lease payments on sustaining 588 656 capital93,28954,228 49,158 55,255 45,329 4,615 3,410 2,666 2,404 3,812 7,867 588 656103,386
81,333100,584
6,1488,025
4,8235,070
9,78211,679
1,2431,243
Total cash costs 53,732 49,598103,32966,936 59,666126,601
Total cash costs ($ per oz gold sold) 1,111 1,1041,1081,234 1,2141,225

1. The Marmato Mine was purchased as part of the Aris Mining Transaction on September 26, 2022, as such prior year comparatives are not applicable to the Company.

The table below reconciles the cash cost per ounce sold and the AISC per ounce sold for ore sourced from owner-operated mines and other partner-operated mines to the totals for the consolidated Segovia Operations:

Six months ended June 30, 2023 Owner Operated mining1 Partner Operated mining2 Total Segovia Attributable gold sold (ounces) 52,120 41,169 93,289 Total cash costs ($'000)3 35,805 45,528 81,333 Cash cost per ounce sold ($/ounce)3 $ 687 $ 1,106 $ 872 All-in sustaining costs ($'000)3 52,462 50,867 103,329 AISC cost per ounce sold ($/ounce)3 $ 1,007 $ 1,236 $ 1,108 1. Includes Company-operated areas within the mines, utilizing owner-managed labour. 2. Comprises contractor-operated and other small-scale mining operations within the Company’s mining title that are operated by miners under contract to deliver the mill feed mined to the Company’s Maria Dama plant for processing. 3. Refer to the Non-IFRS Measures section for full details on cash costs ($ per oz sold) and AISC ($ per oz sold). Comparative cash cost and AISC values have been adjusted from amounts previously disclosed following a change in the methodology used to calculate total cash costs ($ per oz sold) and AISC ($ per oz sold) in Q3 of 2022. TSX:ARIS aris-mining 5Six months ended June 30, 2023
Owner Operated mining1Partner Operated mining2Total Segovia
52,12041,16993,289
35,80545,52881,333
$ 687$ 1,106$ 872
52,46250,867103,329
$ 1,007$ 1,236$ 1,108
1. Includes Company-operated areas within the mines, utilizing owner-managed labour. 2. Comprises contractor-operated and other small-scale mining operations within the Company’s mining title that are operated by miners under contract to deliver the mill feed mined to the Company’s Maria Dama plant for processing. 3. Refer to the Non-IFRS Measures section for full details on cash costs ($ per oz sold) and AISC ($ per oz sold). Comparative cash cost and AISC values have been adjusted from amounts previously disclosed following a change in the methodology used to calculate total cash costs ($ per oz sold) and AISC ($ per oz sold) in Q3 of 2022. TSX:ARIS aris-mining 5

Additions to mineral interests, plant and equipment

Three months ended, Six months ended,

($’000)June 30, 2023March 31, 2023 June 30, 2022June 30, 2023June 30, 2022
Sustaining capital Segovia Operations Marmato Upper Mine1 Total Non-sustaining growth capital Segovia Operations Toroparu Project Marmato Lower Mine1 Marmato Upper Mine1 Juby Project1 Total7,332 11,176 535 -19,698 -
2,4509,782
1,3621,897
3,8127,867 11,176 2,641 3,169 4,690 24,228 3,881 - 681 - 33 -11,67919,698 8,168 30,964 - - -
7,63910,280
4,6259,315
6,12610,007
6451,326
-33
19,03511,926 27,39730,96139,132
Total Additions222,84719,793 38,57342,64058,830

1. The Marmato Mine and Juby Project were purchased as part of the Aris Mining Transaction on September 26, 2022, as such prior year comparatives are not applicable to the Company.

2. As presented in the Interim Financial Statements and notes for the respective periods

Earnings before interest, taxes, depreciation, and amortization (EBITDA) and adjusted EBITDA Three months ended, Six months ended,

($000s)June 30, 2023March 31, 2023 June 30, 2022June 30, 2023June 30, 2022
Earnings (loss) before tax1 Add back: Depreciation and depletion1 Finance income1 Interest and accretion117,2836,751 58,100 7,646 8,965 (2,173) (1,572) 8,881 6,53924,03478,890 17,201 (2,079) 12,938
8,82516,471
(2,358)(4,531)
6,74615,627
EBITDA Add back: Share-based compensation1 Revaluation of investments (Denarius) 1 Loss from equity accounting in investee1 (Gain) loss on financial instruments1 Foreign exchange (gain) loss130,49621,105 72,032 1,147 (1,148) - - 3,241 1,095 10,810 (25,230) 2,343 (1,094)51,601106,950 60 - 2,127 (17,914) (439)
4591,606
10,02310,023
1,4274,668
(10,114)696
7,2379,580
Adjusted EBITDA39,52838,646 45,65578,17490,784

1. As presented in the Financial Statements and notes for the respective periods.

Adjusted net earnings and adjusted net earnings per share Three months ended, Six months ended,

($000s except shares amount) June 30, 2023 March 31, 2023 June 30, 2022 June 30, 2023 June 30, 2022 Basic weighted average shares outstanding 136,229,686 136,188,570 97,913,264 136,616,968 97,850,225 Diluted weighted average shares outstanding 140,289,533 136,188,570 108,125,857 141,236,861 109,022,012 Net earnings (loss)1 8,258 (5,401) 38,965 2,857 44,203 Add back: Share-based compensation1 459 1,147 (1,148) 1,606 60 Revaluation of investments (Aris Gold/Denarius) 1 10,023 - - 10,023 - (Income) loss from equity accounting in investee1 1,427 3,241 1,095 4,668 2,127 (Gain) loss on financial instruments1 (10,114) 10,810 (25,230) 696 (17,914) Foreign exchange (gain) loss1 7,237 2,343 (1,094) 9,580 (439) Income tax effect on adjustments (2,453) (964) (84) (3,417) (105) Adjusted net (loss) / earnings 14,837 11,176 12,504 26,013 27,932 Per share – basic ($/share) 0.11 0.08 0.13 0.19 0.29 1. As presented in the Interim Financial Statements and notes for the respective periods. TSX:ARIS aris-mining.co 6June 30, 2023March 31, 2023 June 30, 2022June 30, 2023June 30, 2022
136,229,686136,188,570 97,913,264 136,188,570 108,125,857 (5,401) 38,965 1,147 (1,148) - - 3,241 1,095 10,810 (25,230) 2,343 (1,094) (964) (84)136,616,96897,850,225 109,022,012 44,203 60 - 2,127 (17,914) (439) (105)
140,289,533141,236,861
8,2582,857
4591,606
10,02310,023
1,4274,668
(10,114)696
7,2379,580
(2,453)(3,417)
Adjusted net (loss) / earnings Per share – basic ($/share)14,83711,176 12,504 0.08 0.1326,01327,932 0.29
0.110.19
1. As presented in the Interim Financial Statements and notes for the respective periods. TSX:ARIS aris-mining.co 6

Qualified Person and Technical Information

Pamela De Mark, P.Geo., Senior Vice President, Technical Services of Aris Mining, is a Qualified Person as defined by National Instrument 43-101 (NI 43-101) and has reviewed and approved the technical information contained in this news release.

Scientific and technical information concerning the Marmato Mine is summarized, derived, or extracted from the technical report entitled "Technical Report for the Marmato Gold Mine, Caldas Department, Colombia, Pre-Feasibility Study of the Lower Mine Expansion Project" dated November 23, 2022 with an effective date of June 30, 2022, prepared by Ben Parsons, MAusIMM (CP), Anton Chan, Peng, Brian Prosser, PE, Joanna Poeck, SME-RM, Eric J. Olin, SME-RM, MAusIMM, Fredy Henriquez, SME, ISRM, David Hoekstra, PE, NCEES, SME-RM, Mark Allan Willow, CEM, SME-RM, Vladimir Ugorets, MMSA, Colleen Crystal, PE, GE, Kevin Gunesch, PE, Tommaso Roberto Raponi, P.Eng, David Bird, PG, SME-RM, and Pamela De Mark, P.Geo., each of whom is a "Qualified Person" as such term is defined in NI 43-101, and with the exception of Pamela De Mark of Aris Mining, are independent of the Company within the meaning of NI 43-101, and is available for review on the Company’s website at www.aris-mining.com and on the Company’s profile on SEDAR+ at www.sedarplus.ca.

Forward-Looking Information

This news release contains "forward-looking information" or forward-looking statements" within the meaning of Canadian securities legislation. All statements included herein, other than statements of historical fact, including, without limitation, statements relating to the construction of the Marmato Lower Mine and the advancement of the Soto Norte project and the details and timing thereof, the anticipated upswing in partner-operated mining operations, gold price assumptions, the updated 2023 production and AISC outlook for the Segovia Operations and the Marmato Upper Mine, statements and information under the headings “Full Year 2023 Outlook” and “Segovia Operations – Mid-year Outlook”, and the Company’s plans and strategies are forward-looking. Generally, the forward-looking information and forward looking statements can be identified by the use of forward looking terminology such as "plans", "expects" or "does not expect", "is expected", "budget", "scheduled", "estimates", "forecasts", "intends", "anticipates" or "does not anticipate", "will continue" or "believes", or variations of such words and phrases or state that certain actions, events or results "may", "could", "would", "might" or "will be taken", "occur" or "be achieved”. The material factors or assumptions used to develop forward looking information or statements are disclosed throughout this presentation.

Forward looking information and forward looking statements, while based on management's best estimates and assumptions, are subject to known and unknown risks, uncertainties and other factors that may cause the actual results, level of activity, performance or achievements of Aris Mining to be materially different from those expressed or implied by such forward-looking information or forward looking statements, including but not limited to those factors discussed in the section entitled "Risk Factors" in Aris Mining's annual information form dated March 31, 2023 and available on SEDAR+ at www.sedarplus.ca.

Although Aris Mining has attempted to identify important factors that could cause actual results to differ materially from those contained in forward-looking information and forward-looking statements, there may be other factors that cause results not to be as anticipated, estimated or intended. There can be no assurance that such information or statements will prove to be accurate, as actual results and future events could differ materially from those anticipated in such information or statements. The Company has and continues to disclose in its Management's Discussion and Analysis and other publicly filed documents, changes to material factors or assumptions underlying the forward-looking information and forward-looking statements and to the validity of the information, in the period the changes occur. The forward-looking statements and forward-looking information are made as of the date hereof and Aris Mining disclaims any obligation to update any such factors or to publicly announce the result of any revisions to any of the forward-looking statements or forward-looking information contained herein to reflect future results. Accordingly, readers should not place undue reliance on forward-looking statements and information.

This news release contains information that may constitute future-orientated financial information or financial outlook information (collectively, FOFI) about the Company’s prospective financial performance, financial position or cash flows, all of which is subject to the same assumptions, risk factors, limitations and qualifications as set forth above. Readers are cautioned that the assumptions used in the preparation of such information, although considered reasonable at the time of preparation, may prove to be imprecise or inaccurate and, as such, undue reliance should not be placed on FOFI. The Company’s actual results, performance and achievements could differ materially from those expressed in, or implied by, FOFI. The Company has included FOFI in order to provide readers with a more complete perspective on the Company’s future operations and management’s current expectations relating to the Company’s future performance. Readers are cautioned that such information may not be appropriate for other purposes. FOFI contained herein was made as of the date of this news release. Unless required by applicable laws, the Company does not undertake any obligation to publicly update or revise any FOFI statements, whether as a result of new information, future events or otherwise.

Source: Aris Mining Corporation