Sunday, September 20, 2026
MiningNewsTerminal
Sunday, September 20, 2026 Admin

NWI.CN ·

Nuinsco Announces 602.24 m Intersection of Continuous Critical Elements & Phosphate Mineralization at Prairie Lake Project

Exploration Programs

Nuinsco Announces 602.24m Intersection of Continuous Critical Elements & Phosphate 

Mineralization at Prairie Lake Project 

Toronto,  November  29,  2021  –  Nuinsco  Resources  Limited  (“Nuinsco”  or  the  “Company”)  (CSE:  NWI)  today 

announced receipt of analyses f rom diamond drill hole NP1003, r esulting in a continuous intersection of Critical 

Elements and Phosphate measuring 602.24m (from 2.76‐605m) in length in the SW Area of its 100%‐owned Prairie 

Lake project (the “Project”) near Terrace Bay, Ontario.  The intersection from DDH NP1003 continues the succession 

of intersections of exceptional length from the SW Area of the project. 

“The remarkable result of 602.24m  of mineralized rock obtained  from DDH NP1003, the longest intersection to 

date,  further  highlights  the  exceptional  opportunity  presented  b y  t h e  P r a i r i e  L a k e  P r o j e c t , ”  s a i d  P a u l  J o n e s ,  

Nuinsco’s CEO.  “A mineralized int ersection of this extent, wel l over a third of a mile long, with no indication that 

the mineral endowment is diminishing with depth speaks to the extraordinary potential scope of the project. As we 

have previously noted the combined intersections from the SW Area now define an extensive domain of rare earth 

element, niobium, tantalum, and phosphate mineralized rock that  is approximately one kilometre long and up to 

750m wide – only part of the much larger mineralized domain on  the project that remains to be fully evaluated.  

The project is a substantial asset to the Company”     

Analytical results from the 602.24m of continuous mineralizatio n from DDH NP1003, of niobium (Nb), tantalum 

(Ta),  phosphate  (P2O5),  and  rare  earth  elements  (REE)  including  lanthanum  (La),  ceriu m  ( C e ) ,  s a m a r i u m  ( S m ) ,  

neodymium (Nd), praseodymium (Pr), scandium (Sc), and yttrium (Y) are tabulated in the “Analytical Results” table 

2

below.    The  sampling  program  has  focussed  on  drill‐holes  collared  to  intercept  the  SW  area  which  currently 

measures 1km in total length a nd is between 150m and 750m wide  at surface. The SW area alone hosts 435‐530 

million tonnes of the total 515‐ 630 million tonne Prairie Lake  Project ET, with grades as t abulated in the “Prairie 

Lake ET” table below. 

Analytical Results DDH NP1003: 

Hole ID  From 

(m) 

To 

(m) 

Width 

(m) 

Rock 

Type* 

P2O5

(%) 

Nb2O5

(%) 

Ta2O5 

(%) 

Sc 

(g/t) 

(g/t) 

La  

(g/t) 

Ce  

(g/t) 

Pr 

(g/t) 

Nd 

(g/t) 

Sm 

(g/t) 

∑REE

(g/t) 

New intersections: 

NP1003 

40.45  93.2  52.75  CRBT/PYX  2.37  0.091  0.0026  22  63  390  896  107  4 11  63  1952 

147.5  181.7  34.2  PYX  1.63  0.197  0.0015  39  52  489  1188  143  533  7 6  2520 

260.25  266  5.75  PYX  1.23  0.231  0.0018  33  53  341  808  103  395  60  1794 

274.8  299  24.2  PYX  2.37  0.179  0.0032  25  45  242  570  71  277  46  12 76 

397.5  410.6  13.1  PYX  1.98  0.115  0.0012  36  46  142  343  48  209  42  866 

601  605  4  IJ  1.48  0.028  0.0016  2  123  120  277  38  169  40  769 

Combined extended intersections: 

NP1003  2.76  605  602.24  ‐‐  3.15  0.131  0.0017  15  71  304  731  90  35 2  59  1621 

*Principal rock type: CRBT=carbonatite, SILCARB = silicocarbonatite, IJ= ijolite, PYX = pyroxenite   

The mineralization of economic interest contained within the Pr airie Lake intrusion occurs at surface and extends 

to unknown depths below the deepest drilling yet conducted (cir ca 525m vertically). There is no indication that 

mineralization diminishes with depth and the intersections from  the Program reported to date occur in a domain 

that presently extends 1000m, oriented southeast‐northwest, in the Southwest (“SW”) Area (see map above). The 

Prairie Lake complex hosts a suite of elements of economic inte rest identified as Critical Elements defined under 

the Canadian Minerals and Metals Plan (“CMMP”) contained within the very large domain of mineralized rock that 

is  extremely  favourably  located  from  a  logistical  perspective  with  rail,  road,  shipping,  and  power  infrastructure 

already established.  Prairie Lake hosts a number of elements and compounds of economic interest including those 

for which demand is projected to substantially increase and for which secure supply chains are sought. 

The Prairie Lake project consists of 46 mineral claims covering  an area of ~630 ha. Prairie Lake is superbly located, 

easily accessed by an all‐weather road from the TransCanada Hig hway located 28 kilometres to the south. The ET 

is defined by 59 diamond drill holes. 

All samples were analysed by Activation Laboratories (ActLabs)  in Ancaster, Ontario. Samples were analysed for a 

whole rock and trace element ICP analytical package as well as  for niobium, tantalum, and zirconium oxides using 

a fusion XRF method. An internal Quality Control Quality Assura nce (QAQC) program was implemented with four 

QAQC samples (blanks and reference standards) added into the sampling stream. 

Prairie Lake Drilling & Trenching by Target Area1: 

1 Trench lengths are calculated as cumulative length of samples along trench. 

   S W   Jim's Showing  East  NE  Other 

Areas  Total 

Historic Drill Holes 

(1969‐1983) 

Drill Holes  16  11 1 0  17 45

Metres  1351.7 938.4 34.1 0  1528.5 3852.7

Drill Holes (2007‐

2010) 

Drill Holes  21  10 0 0  1  32

Metres  6632  1692.4 0 0  101 8425.4

Trenches (2010)  Trenching  1  0 2 2  0  5

Metres  377.7 0 433.0 754.55  0  1562.2

3

Prairie Lake ET2: 

2 A full description of methodology used to estimate the Prairie Lake Project Exploration Target is contained in the Technical Report dated 30 

November 2018 prepared by P&E Mining Consultants Inc. that is filed on SEDAR.  The potential quantity and grade of the ET is conceptual in 

nature and there has been insufficient exploration to define a mineral resource. It is uncertain if further exploration will result in the discovery 

o f  a  m i n e r a l  r e s o u r c e .  T h e r e  i s  n o  N a t i o n a l  I n s t r u m e n t  4 3 ‐ 1 0 1  –  Standards  of  Disclosure  for  Mineral  Projects  preliminary  economic 

assessment in respect of the Prairie Lake ET. 

Laura Giroux, P.Geo, Chief Geologist, acts as Nuinsco's Qualifi ed  Person under National Instrument 43‐101. Ms. 

Giroux has reviewed and approved the technical contents of this news release.  

About Nuinsco Resources Limited 

Nuinsco Resources has over 50 years of exploration success and  is a growth‐oriented, multi‐commodity mineral 

exploration  and  development  company  focused  on  prospective  oppo rtunities  in  Canada  and  internationally. 

Currently the Company has four properties in Ontario – the high ‐grade Sunbeam gold property near Atikokan, the 

Dash Lake gold property near Terrace Bay, the large multi‐commodity (rare‐earths, niobium, tantalum, phosphate) 

Prairie Lake project near Terrace Bay, and the Zig Zag Lake property (lithium, tantalum) near Armstrong. In addition, 

Nuinsco has an agreement for gold exploitation at the El Sid project in the Eastern Desert of Egypt. 

 Forward‐Looking Statements 

This  news  release  contains  certain  "forward‐looking  statements."  All  statements,  other  than  statements  of  historic  fact,  that address  activities,  events  or 

developments that Nuinsco believes, expects or anticipates will  or may occur in the future are forward‐looking statements. For ward‐looking statements are 

often, but not always, identified by the use of words such as " seek," "anticipate," "believe," "plan," "estimate, “expect," an d "intend" and statements that an 

event or result "may," "will," "can," "should," "could," or "might" occur or be achieved and other similar expressions. These forward‐looking statements reflect 

the current expectations or beliefs of Nuinsco based on information currently available to Nuinsco. Forward‐looking statements are subject to a number of risks 

and uncertainties that may cause the actual results of Nuinsco  to differ materially from those discussed in the forward‐lookin g statements, and even if such 

actual results are realized or substantially realized, there can be no assurance that they will have the expected consequences to, or effects on Nuinsco. Factors 

that could cause actual results or events to differ materially from current expectations include, among other things, failure to successfully complete financings, 

capital and other costs varying significantly from estimates, p roduction rates varying from estimates, changes in world copper  and/or gold markets, changes 

in equity markets, uncertainties relating to the availability a nd costs of financing needed in the future, equipment failure,  unexpected geological conditions, 

imprecision in resource estimates, success of future developmen t initiatives, competition, operating performance of facilities , environmental and safety risks, 

delays in obtaining or failure to obtain tenure to properties and/or necessary permits and approvals, and other development and operating risks. Any forward‐

looking statement speaks only as of the date on which it is mad e and, except as may be required by applicable securities laws,  Nuinsco disclaims any intent or 

obligation to update any forward‐looking statement, whether as  a result of new information, future events or results or otherw ise. Although Nuinsco believes 

that the assumptions inherent in the forward‐looking statements  are reasonable, forward‐looking statements are not guarantees  of future performance and 

accordingly undue reliance should not be put on such statements due to the inherent uncertainty therein. 

  SW  Jim's Showing  East  NE  Total 

REEs    

La (ppm) Lanthanum  275 ‐ 340 295 ‐ 360 305 ‐ 370 200 ‐ 250  280 ‐ 340

Ce (ppm) Cerium  650 ‐ 790 670 ‐ 820 670 ‐ 820 450 ‐ 550  650 ‐ 790

Sm (ppm) Samarium  55 ‐ 70 55 ‐ 70 55 ‐ 70 50 ‐ 60  55 ‐ 70

Nd (ppm) Neodymium  295 ‐ 360 290 ‐ 360 320 ‐ 390 235 ‐ 290  300 ‐ 360

Y (ppm) Yttrium  85 ‐ 100 90 ‐ 110 80 ‐ 100 135 ‐ 170  85 ‐ 100

La+Ce+Sm+Nd+Y (ppm)  1360 ‐ 1660 1400 ‐ 1720 1430 ‐ 1750 1070 ‐ 1320  1370 ‐ 1660

Additional Elements (as oxides)    

P2O5 (%) Phosphate  3.0 ‐ 4.0  3.5 ‐ 4.5  2.5 ‐ 3.0  2.5 ‐ 3.5  3.0 ‐ 4.0 

Nb2O5 (%) Niobium  0.095 ‐ 0.115  0.100 ‐ 0.120  0.040 ‐ 0.050  0.085 ‐ 0.105  0.090 ‐  0.110 

Ta2O5 (ppm) Tantalum  18 ‐ 25  25 ‐ 30  5 ‐ 7  10 ‐ 12  18 ‐ 21 

Volume ‐ m3 (million)  140 ‐ 175 12 ‐ 14 13 ‐ 16 2 ‐ 3  170 ‐ 210

Tonnes (million)  435 ‐ 530  35 ‐ 45  40 ‐ 50  7 ‐ 8  515 ‐ 630 

To learn more, please visit www.nuinsco.ca or contact:    

Paul Jones, CEO  Sean Stokes, Executive VP  Cathy Hume, Consultant  Instagram: 

@nuinscoresources 

[email protected]   [email protected]    [email protected] 

Twitter: 

@NWIResources