Sunday, September 20, 2026
MiningNewsTerminal
Sunday, September 20, 2026 Admin

DRC.CN ·

AJN Resources Inc. Identifies Spodumene Within Pegmatites over a Strike Length of 7km on PR 15383 at Kabunda South, Located in the Manono Region, Eastern DRC

Exploration Programs

AJN Resources Inc. Identifies Spodumene

Within Pegmatites over a Strike Length of 7km

on PR 15383 at Kabunda South, Located in the

Manono Region, Eastern DRC

Vancouver, British Columbia--(Newsfile Corp. - July 4, 2023) - AJN Resources Inc. (CSE: AJN) (FSE:

5AT) (

AJN

or the

Company

) is pleased to announce that it has completed a reconnaissance mapping

and sampling programme on its Kabunda South Project. Key outcomes from the program include:

Spodumene within pegmatites visually identified across the full 7km strike

extent of the

permit. Assay results from sampling expected in August.

Steeply dipping pegmatites mineralized in spodumene were identified over

widths of between

50m to 200m over a strike extent of 1.5kms

in the northern area of the permit. This area

prioritized for follow up pitting and drilling.

Follow up pitting is in progress and the Company is aiming to mobilise drill rigs and

commence

drilling late Q3 / early Q4 2023

.

Pitting will also target identification of additional pegmatites under cover in the southern area.

Mr. Klaus Eckhof, CEO and President of AJN commented, "

We are extremely pleased at the extent of

pegmatites with visible spodumene at surface which have been identified in our early reconnaissance

phase of mapping and sampling. This early work has already identified a 1.5km drill target which will

enable us to better understand the distribution of spodumene and the lithium grade within the

pegmatites. The Company has started talking to drilling contractors as the current dry season would

be the optimum time to conduct site inspections and to mobilise drill rigs and equipment."

Kabunda South Project, PR 15383 (AJN earning 75%)

The Kabunda South Project (

PR 15383

or the

Project

) is located roughly 120km southeast of the world

class Manono Lithium and Tin Project and the Company's recently acquired PR 15282, both of which lie

within the broader pegmatite bearing belt which covers roughly 500km in the eastern Democratic

Republic of the Congo (

DRC

) and is strongly associated with lithium, tin, tungsten, tantalum, niobium and

beryllium mineralisation. The Project lies in the Kabunda Pegmatite Corridor, as shown in Figure 1,

within the Manono Region, Tanganyika Province of the DRC. The Project is located roughly 500kms

north of Lubumbashi and can be accessed by road from Lubumbashi or Manono.

Figure 1:

Location of PR 15383 and PR 15282 within the Broader 500km long Lithium Pegmatite

Corridor in the Eastern DRC.

To view an enhanced version of this graphic, please visit:

https://images.newsfilecorp.com/files/5922/172121_0fc45a9c048d885d_001full.jpg

The Company has recently completed a reconnaissance mapping and sampling programme at the

Project, being the first modern exploration work undertaken in the area. Pegmatites with spodumene

have been visually identified over 7km on the project area as shown in Figure 2. Surface mapping has

identified the northern 1.5km to be the most prospective based on extent of exposed pegmatites with

visible spodumene at surface. A pitting programme which will identify the true width potential of

pegmatites under surficial cover has commenced on traverses as shown in Figure 2.

Figure 2:

Geology Map showing 7km of Exposed Pegmatites (Spodumene shown as blue dots) on PR

15383.

To view an enhanced version of this graphic, please visit:

https://images.newsfilecorp.com/files/5922/172121_0fc45a9c048d885d_002full.jpg

The most significant pegmatite exposures with spodumene mineralisation were identified in the northern

1.5km of the licence area. The main pegmatite body has intruded granites and is exposed over 200m

width at its northern extent and over 50m in the southern portion of the priority target area. Additional,

narrower parallel pegmatite veins with spodumene were identified to the west and east of the main

pegmatite zone and will be followed up with future exploration. Pitting traverses shown in Figures 2 and 3

are currently being excavated and will potentially identify pegmatites which have not been exposed at

surface.

A total of 116 samples were collected on the licence in which visible spodumene was identified at 36

locations as shown in Figures 2 and 3. Samples will be prepared in Lubumbashi and a representative

pulp sample will be sent to ALS Global in Ireland for analysis. Results are expected in early August.

The Company intends to conduct a short drilling programme over the northern priority area within the

coming 3 - 4 months when a lower rainfall is expected in the region.

Figure 3:

Priority Target Area over the Northern 1.5km where Pegmatites (Spodumene occurrences

shown as blue dots) cover 200m in the Central Zone in the North.

To view an enhanced version of this graphic, please visit:

https://images.newsfilecorp.com/files/5922/172121_0fc45a9c048d885d_003full.jpg

Figure 4:

Photographs of Spodumene from Pegmatites on PR 15383.

To view an enhanced version of this graphic, please visit:

https://images.newsfilecorp.com/files/5922/172121_0fc45a9c048d885d_005full.jpg

Figure 5

: Pegmatite Outcrop on PR 15383.

To view an enhanced version of this graphic, please visit:

https://images.newsfilecorp.com/files/5922/172121_0fc45a9c048d885d_006full.jpg

QP Statement

Mr Stephen Alan Mawson is a consultant of AJN Resources Inc. and qualified geologist and is a

registered Professional Natural Scientist (Geological Science) with the South African Council for Natural

Scientific Professions (SACNASP Reg. No. 400074/03) and a member of the Geological Society of

South Africa. Mr Mawson is a qualified person (QP) under NI 43-101 and has reviewed and approved

the scientific and technical information contained in this news release.

About AJN Resources Inc.

AJN is a junior exploration company. AJN's management and directors possess over 75 years of

collective industry experience and have been very successful in the areas of exploration, financing and

developing major mines throughout the world, with a focus on Africa, especially the Democratic Republic

of the Congo.

For further information, please contact Investor Relations:

Sheena Eckhof

Director, Investor Relations

[email protected]

Visit us at

www.ajnresources.com

Tel: +44 7496 291547

On Behalf of the Board of Directors

Klaus Eckhof

CEO and President

[email protected]

Cautionary Note Regarding Forward-Looking Statements

The information in this news release may include certain information and statements about

management's view of future events, expectations, plans and prospects that may constitute forward-

looking statements. Forward-looking statements are based upon assumptions that are subject to

significant risks and uncertainties. Because of these risks and uncertainties and as a result of a variety

of factors, the actual results, expectations, achievements or performance may differ materially from those

anticipated and indicated by these forward-looking statements. Although AJN Resources Inc. believes

that the expectations reflected in forward-looking statements are reasonable, it can give no assurances

that the expectations of any forward-looking statements will prove to be correct. Except as required by

law, AJN Resources Inc. disclaims any intention and assumes no obligation to update or revise any

forward-looking statements to reflect actual results, whether as a result of new information, future events,

changes in assumptions, changes in factors affecting such forward-looking statements or otherwise.

Not for distribution to United States newswire services or for dissemination in the United States.

To view the source version of this press release, please visit

https://www.newsfilecorp.com/release/172121