Silvercorp Reports Net Income of $15.5 Million, $0.09 per Share, and Cash Flow from Operations of $30.1 Million for Q1 Fiscal 2021

Financials

NEWS RELEASE  Trading Symbol:  TSX/NYSE American: SVM  NYSE AMERICAN: SVM

SILVERCORP REPORTS NET INCOME OF $15.5 MILLION, $0.09 PER SHARE, AND CASH FLOW FROM OPERATIONS OF $30.1 MILLION FOR Q1 FISCAL 2021

VANCOUVER, British Columbia – August 6, 2020 – Silvercorp Metals Inc. (“Silvercorp” or the “Company”) (TSX/NYSE American: SVM) reported its financial and operating results for the first quarter ended June 30, 2020 (“Q1 Fiscal 2021”). All amounts are expressed in US Dollars.

Q1 FISCAL YEAR 2021 HIGHLIGHTS   

  • Mined 254,555 tonnes of ore, down 1% compared to the prior year quarter;
  • Sold approximately 1.9 million ounces of silver, 1,100 ounces of gold, 20.9 million pounds of lead, and 7.0 million pounds of zinc, representing an increase of 1%, 10%, and 17% in silver, gold and lead sold, and a decrease of 5% in zinc sold, compared to the prior year quarter;
  • Revenue of $46.7 million, up 2% or $1.1 million compared to $45.6 million in the prior year quarter;
  • Net income attributable to equity shareholders of $15.5 million, or $0.09 per share, compared to $12.6 million or $0.07 per share in the prior year quarter;
  • Cash cost per ounce of silver1, net of by‐product credits, of negative $1.48, compared to negative $2.17 in the prior year quarter;
  • All‐in sustaining cost per ounce of silver1, net of by‐product credits, of $5.61, compared to $5.69 in the prior year quarter;
  • Cash flow from operations of $30.1 million, compared to $19.9 million in the prior year quarter;
  • Gain of $16.4 million on equity investments;
  • Receipt of $6.5 million (CAD$9.0 million) break fee from Guyana Goldfields Inc.;
  • Paid dividends of $2.2 million, or $0.0125 per share, to equity shareholders;
  • Invested $5.8 million in New Pacific Metals Corp. (“NUAG”) to maintain the Company’s ownership interest at 28.8%;
  • Strong balance sheet with $178.4 million in cash and cash equivalents and short‐term investments, an increase of $35.9 million or 25% compared to March 31, 2020; and,
  • Investment in NUAG with market value of $178.2 million and other investments of $7.4 million.

FINANCIALS 

Net income attributable to equity shareholders of the Company in Q1 Fiscal 2021 was $15.5 million, or $0.09 per share, compared to $12.6 million, or $0.07 per share in the three months ended June 30, 2019 (“Q1 Fiscal 2020”).

1 Alternative performance (non‐IFRS) measure. Please refer to section 10 of the corresponding MD&A for reconciliation.

The Company’s financial results in Q1 Fiscal 2021  were mainly impacted by the following: i) an increase of 1%, 10% and 17% in the amount of silver, gold, and lead  sold, respectively; offset by a 5% decrease in the amount of zinc sold; ii) an increase of 10% and 24% in the net realized selling prices for silver and gold, offset by a decrease of 19% and 14% in the net realized selling prices for lead and zinc; iii) gain of $16.4 million on equity investments, of which $5.5 million was reported in profit and $10.9 million was reported in other comprehensive income; offset by a $1.8 million increase in foreign exchange loss; and iv) a $5.9 million increase in income tax expenses.

Revenue in Q1 Fiscal 2021 was $46.7 million, up 2% or $1.1 million compared to $45.6 million in the prior year quarter. The increase was mainly due to i) an increase of $2.4 million in revenue arising from the increase in the amount of silver, gold and lead sold; ii) an increase of $2.7 million in revenue arising from the increase in net realized selling prices for silver and gold; offset by iii) a decrease of $3.6 million in revenue arising from the decrease in net realized selling price for lead and zinc; and iv) a decrease of $0.2 million in revenue due to less zinc sold. Silver, gold and base metal sales represented $26.2 million, $1.5 million, and $19.0 million, respectively, compared to silver, gold and base metals sales of $23.6 million, $1.1  million,  and  $20.9  million,  respectively,  in  the  prior  year  quarter.  Revenue  from  the  Ying  Mining District in Q1 Fiscal 2021 was $39.7 million, up 5% compared to $37.8 million in the prior year quarter. Revenue from the GC Mine in Q1 Fiscal 2021 was $7.0 million, down 10% compared to $7.8 million in the prior year quarter.

Production  costs  expensed in Q1 Fiscal 2021 were $17.7 million, a slight decrease compared to $18.0 million in Q1 Fiscal 2020. The production costs expensed represent approximately 264,680 tonnes of ore processed and expensed at a cost of $67.05 per tonne, compared to approximately 261,440 tonnes at $68.85 per tonne in Q1 Fiscal 2020.

Mineral resource taxes in Q1 Fiscal 2021 were $1.34 million, up 7% compared to $1.25 million in Q1 Fiscal 2020, and the increase was mainly due to higher revenue.

Government fees and other taxes in Q1 Fiscal 2021 were $0.5 million, compared to $0.6 million in Q1 Fiscal 2020.  Government fees and other taxes are comprised of environmental protection fees, surtaxes on VAT, land usage levies, stamp duties and other miscellaneous levies, duties and taxes imposed by the state and local Chinese governments.

Income from mine operations in Q1 Fiscal 2021 was $19.3 million, or 41% of revenue, compared to $17.7 million or 39% of revenue in Q1 Fiscal 2020. Income from mine operations at the Ying Mining District was $17.6 million or 44% of revenue, compared to $16.0 million or 42% of revenue in Q1 Fiscal 2020. Income from mine operations at the GC Mine was $1.8 million or 26% of revenue, compared to $1.8 million or 23% of revenue in Q1 Fiscal 2020.

General  and administrative  expenses in Q1 Fiscal 2021 were $4.7 million, an increase of $0.2 million compared to $4.5 million in Q1 Fiscal 2020. The increase was mainly due to an increase of $0.4 million in share‐based  compensation  offset  by  a  decrease  of  $0.2  million  in  salaries  and  benefits.  General  and administrative expenses include corporate administrative expenses of $2.7 million (Q1 Fiscal 2020 ‐ $2.4 million) and mine administrative expenses of $2.1 million (Q1 Fiscal 2020 ‐ $2.1 million).

Foreign exchange loss in Q1 Fiscal 2021 was $2.7 million, an increase of $1.8 million compared to $0.9 million in Q1 Fiscal 2020.  The foreign exchange loss is mainly driven by the appreciation of Canadian dollar against US dollar.

Property  evaluation  and  business  development  expenses  in  Q1  Fiscal  2021  were  a  recovery  of  $3.8 million,  compared  to  an  expense  of  $0.1  million  in  Q1  Fiscal  2020.  On  April  26,  2020,  the  Company entered  into  a  definitive  agreement  with  Guyana  Goldfields  Inc.  (“Guyana  Goldfields”),  subsequently amended on May 18, 2020 (collectively, the “Arrangement Agreement”) to acquire all of the issued and outstanding  shares  of  Guyana  Goldfields.  On  June  10,  2020,  Guyana  Goldfield  terminated  the Arrangement  Agreement  and  paid  the  Company  a  break  fee  of  $6.5  million  (CAD$9.0  million).  Net  of expenses of $2.5 million, a gain of $4.0 million on this transaction was recorded as a recovery of property evaluation and business development expenses.

Gain on equity investments recorded in profit in Q1 Fiscal 2021 was $5.5 million, compared to $nil in Q1 Fiscal 2020. A total gain of $16.4 million on equity investments was reported in the current quarter, of which $10.9  million  was  recorded  in  other  comprehensive  income  as  the Company  made  elections  to account for equity investments on an instrument‐by‐instrument basis.

Income  tax  expenses  in  Q1 Fiscal  2021  was  $5.4  million, an increase  of $5.9 million, compared to an income tax recovery of $0.5 million in Q1 Fiscal 2020. In Q1 Fiscal 2021, the Company recorded current income tax expenses of $4.6 million (Q1 Fiscal 2020 – $1.8 million), and deferred income tax expenses of $0.8  million  (Q1  Fiscal  2020  –  deferred  income  tax  recovery  of  $2.2  million).  The  current  income  tax expenses in Q1 Fiscal 2020 included withholding tax expenses of $1.1 million, which was paid at a rate of 10% on dividends distributed out of China. The deferred income tax recovery in Q1 Fiscal 2020 was mainly related to the tax benefit recognized arising from the disposal of the XHP Project.

Cash flow provided by operating activities in Q1 Fiscal 2021 was $30.1 million, up $10.2 million or 51%, compared to $19.9 million in Q1 Fiscal 2020.

The  Company  ended  the  quarter  with  $178.4  million  in  cash,  cash  equivalents  and  short‐term investments, an increase of $35.9 million or 25%, compared to $142.5 million as at March 31, 2020.

Working capital as at June 30, 2020 was $153.7 million, an increase of $23.4 million or 18%, compared to $130.4 million as at March 31, 2020.

OPERATIONS AND DEVELOPMENT  

In Q1 Fiscal 2021, on a consolidated basis, the Company mined 254,555 tonnes of ore, a slight decrease of 1% or 2,837 tonnes compared to 257,392 tonnes in Q1 Fiscal 2020. Ore milled was 262,326 tonnes, a slight increase of 1% or 2,784 tonnes, compared to 259,542 tonnes in Q1 Fiscal 2020.

The Company sold approximately 1.9 million ounces of silver, 1,100 ounces of gold, 20.9 million pounds of lead, and 7.0 million pounds of zinc, compared to 1.9 million ounces of silver, 1,000 ounces of gold, 17.8 million pounds of lead, and 7.3 million pounds of zinc in Q1 Fiscal 2020.

In Q1 Fiscal 2021, the consolidated total mining and cash mining costs were $73.91 and $54.97 per tonne, down 5% and 1% compared to $77.40 and $55.45 per tonne, respectively, in Q1 Fiscal 2020. The decrease in cash mining costs was mainly due to a decrease of $3.70 per tonne in the cash mining costs at the GC mine, offset by an increase of $1.07 per tonne in the cash mining costs at the Ying Mining District.

The consolidated total milling and cash milling costs in Q1 Fiscal 2021 were $11.04 and $9.58 per tonne, down  12%  and  10%  compared  to  $12.49  and  $10.63  per  tonne,  respectively,  in  Q1  Fiscal  2020.  The decrease in per tonne cash milling costs was mainly due to a decrease of $0.2 million in labour costs.

Correspondingly, the consolidated cash production cost per tonne of ore processed in Q1 Fiscal 2021 was $67.05, down 3% compared to $68.85 in Q1 Fiscal 2020. The consolidated all‐in sustaining production costs per tonne of ore processed was $112.59, down 6% compared to $120.16 in Q1 Fiscal 2020. The decrease was mainly due to the lower per tonne production costs as discussed above and a $1.6 million decrease in sustaining capital expenditures.

In Q1 Fiscal 2021, the consolidated cash cost per ounce of silver, net of by‐product credits, was negative $1.48, compared to negative $2.17, in Q1 Fiscal 2020.  The increase in cash cost per ounce of silver, net of by‐product credits, was mainly due to a decrease of $1.5 million in by‐product sales.

In Q1 Fiscal 2021, the consolidated all‐in sustaining cost per ounce of silver, net of by‐product credits, was $5.61 compared to $5.69 in Q1 Fiscal 2020.  The decrease was mainly due to i) a $1.6 million decrease in sustaining capital expenditures, offset by ii) the increase in cash cost per ounce of silver, net of by‐product credits as discussed above.

1. Ying Mining District, Henan Province, China  

Ying Mining DistrictQ1 2021 Q4 2020 Q3 2020 Q2 2020 Q1 2020 June 30, 2020 March 31, 2020 December 31, 2019 September 30, 2019 June 30, 2019
Ore Mined (tonne) Ore Milled (tonne)174,17669,379 176,149 176,085 176,584 69,188 175,488 179,147 177,681
177,689
Head Grades Silver (gram/tonne) Lead (%) Zinc (%)297 296 306 330 4.6 4.6 4.5 4.6 1.0 0.9 0.8 0.9
293
4.6
0.8
Recoveries Silver (%) Lead (%) Zinc (%)95.3 96.1 96.2 95.8 95.7 96.3 95.7 95.9 67.7 70.3 58.6 58.3
94.7
96.2
63.8
Metal Sales Silver (in thousands of ounce) Gold (in thousands of ounce) Lead (in thousands of pound) Zinc (in thousands of pound)711 1,475 1,711 1,662 0.5 0.7 1.1 1.0 8,322 14,912 16,389 14,835 865 2,882 1,428 2,090
1,672
1.1
17,779
2,037
Cash mining cost ($/tonne) Shipping costs ($/tonne) Cash milling costs ($/tonne)64.1268.10 64.69 59.26 63.05 3.96 3.89 3.82 4.04 11.53 10.99 9.81 9.15
3.64
8.45
Cash production costs ($/tonne) All‐in sustaining production costs ($/tonne) Cash costs per ounce of silver ($) All‐in sustaining costs per ounce of silver ($)76.2183.59 79.57 72.89 76.24 195.78 126.43 117.37 129.41 0.30 (0.72) (1.95) (1.44) 11.86 5.57 3.40 4.82
116.99
(0.87) 4.14

In Q1 Fiscal 2021, the total ore mined at the Ying Mining District was 174,176 tonnes, a slight decrease of 1% or 2,408 tonnes compared to 176,584 tonnes mined in the prior year quarter.  Ore milled was 177,689 tonnes, comparable to 177,681 tonnes in Q1 Fiscal 2020.

Head grades were 293 grams per tonne (“g/t”) for silver, 4.6% for lead, and 0.8% for zinc, compared to 330 g/t for silver, 4.6% for lead, and 0.9% for zinc in the prior year quarter. The variation in silver head grade  is  mainly  related  to  the  Company’s  planned  mining  sequence  and  is  in  line  with  Fiscal  2021 Guidance (defined below).

In Q1 Fiscal 2021, the Ying Mining District sold approximately 1.7 million ounces of silver, 17.8 million pounds of  lead, and 2.0  million pounds  of zinc, compared to  1.7 million  ounces  of silver, 14.8 million pounds of lead, and 2.1 million pounds of zinc in the prior year quarter.

Total  and  cash  mining  costs  per  tonne  at  the  Ying  Mining  District  in  Q1  Fiscal  2021  were  $87.94  and $64.12 per tonne, respectively, compared to $91.47 and $63.05 per tonne in the prior year quarter. The increase in the per tonne cash mining cost was mainly due to a 2% increase in mining preparation costs.

Total and cash milling costs per tonne at the Ying Mining District in Q1 Fiscal 2021 were $10.04 and $8.45, respectively, compared to $10.93 and $9.15 in Q1 Fiscal 2020. The decrease in per tonne milling costs was mainly due to a decrease of $0.39 per tonne in labour costs and a decrease of $0.23 per tonne in utility costs.

Correspondingly, the cash production cost per tonne of ore processed in Q1 Fiscal 2021 at the Ying Mining District was $76.21, compared to $76.24 in the prior year quarter.  The all‐in sustaining production cost per tonne of ore processed was $116.99, down 9% compared to $129.14 in Q1 Fiscal 2020. The decrease was mainly due to a $2.0 million decrease in sustaining capital expenditures.

Cash cost per ounce of silver, net of by‐product credits, in Q1 Fiscal 2021 at the Ying Mining District, was negative $0.87 compared to negative $1.44 in the prior year quarter. The increase was mainly due to a $0.5 million decrease in by‐product sales resulting from a decrease in the net realized selling prices of lead and zinc.

All‐in sustaining cost per ounce of silver, net of by‐product credits, in Q1 Fiscal 2021 at the Ying Mining District was $4.14 compared to $4.82 in Q1 Fiscal 2020. The decrease was mainly due to a $2.0 million decrease in sustaining capital expenditures.

In Q1 Fiscal 2021, approximately 28,485 metres or $0.8 million worth of diamond drilling (Q1 Fiscal 2020 – 23,648 metres or $0.6 million) and 6,207 metres or $1.8 million worth of preparation tunnelling (Q1 Fiscal 2020 – 6,395 metres or $1.7 million) were completed and expensed as mining preparation costs at the Ying Mining District. In addition, approximately 23,108 metres or $7.8 million worth of horizontal tunnels, raises,  ramps  and  declines  (Q1  Fiscal  2020  –  20,895  metres  or  $7.1  million)  were  completed  and capitalized.

2. GC Mine, Guangdong Province, China 

GC MineQ1 2021 Q4 2020 Q3 2020 Q2 2020 Q1 2020 June 30, 2020 March 31, 2020 December 31, 2019 September 30, 2019 June 30, 2019
Ore Mined (tonne) Ore Milled (tonne)80,37937,216 86,437 83,172 80,808 33,243 89,372 86,134 81,861
84,637
Head Grades Silver (gram/tonne) Lead (%) Zinc (%)94 96 100 95 1.8 2.0 2.0 1.9 3.5 3.3 3.2 3.4
93
1.9
3.4
Recovery Rates Silver (%) Lead (%) Zinc (%)80.7 78.0 75.9 76.8 90.4 90.4 88.3 88.7 87.7 85.5 86.1 85.7
82.8
89.8
87.3
Metal Sales Silver (in thousands of ounce) Lead (in thousands of pound) Zinc (in thousands of pound)89 234 183 193 1,332 3,867 2,680 3,007 2,194 5,471 5,227 5,244
200
3,106
4,921
Cash mining cost ($/tonne) Cash milling cost ($/tonne)35.1325.58 42.96 37.80 38.83 16.36 14.01 12.72 13.85
11.95
Cash production cost ($/tonne) All‐in sustaining production costs ($/tonne) Cash cost per ounce of silver ($) All‐in sustaining cost per ounce of silver ($)47.0841.94 56.97 50.52 52.68 88.18 71.03 62.94 67.33 (10.03) (4.33) (9.98) (8.38) 8.31 2.18 (2.89) (0.96)
65.84
(6.59)
2.41

In Q1 Fiscal 2021, the total ore mined at the GC Mine was 80,379 tonnes, a slight decrease compared to 80,808  tonnes  in  Q1  Fiscal  2020.  Ore  milled  was  84,637  tonnes,  an  increase  of  3%  or  2,776  tonnes compared to 81,861 tonnes in Q1 Fiscal 2020.

Average head grades of ore processed at the GC Mine were 93 g/t for silver, 1.9% for lead, and 3.4% for zinc, compared to 95 g/t for silver, 1.9% for lead, and 3.4% for zinc in Q1 Fiscal 2020.  Recovery rates of ore processed were 82.8% for silver, 89.8% for lead, and 87.3% for zinc, compared to 76.8% for silver, 88.7% for lead, and 85.7% for zinc in Q1 Fiscal 2020.

In Q1 Fiscal 2021, GC Mine sold approximately 200,000 ounces of silver, 3.1 million pounds of lead, and 4.9 million pounds of zinc, compared to 193,000 ounces  of silver, 3.0  million pounds  of lead, and  5.2 million pounds of zinc in Q1 Fiscal 2020.

Total and cash mining costs per tonne at the GC Mine in Q1 Fiscal 2021 were $43.50 and $35.13 per tonne, a decrease of 7% and 10%, respectively, compared to $46.64 and $38.83 per tonne, respectively, in Q1 Fiscal 2020. The decrease in the cash mining cost was mainly due to a $0.7 million decrease in mining preparation costs. Total and cash milling cost per tonne at the GC Mine in Q1 Fiscal 2021 were $13.14 and $11.95, a decrease of 17% and 14%, respectively, compared to $15.88 and $13.85, respectively, in Q1 Fiscal 2020. The decrease in cash milling costs was mainly due to a $0.1 million decrease in labour costs.

Correspondingly, the cash production cost per tonne of ore processed in Q1 Fiscal 2021 at the GC Mine was $47.08, a decrease of 11% compared to $52.68 in Q1 Fiscal 2020.  The all‐in sustaining production costs per tonne of ore processed was $65.84, down 2% compared to $67.33 in Q1 Fiscal 2020.

Cash cost per ounce of silver, net of by‐product credits, at the GC Mine, was negative $6.59 compared to negative $8.38 in Q1 Fiscal 2020. The increase was mainly due to a $1.0 million decrease in by‐product sales resulting from a decrease in the net realized selling prices of lead and zinc.

All‐in sustaining cost per ounce of silver, net of by‐product credits, in Q1 Fiscal 2021 at the GC Mine was $2.41 compared to negative $0.96 in Q1 Fiscal 2020. The increase was mainly due to i) the increase in cash cost per ounce of silver, net of by‐product credits, as discussed above, and ii) a $0.3 million increase in sustaining capital expenditures.

In Q1 Fiscal 2021, approximately 8,212 metres or $0.3 million worth of underground diamond drilling (Q1 Fiscal 2020 – 7,970 metres or $0.3 million) and 3,458 metres or $0.8 million worth of tunnelling (Q1 Fiscal 2020 – 6,261 metres or $1.4 million) were completed and expensed as mining preparation costs at the GC Mine. In addition, approximately 3,267 metres or $1.2 million worth of horizontal tunnels, raises, ramps and declines (Q1 Fiscal 2020 – 497 metres or $0.3 million) were completed and capitalized.

3. Annual Operating Outlook 

All references to Fiscal 2021 Guidance in this news release refers to the “Fiscal 2021 Production, Cash Cost Guidance”  section  in  the  Company’s  Fiscal  2020  Annual  MD&A  dated  May  20,  2020  (“Fiscal  2021 Guidance”) filed under the Company’s profile at www.sedar.com.

(i) Production and Production Costs

The following table summarizes the Q1 Fiscal 2021 production and production costs achieved compared to the respective Fiscal 2021 Guidance:

Ore processed (tonnes)Head gradesMetal productionProduction costs
Silver (g/t)Lead (%)Zinc (%)Silver (Koz)Lead (Klbs)Zinc (Klbs)Cash cost ($/t)AISC ($/t)
Q1 Fiscal 2021 Actual Results
Ying Mining District177,6892934.60.81,54416,9411,92076.21116.99
GC Mine84,637931.93.42093,1355,61347.0865.84
Consolidated262,3262283.71.61,75320,0767,53367.05112.59

Fiscal 2021 Guidance

Ying Mining District 640,000 ‐ 660,0002924.30.95,600‐5,800 56,600‐58,0007,000‐8,000 74.7‐82.5 133.5 ‐ 140.5
GC Mine290,000 ‐ 310,000961.73.3600‐700 9,500‐10,500 17,500‐18,70052.2‐57.578.5 ‐ 82.9
Consolidated930,000 ‐ 970,000 229‐231 3.5‐3.5 1.6‐1.76,200‐6,500 66,100‐68,500 24,500‐26,70066.6‐73.6122.6‐135.5

% of Fiscal 2021 Guidance*

Ying Mining District27%100%107%89%27%30%26%97%85%
GC Mine28%97%112%103%32%31%31%86%82%
Consolidated28%99%106%97%28%30%29%96%87%
  • Percentage caculated based on mid‐point of the related Fiscal 2021 Guidance

Based on year‐to‐date production, production costs and the expected production for the remainder of the year, the Company reaffirms its Fiscal 2021 Guidance.

(ii) Development and Capital Expenditures

The  following  table  summarizes  the  Q1  Fiscal  2021  development  work  and  capitalized  expenditures compared to the respective Fiscal 2021 Guidance.

Capitalized Development and Expenditures
Ramp DevelopmentExploration and Development TunnelsEquipment & FacilitiesTotal
(Metres)($ Thousand)(Metres)($ Thousand)($ Thousand)(Metres)($ Thousand)
Q1 Fiscal 2021 Actual Results
Ying Mining District2,218 $ 1,71120,890 $ 6,110 $ 1,03823,108 $ 8,859
GC Mine309256 2,958 912193 3,267 1,361
Consolidated2,527 $ 1,96723,848 $ 7,022 $ 1,23126,375 $ 10,220

Fiscal 2021 Guidance

Ying Mining District6,700 $ 5,50081,300 $ 26,900 $ 4,60088,000 $ 37,000
GC Mine1,6001,400 11,000 3,200800 12,600 5,400
Consolidated8,300 $ 6,90092,300 $ 30,100 $ 5,400100,600 $ 42,400

% of Fiscal 2021 Guidance

Ying Mining District33%31%26%23%23%26%24%
GC Mine19%18%27%29%24%26%25%
Consolidated30%29%26%23%23%26%24%

Based on year‐to‐date capital expenditures and the expected capital expenditures for the remainder of the year (save for the capital expenditures to be incurred to build an aggregate plant as described below, which was not included in the Company’s Fiscal 2021 Guidance), the Company reaffirms the Fiscal 2021 Guidance.

The Company is investing  approximately $2.9 million (approximately RMB¥20.0  million) to construct a 1,000,000  tonnes  per  year  aggregate  plant  to  crush  and  recycle  the  waste  rock  from  the  Ying  Mining District with the goal of supplying the resulting products to the local construction market. The plant is expected  to  be  commissioned  in  October  2020,  and  its  profits,  after  capital  recovery,  will  be  shared between the local government, the local communities, and employees. This investment demonstrates our ongoing  commitment  and  efforts  to  minimize  our  operations’  impacts  on  the  environment  and  our commitment to create a sustainable contribution to the communities where our people work and live.

(iii) Ongoing Exploration Programs

The Company is currently undertaking extensive drill programs at the Ying and GC Mines with two main objectives: i) areas with existing development and access are being re‐examined to define more resources and reserves, which may lead to a substantial reduction in mining and sustaining capital costs associated with the tonnes identified, and ii) areas which may have been overlooked for potential gold mineralization are being tested for different alteration styles from the typical silver‐lead zones.

Mr. Guoliang Ma, P.Geo., Manager of Exploration and Resources of the Company, is the Qualified Person as defined by National Instrument 43‐101 – Standards of Disclosure for Mineral Projects and has reviewed and given consent to the technical information contained in this news release.

This earnings release should be read in conjunction with the Company's Management Discussion &
Analysis, Financial Statements and Notes to Financial Statements for the corresponding period, which have
been posted on SEDAR under the Company’s profile atand are also available on the
Company's website atwww.silvercorp.ca.

About Silvercorp  

Silvercorp is a profitable Canadian mining company producing silver, lead and zinc metals in concentrates from  mines  in  China.  The  Company’s  goal  is  to  continuously  create  healthy  returns  to  shareholders through  efficient  management,  organic  growth  and  the  acquisition  of  profitable  projects.  Silvercorp balances  profitability,  social  and  environmental  relationships,  employees’  wellbeing,  and  sustainable development. For more information, please visit our website at www.silvercorp.ca.

For further information

Silvercorp Metals Inc.

Lon Shaver Vice President Phone: (604) 669‐9397 Toll Free 1(888) 224‐1881 Email: [email protected] Website: www.silvercorp.ca

CAUTIONARY DISCLAIMER ‐ FORWARD‐LOOKING STATEMENTS 

Certain of the statements and information in this news release constitute “forward‐looking statements” within the  meaning  of  the  United  States  Private  Securities  Litigation  Reform  Act  of  1995  and  “forward‐looking  information”  within the meaning of applicable Canadian provincial securities laws (collectively, “forward‐looking statements”). Any  statements or information that express or involve discussions with respect to predictions, expectations, beliefs, plans,  projections, objectives, assumptions or future events or performance (often, but not always, using words or phrases  such  as  “expects”,  “is  expected”,  “anticipates”,  “believes”,  “plans”,  “projects”,  “estimates”,  “assumes”,  “intends”,  “strategies”, “targets”, “goals”, “forecasts”, “objectives”, “budgets”, “schedules”, “potential” or variations thereof or  stating  that  certain  actions,  events  or  results  “may”,  “could”,  “would”,  “might”  or  “will”  be  taken,  occur  or  be  achieved, or the negative of any of these terms and similar expressions) are not statements of historical fact and may  be forward‐looking statements.  Forward‐looking statements relate to, among other things: the price of silver and  other metals; the accuracy of mineral resource and mineral reserve estimates at the Company’s material properties;  the sufficiency of the Company’s capital to finance the Company’s operations; estimates of the Company’s revenues  and  capital  expenditures;  estimated  production  from  the  Company’s  mines  in  the  Ying  Mining  District  and  the  GC  Mine;  timing  of  receipt  of  permits  and  regulatory  approvals;  availability  of  funds  from  production  to  finance  the  Company’s operations; and access to and availability of funding for future construction, use of proceeds from any  financing and development of the Company’s properties. 

Forward‐looking statements are subject to a variety of known and unknown risks, uncertainties and other factors that  could  cause  actual  events  or  results  to  differ  from  those  reflected  in  the  forward‐looking  statements,  including,  without limitation, risks relating to: global economic and social impact of COVID‐19; fluctuating commodity prices;  calculation  of  resources,  reserves  and  mineralization  and  precious  and  base  metal  recovery;  interpretations  and  assumptions of mineral resource and mineral reserve estimates; exploration and development programs; feasibility  and engineering reports; permits and licences; title to properties; property interests; joint venture partners; acquisition  of commercially mineable mineral rights; financing; recent market events and conditions; economic factors affecting  the  Company;  timing,  estimated  amount,  capital  and  operating  expenditures  and  economic  returns  of  future  production;  integration  of  future  acquisitions  into  the  Company’s  existing  operations;  competition;  operations  and  political  conditions;  regulatory  environment  in  China  and  Canada;  environmental  risks;  foreign  exchange  rate  fluctuations; insurance; risks and hazards of mining operations; key personnel; conflicts of interest; dependence on  management;  internal  control  over  financial  reporting;  and  bringing  actions  and  enforcing  judgments  under  U.S.  securities laws. 

This list is not exhaustive of the factors that may affect any of the Company’s forward‐looking statements. Forward‐ looking statements are  statements about the future and are inherently uncertain, and actual  achievements of the  Company  or  other  future  events  or  conditions  may  differ  materially  from  those  reflected  in  the  forward‐looking  statements due to a variety of risks, uncertainties and other factors, including, without limitation, those referred to in  the Company’s Annual Information Form under the heading “Risk Factors”.  Although the Company has attempted to  identify important factors that could cause actual results to differ materially, there may be other factors that cause  results  not  to  be  as  anticipated,  estimated,  described  or  intended.    Accordingly,  readers  should  not  place  undue  reliance on forward‐looking statements.    

The  Company’s  forward‐looking  statements  are  based  on  the  assumptions,  beliefs,  expectations  and  opinions  of  management  as  of  the  date  of  this  news  release,  and  other  than  as  required  by  applicable  securities  laws,  the  Company does not assume any obligation to update forward‐looking statements if circumstances or management’s  assumptions,  beliefs,  expectations  or  opinions  should  change,  or  changes  in  any  other  events  affecting  such  statements. For the reasons set forth above, investors should not place undue reliance on forward‐looking statements.

Consolidated Statements of Financial Position 

As at June 30, As at March 31, 2020 2020

ASSETS Current Assets

Cash and cash equivalents $                                94,024 $ 65,777

Short‐term investments84,36276,742
Trade and other receivables9871,178
Current portion of lease receivable195186
Inventories7,5588,430
Due from related parties621,519
Income tax receivable‐1,093
Prepaids and deposits3,7643,254

190,952 158,179

Non‐current Assets

Long‐term prepaids and deposits402390
Long‐term portion lease receivable315348
Reclamation deposits7,6959,230
Investment in an associate51,33244,555
Other investments7,3758,750
Plant and equipment66,39366,722
Mineral rights and properties229,854224,586

TOTAL ASSETS $                             

554,318 $ 512,760

LIABILITIES AND EQUITY Current Liabilities

Accounts payable and accrued liabilities  $                                31,712 $ 23,129

Current portion of lease obligation594567
Deposits received3,2383,195
Income tax payable1,676937

37,220 27,828

Non‐current Liabilities

Long‐term portion of lease obligation1,4251,502
Deferred income tax liabilities36,66435,758
Environmental rehabilitation8,6788,700
Total Liabilities83,98773,788

Equity

Share capital245,075243,926
Equity reserves(4,270)(21,142)
Retained earnings159,211145,898
Total equity attributable to the equity holders of the Company400,016368,682
Non‐controlling interests70,31570,290
Total Equity470,331438,972

TOTAL LIABILITIES AND EQUITY $                             

554,318 $ 512,760

Consolidated Statements of Income

(Unaudited ‐ Expressed in thousands of U.S. dollars, except for per share figures)

2020 2019

Sales $               46,705 $               45,576

Cost of mine operations

Production costs17,74718,000
Depreciation and amortization5,7405,869
Mineral resource taxes1,3361,251
Government fees and other taxes540594
General and administrative2,0572,129

27,420 27,843

Income from mine operations19,28517,733
Corporate general and administrative2,6872,353
Property evaluation and business development(3,785)66
Foreign exchange loss2,670854
Loss on disposal of plant and equipment192142
Gain on disposal of mineral rights and properties‐(1,477)
Share of loss in associate161281
Dilution gain on investment in associate‐(723)

Reclassification of other comprehensive income upon

ownership dilution of investment in associate‐(21)
Gain on equity investments designated as FVTPL(5,466)‐
Other (income) expense(248)199
Income from operations23,07416,059
Finance income947929
Finance costs(147)(175)
Income before income taxes23,87416,813
Income tax expense (recovery)5,382(488)

Net income $               18,492 $               17,301

Attributable to:

Equity holders of the Company $               15,491 $               12,607 Non‐controlling interests 3,001 4,694 $               18,492 $               17,301

Earnings per share attributable to the equity holders of the Company Basic earnings per share $                    

0.09 $ 0.07

Diluted earnings per share $                    

0.09 $ 0.07 Weighted Average Number of Shares Outstanding ‐ Basic 173,997,464 169,991,268 Weighted Average Number of Shares Outstanding ‐ Diluted 176,414,612 170,753,967

Consolidated Statements of Cash Flow

2020 2019

Cash provided by Operating activities

Net income $                 18,492 $ 17,301 Add (deduct) items not affecting cash:

Finance costs147175
Depreciation, amortization and depletion6,1486,220
Share of loss in associate161281
Dilution gain on investment in associate‐(723)

Reclassification of other comprehensive loss upon ownership

dilution of investment in associate‐(21)
Income tax expense (recovery)5,382(488)
Gain on equity investments designated as FVTPL(5,466)‐
Loss on disposal of plant and equipment192142
Gain on disposal of mineral rights and properties‐(1,477)
Share‐based compensation723325
Reclamation expenditures(78)‐
Income taxes paid(2,749)(1,919)
Interest paid(25)(73)
Changes in non‐cash operating working capital7,215155
Net cash provided by operating activities30,14219,898

Investing activities

Mineral rights and properties Capital expenditures (7,851) (6,770) Proceeds on disposals ‐ 4,691 Plant and equipment Additions (806) (2,171) Proceeds on disposals 1 1 Reclamation deposits Paid (250) (17) Refund 1,775 ‐ Other investments ‐

Acquisition(5,538)‐
Proceeds on disposals16,574‐
Investment in associate(5,805)(3,023)
Net redemptions (purchases) of short‐term investments890(24,075)
Principal received on lease receivable4527
Net cash used in investing activities(965)(31,337)

Financing activities

Related parties Repayments received 1,423 ‐ Bank loan Repayment ‐ (4,369) Principal payments on lease obligation (132) (101) Non‐controlling interests

Distribution(3,239)‐
Cash dividends distributed(2,178)(2,125)
Proceeds from issuance of common shares832220
Net cash used in financing activities(3,294)(6,375)
Effect of exchange rate changes on cash and cash equivalents2,364(304)
Increase (decrease) in cash and cash equivalents28,247(18,118)
Cash and cash equivalents, beginning of the period65,77767,441

94,024 $

Cash and cash equivalents, end of the period $                

49,323

Mining Data

(Expressed in thousands of U.S. dollars, except for mining data figures)

ConsolidatedThree months ended June 30,
20202019Changes

Production Data Mine Data

Ore Mined (tonne)  254,555 257,392 ‐1% Ore Milled (tonne) 262,326 259,542 1%

Head Grades

Silver (gram/tonne)228254‐10%
Lead (%)3.73.71%
Zinc (%)1.61.7‐4%

Recovery Rates

Silver (%)93.193.50%
Lead (%)95.194.80%
Zinc (%)79.575.75%

Cost Data

+ Mining cost per tonne of ore mined ($)73.9177.40‐5%
Cash mining cost per tonne of ore mined ($)54.9755.45‐1%
Depreciation and amortization charges per tonne of ore mined ($)18.9421.95‐14%
+ Unit shipping costs ($)2.502.77‐10%
+ Milling costs per tonne of ore milled ($)11.0412.49‐12%
Cash milling costs per tonne of ore milled ($)9.5810.63‐10%
Depreciation and amortization charges per tonne of ore milled ($)1.461.86‐22%
+ Cash production cost per tonne of ore processed ($)67.0568.85‐3%
+ All‐in sustaining cost per tonne of ore processed ($)112.59120.16‐6%
+ Cash cost per ounce of Silver, net of by‐product credits ($)(1.48)(2.17)32%
+ All‐in sustaining cost per ounce of silver, net of by‐product credits ($)5.615.69‐1%

Concentrate inventory

Lead concentrate (tonne)  1,338 4,247 ‐68% Zinc concentrate (tonne) 969 285 240%

Sales Data  Metal Sales 

Silver (in thousands of ounces)1,8721,8551%
Gold (in thousands of ounces)1.11.010%
Lead (in thousands of pounds)20,88517,84217%
Zinc (in thousands of pounds)6,9587,334‐5%

Revenue

Silver (in thousands of $)26,18523,55811%
Gold (in thousands of $)1,4771,08237%
Lead (in thousands of $)14,37415,178‐5%
Zinc (in thousands of $)4,1555,152‐19%
Other (in thousands of $)514606‐15%
46,70545,5762%

Average Selling Price, Net of Value Added Tax and Smelter Charges

Silver ($ per ounce)13.9912.7010%
Gold ($ per ounce)1,3431,08224%
Lead ($ per pound)0.690.85‐19%
Zinc ($ per pound)0.600.70‐14%