Doubleview Gold Corp. Announces Successful Completion of 2025 Drilling Season at the Hat Project, the Largest Drill Season yet with 13,290m Diamond Drill Core
Doubleview Gold Corp.
TSX.V: DBG
OTC: DBLVF
FSE: 1D4
470 Granville St. Suite #822
Vancouver, BC, V6C 1V5
T:604.678.9587
F:778.379.3899
W:www.doubleview.ca
December 8, 2025
Doubleview Gold Corp. Announces Successful Completion of 2025 Drilling Season at the Hat Project, the
Largest Drill Season yet with 13,290m Diamond Drill Core
Vancouver, British Columbia — (December 8, 2025) — Doubleview Gold Corp. (“Doubleview” or the “Company”)
(TSXV: DBG) (OTCQB: DBLVF) (FSE: 1D4) is pleased to announce the completion of its 2025 drilling season at
the Hat Polymetallic Project in northwestern British Columbia. This year’s program marks the largest drilling
campaign in the Hat Project’s history, with 13,290 metres drilled across 19 drill holes , achieving a 100%
success rate with every drill hole intersecting mineralization, while confirming the deposit remains open to
depth and laterally.
The 2025 campaign delivered major advancements in our understanding of the geology and dimensions of the Hat
deposit, including the identification of a newly recognized mineralized horizon located beneath and adjacent
the 2024 conceptual open-pit shell. Importantly, mineralization domains were better defined, existing data gaps
were closed, and the Company’s evolving geological and resource models were validated (see Figures 1-4, also
available on the Company’s website at www.doubleview.ca).
Assays from holes H100 through H108 remain pending and will be released once received, reviewed, and
interpreted in accordance with NI 43-101.
Highlights of the 2025 Drill Season
• 13,290 metres drilled in 19 holes, averaging 699.5 metres per hole — the largest and most efficient and
technically productive program ever.
• A newly discovered deep mineralized horizon beneath the 2024 conceptual pit outline confirms
significant down-dip continuity and expansion potential as mineralization remains open at depth and
laterally in multiple directions.
• Every drill hole intercepted mineralization, demonstrating the strength and continuity of the porphyry
system.
• H097, H098, and H099, previously disclosed, extended mineralization by 200–300 metres down-dip and
up to 100 metres laterally, significantly improving the block model and geological interpretation.
• H099 returned 438 m of 0.40% CuEq , including 52 m of 1.02% CuEq , another one of the strongest
continuous intervals drilled at the Hat to date.
• Newly completed holes H100–H108 were strategically positioned to evaluate depth extensions, lateral
continuities, and untested model gaps. Core samples from these drill holes are being processed at the
independent assay lab.
• Pending assays for nine remaining holes will inform updates to the Mineral Resource Estimate (MRE-
2) and the ongoing Preliminary Economic Assessment (PEA). Note: Due to timing issues, we may not
be able to include all assay data in those technical reports.
Doubleview Gold Corp.
TSX.V: DBG
OTC: DBLVF
FSE: 1D4
470 Granville St. Suite #822
Vancouver, BC, V6C 1V5
T:604.678.9587
F:778.379.3899
W:www.doubleview.ca
• 2025 work further advances Doubleview's understanding of copper-gold-cobalt-scandium mineral
domains. The recently-announced potential scandium recovery achievements are a major milestone for
the Hat’s critical-metals profile.
Farshad Shirvani, President & CEO, commented:
“This has been a transformational year for Doubleview and the Hat Project. Our 2025 drill campaign successfully
demonstrated the strength of our geological model, filled key data gaps, and uncovered an entirely new mineralized
horizon beneath the 2024 conceptual pit shell. Every drill hole intersected mineralization, which is a testament to
the quality and strength of our technical team, along with the robustness of the system.
The discovery potential at Hat continues to expand, with the deposit remaining open both laterally and at depth.
Combined with last year’s exceptional drill results, our scandium recovery breakthrough, and the ongoing work
toward the updated Resource Estimate and PEA, we are entering the next phase of project development with a
high degree of confidence and momentum. I extend my thanks to our technical team, contractors, and shareholders
for enabling the most successful drilling season in our Company’s history.”
The Company is now focused on completing the assay review and disclosure for drill holes H100 through H108,
which represent the final nine holes of the 2025 program. Assay results, when received, verified, and interpreted in
accordance with NI 43-101 standards, will be announced and incorporated into the geological and resource models.
In parallel, the Company continues to advance its Preliminary Economic Assessment (PEA), which is currently
undergoing both internal modelling and external third -party review. The integration of the full 2025 drill dataset,
including pending assays, is expected to materially enhance the confidence and robustness of the forthcoming PEA,
supporting a comprehensive evaluation of the Hat Project’s economic potential and paths to development.
Figure 1: Drill plan and 2025 Extension around the 2024 Conceptual Pit
Doubleview Gold Corp.
TSX.V: DBG
OTC: DBLVF
FSE: 1D4
470 Granville St. Suite #822
Vancouver, BC, V6C 1V5
T:604.678.9587
F:778.379.3899
W:www.doubleview.ca
Figure 2: 2025 drilling, mineralization extension at depth and around the 2024 conceptual pit
Figure 3: 2024 Conceptual pit shell in 3D and 2025 drill holes demonstrating the strategic exploration in
2025
Doubleview Gold Corp.
TSX.V: DBG
OTC: DBLVF
FSE: 1D4
470 Granville St. Suite #822
Vancouver, BC, V6C 1V5
T:604.678.9587
F:778.379.3899
W:www.doubleview.ca
Figure 4: 2024 Conceptual pit shell in 3D and 2025 drill holes demonstrating the strategic exploration in
2025
Doubleview maintains a website at www.doubleview.ca.
Qualified Persons:
Erik Ostensoe, P. Geo., a consulting geologist, and Doubleview’s Qualified Person with respect to the Hat Project
as defined by National Instrument 43-101 Standards of Disclosure for Mineral Projects, has reviewed, and approved
the technical contents of th is news release. He is not independent of Doubleview as he is a shareholder in the
company.
About Doubleview Gold Corp
Doubleview Gold Corp. is mineral resource exploration and development company headquartered in Vancouver,
British Columbia, Canada. It is publicly traded on the TSX-Venture Exchange (TSXV: DBG), (OTCQB: DBLVF),
(WKN: LA1W038), and (FSE: 1D4). Doubleview focuses on identifying, acquiring, and financing precious and base
metal exploration projects across North America, with a strong emphasis on British Columbia. The company
enhances shareholder value through the acquisition and exploration of high-quality gold, copper, cobalt, scandium,
and silver projects-collectively critical minerals utilizing cutting -edge exploration techniques.
Doubleview's success is deeply rooted in the unwavering support of its long -term shareholders, supporters, and
institutional investors. Their ongoing commitment has been instrumental in advancing the company's strategic
initiatives. Doubleview looks forward to further collaborative growth and development and continues to welcome
active participation from its valued stakeholders as the company expands its portfolio and strengthens its position
in the critical minerals sector.
About the Hat Polymetallic Deposit
The Hat Deposit, located in northwestern British Columbia, is a polymetallic porphyry project with major resources
of copper, gold, cobalt, and the potential for scandium. As one of the region's significant sources of critical minerals,
Doubleview Gold Corp.
TSX.V: DBG
OTC: DBLVF
FSE: 1D4
470 Granville St. Suite #822
Vancouver, BC, V6C 1V5
T:604.678.9587
F:778.379.3899
W:www.doubleview.ca
the Hat deposit has undergone targeted exploration and development. The 0.2% CuEq cut-off resource estimate,
as of the recently completed Mineral Resource Estimate and the Company's July 25, 2024, news release, is
summarized below:
Average Grade Metal Content
Open Pit
Model Hat
Resource
Category
Tonnage CuEq Cu Co Au Ag CuEq Cu Co Au Ag
Mt % % % g/t g/t million lb million lb million lb thousand oz thousand oz
In Pit
Indicated 150 0.408 0.221 0.008 0.19 0.42 1,353 733 28 929 2,045
Inferred 477 0.344 0.185 0.009 0.15 0.49 3,619 1,945 91 2,328 7,575
Scandium potential for the Hat Deposit is estimated to be 300 to 500 million tonnes at an average grade of 40 ppm
(0.004%) Sc2O3.
For further details of the MRE, please refer to the Company's July 25, 2024 news release.
On behalf of the Board of Directors,
Farshad Shirvani, President & Chief Executive Officer
For further information please contact:
Doubleview Gold Corp
Vancouver, BC Farshad Shirvani
President & CEO
T: (604) 678-9587
NEITHER TSX VENTURE EXCHANGE NOR ITS REGULATION SERVICES PROVIDER (AS THAT TERM IS
DEFINED IN THE POLICIES OF THE TSX VENTURE EXCHANGE) ACCEPTS RESPONSIBILITY FOR THE
ADEQUACY OR ACCURACY OF THIS RELEASE.
Certain of the statements made and information contained herein may constitute "forward -looking
information." In particular references to the private placement and future work programs or expectations
on the quality or results of such work programs are sub ject to risks associated with operations on the
property, exploration activity generally, equipment limitations and availability, as well as other risks that
we may not be currently aware of. Accordingly, readers are advised not to place undue reliance on forward-
looking information. Except as required under applicable securities legislation, the Company undertakes
no obligation to publicly update or revise forward -looking information, whether as a result of new
information, future events or otherwise.