Friday, September 18, 2026
MiningNewsTerminal
Friday, September 18, 2026 Admin

ROAR.V ·

LION ROCK Drilling Update FOR High-Grade GOLD-Lithium Project at Volney, South Dakota

Exploration Programs

200 Burrard Street, Suite 1615, Vancouver, BC, V6C 3L6

LION ROCK DRILLING UPDATE FOR HIGH-GRADE GOLD-LITHIUM PROJECT

AT VOLNEY, SOUTH DAKOTA

Vancouver, British Columbia – December 2, 2025 – Lion Rock Resources Inc. (TSX-V: ROAR, FSE:

KGB, OTCQB: LRRIF) (the “Company ”) is pleased to provide an update on its inaugural drill program

at Volney in the historic Black Hills mining district of South Dakota, USA. Volney has historically produced

high-grade gold, lithium, and tin.

Following the completion of a $5.3 million financing in Q3 2025, Lion Rock is well funded to advance its

multi-phase exploration and drilling program at the Volney Project (see Lion Rock news release dated

September 15, 2025).

News Highlights

• Mineralized and Altered Shear Zones Successfully In tersected: Drilling has encountered

sulphide-bearing shear intervals with associated quartz veining and silicification hosted in altered

rocks. Of note, drill core displays similar characteristic s to mapping and surface sampling,

where grab samples returned up to 14.0 g/t Au (see Lion Rock news release dated May 28, 2025 ).

• Spodumene-bearing Pegmatite Intersected: Spodumene has been identified in multiple

pegmatite intercepts in the Giant Volney and Rough & Ready mine areas. Drillhole VOL25-009

intercepted two spodumene-bearing pegmatite zones from 48.3 to 76.9 m and from 103.5 to 120.3

m (Figure 2). Of note, these pegmatites occur near areas of previ ous surface sampling that

returned up to 3.6% Li 2O and are consistent with mapped pegmatite system in the Volney target

area (see Lion Rock news release dated May 13, 2025).

• Ten Drillholes Completed – 2,400 m drilled: The Company has completed approximately 2,400

m across ten drillholes targeting both interpreted gold-bearing horizons and lithium-bearing

pegmatites near the historic Giant Volney Mine, Rus ty Mine, and Rough & Ready mine areas

(Figure 1 ). Of the holes completed to date, six have targeted lithium-bearing pegmatites and four

have targeted gold-bearing structures (Table 1 ). This represents the first modern drill testing along

the Volney trend.

• Assays Pending: Core from the completed drillholes is currently being logged and sampled, and

shipments to SGS in Denver have begun for analysis. Assay results will be reported as they become

available.

Dale Ginn, President and CEO of Lion Rock, stated “The Volney drill program is proceeding at a strong,

steady pace and we are highly encouraged by the geo logical features observed to date in the drill core .

While assays are pending, I can state that we have multiple holes intersecting sulphide mineralization ,

shearing, veining and strong alteration in the areas we projected, based on high-grade gold mineralization

documented at surface.

200 Burrard Street, Suite 1615, Vancouver, BC, V6C 3L6

Likewise, all six drillholes targeting pegmatites have encountered spodumene-bearing zones, which have

the potential to host high-grade lithium. Drilling is ongoing and we look forward to sharing a significant

number of assays in the coming weeks.”

Figure 1. Plan map showing completed drillholes as part of the ongoing drill program at the Volney

Project, South Dakota.

200 Burrard Street, Suite 1615, Vancouver, BC, V6C 3L6

Figure 2. Cross section looking northwest of drillhole VOL25-009 showing projected spodumene

pegmatite with surface mapping and sampling.

200 Burrard Street, Suite 1615, Vancouver, BC, V6C 3L6

Table 1. Drilling Completed to Date

Hole Number Target Northing (m) Easting (m) Elevation (m) Azimuth Dip Length (m)

VOL25-001 Gold 4914064 575579 1787 60 -45 402

VOL25-002 Gold 4914024 575714 1810 50 -45 312

VOL25-003 Gold 4914024 575715 1810 80 -45 153

VOL25-004 Lithium 4914142 575732 1818 60 -50 141

VOL25-005 Lithium 4914142 575732 1818 75 -50 19

VOL25-006 Gold 4914141 575728 1818 240 -45 363

VOL25-007 Lithium 4914107 575755 1819 60 -45 240

VOL25-008 Lithium 4914202 575714 1818 60 -45 258

VOL25-009 Lithium 4914295 575628 1828 30 -45 270

VOL25-010 Lithium 4914295 575628 1828 60 -45 240

About the Volney Project

The Volney property is a multi-commodity project strategically located in South Dakota’s Black Hills, a

historically rich and active mining region ( Figure 3). The Homestake Mine in the Black Hills produced

more than 40 million ounces of gold, making it one of the most significant gold producers in North

American history.1 The Volney Project is home to the Giant Volney pegmatite, a 635 m long LCT (Lithium-

Cesium-Tantalum) pegmatite which remains untested a t depth. The district continues to attract modern

exploration efforts, with companies such as Dakota Gold Corp. actively advancing projects within the Black

Hills. The project is accessible year-round and consists of private claims with surface and mineral rights,

which facilitates rapid permitting and project advancement.

1 James Norton, 1974, Gold in the Black Hills, South Dakota, and how new deposits might be found, USGS

Publications Warehouse

200 Burrard Street, Suite 1615, Vancouver, BC, V6C 3L6

Figure 3. Volney Project regional map in the Black Hills, South Dakota.

The technical content of this news release has been reviewed and approved by Carl Ginn, P.Geo., consultant

to the Company and a Qualified Person pursuant to National Instrument 43-101.

About Lion Rock Resources Inc.

Lion Rock Resources Inc. is a Canadian mineral exploration company committed to advancing high-grade

gold and lithium projects across North America. The Company’s flagship asset, the Volney Project, is

located in South Dakota’s Black Hills, a mining-friendly jurisdiction surrounded by active gold operations.

The Company is led by an award-winning team with a proven track record of mineral discoveries, project

development, and financing.

On Behalf of the Board

R. Dale Ginn, President & Chief Executive Officer

O: 604-678-5308

200 Burrard Street, Suite 1615, Vancouver, BC, V6C 3L6

E: [email protected]

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the

TSXV Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

Caution Regarding Forward-Looking Information

Certain statements contained in this news release may constitute “forward-looking information” within the meaning

of Canadian securities legislation. Forward-looking information is often, but not always, identified by the use of words

such as “anticipate”, “plan”, “estimate”, “expect”, “may”, “will”, “intend”, “should”, “potential”, “i ndicative”

and similar expressions. Forward-looking informatio n involves known and unknown risks, uncertainties a nd other

factors that may cause actual results or events to differ materially from those anticipated in such fo rward-looking

information. Such forward-looking information is based on the current expectations of management of the Company.

The Company’s actual results could differ materially from those anticipated in this forward-looking information as a

result of risks and uncertainties, including withou t limitation risks and uncertainties inherent in th e exploration and

development of mineral properties, fluctuations in commodity prices, counterparty risk, market conditions, regulatory

decisions, competitive factors in the industries in which the Company operates, prevailing economic co nditions,

changes to the Company’s strategic growth plans, an d other factors, many of which are beyond the contr ol of the

Company. The Company believes that the expectations reflected in the forward-looking information are reasonable,

but no assurance can be given that these expectations will prove to be correct and such forward-looking information

should not be unduly relied upon. In making the for ward-looking statements in this press release, the Company has

applied several material assumptions. Any forward-looking information contained in this news release represents the

Company’s expectations as of the date hereof and is subject to change after such date. The Company dis claims any

intention or obligation to update or revise any for ward-looking information whether as a result of new information,

future events or otherwise, except as required by applicable securities legislation.