Talmora Diamond Inc. Exploration Update
TALMORA DIAMOND INC.
( CSE – TAI )
6 Willowood Court Tel: 416-491-6771
Toronto, Ontario [email protected]
M2J 2M3 www.talmoradiamond.com
TALMORA DIAMOND INC. - EXPLORATION UPDATE
Toronto, January 20, 2025 - Talmora Diamond Inc. (“Talmora” or the “Company”) (CSE:TAI) is
pleased to provide an exploration update. Results and details of a recent sampling program on
the Seahorse Project, a 50/50 joint venture between the Company and Olivut Resources Ltd.,
have become available.
The 2024 summer field program was primarily to stake claims over Exploration Permit NP8436
that is due to expire January 31, 2025. Advantage was taken of the helicopter and camp during
staking to collect additional samples to those that produced 19 micro-diamonds* and one
macro-diamond in 2023 and would contribute to a drill program planned for 2025.
It should be stressed that the presence of diamonds in the beach concentrates located above
the surface of nearby kimberlite targets was unexpected as diamonds are not expected to
gravitate up in water. Many of the micro-diamonds recovered in 2023 appear to be fragments of
larger stones. Additional macro-diamonds could help understand the size distribution of the
diamonds. Theoretically one could recover macro-diamonds by sampling more fine-grained
strandline concentrate like that of the original sample that contained two diamonds (difficult and
time consuming to find and verify in the field) or sample well-sorted gravels, on or near bedrock
(unlikely to be found above water level). Alternatively, one could sample the coarsest well-
sorted concentrate above the water level of the lake to determine whether it contained macro-
diamonds that could be exploited. 400 Kg of +1mm material from three pits centered on
strandline concentrates where microdiamonds had previously been found were submitted to
SRC for caustic fusion analysis. The pits contained well-sorted bands of black sand but returned
no macro-diamonds.
The absence of macro-diamonds indicates that the well-sorted sediments above the water level
are unlikely to contain exploitable diamonds but it also indicates that the macro-diamond in the
original sample that was found above the elevation of nearby kimberlite targets must have been
from a strandline concentrate of unsorted material and therefore was not likely transported by
water to where it was found. It was likely transported by ice either from far away (unlikely
because of associated 19 microdiamonds) or by ice that scoured an immediately adjacent
weathered dyke-like kimberlite target at its junction with the Main Seahorse kimberlite target as
it plunged over a high ridge SE of Seahorse Lake. This is supported by the geophysics, the
depth of the water at the south end of Seahorse Lake (85’), the depth of the homogeneous clay
(possibly weathered kimberlite) beneath Tertiary marine clays in holes OT1002-002 and -007
located one half kilometer south of the lake (70’ including height of collar above lake surface)
and the distribution of spectra of chromite, ilmenite and pyrope detected on Aster satellite
images of Seahorse beaches.
A drill program using a core drill is planned to test the main target under Seahorse Lake and to
collect core samples for microdiamond and REE analyses of targets previously tested with a
reverse circulation airblast (RAB) drill in 2019.
The Company considers the Seahorse Project to have the potential to host diamondiferous
kimberlite bodies of significant size, has mineral chemistry that indicates the possibility of large
high value diamonds and the deeply weathered surface zone of targets previously tested have
elevated REE values that may be recovered as a by-product.
Numerous targets are drill ready on the Horton Project in which the Company has 100%
interest.
The scientific and technical portions of this news release were reviewed and approved by Alan
W. Davies, P.Eng., who is a consultant to Talmora Diamond Inc., a "qualified person" as defined
by National Instrument 43-101 Standards of Disclosure for Mineral Projects.
* Microdiamonds are defined as diamonds having the largest dimension smaller than 0.85 mm
For further information please contact Raymond Davies, President & CEO
Talmora Diamond Inc. Email: [email protected] Telephone 416-491-6771
CAUTIONARY STATEMENT
No stock exchange, securities commission or other regulatory authority has approved or disapproved the information contained
herein. This News Release includes certain "forward -looking statements" which are not comprised of historical facts. Forward -
looking statements include estimates and statements that describe the Company’s future plans, objectives or goals, including
words to the effect that the Company or management expects a stated condition or result to occur. Forward -looking statements
may be iden tified by such terms as “believes”, “anticipates”, “expects”, “estimates”, “may”, “could”, “would”, “will”, “likely”,
“probably”, “often”, or “plan”. Since forward -looking statements are based on assumptions and address future events and
conditions, by their very nature they involve inherent risks and uncertainties. Although these statements are based on information
currently available to the Company, the Company provides no assurance that actual results will meet management’s
expectations. Risks, uncertainties and other factors involved with forward-looking information could cause actual events, results,
performance, prospects and opportunities to differ materially from those expressed or implied by such forward -looking
information. Forward looking informa tion in this news release includes, but is not limited to, the Company’s objectives, goals or
future plans, statements, exploration results, potential mineralization, the estimation of mineral resources, exploration and mine
development plans, timing of th e commencement of operations , timing of the commencement of field programs and estimates
of market conditions. Factors that could cause actual results to differ materially from such forward -looking information include,
but are not limited to failure to identify mineral resources, failure to convert estimated mineral resources to reserves, the inability
to complete a feasibility study which recommends a production decision, the inability to complete or commence the anticipate d
summer field program, the preliminary nature of test results, delays or failures in obtaining sample results, delays in obtaining or
failures to obtain required governmental environmental or other project approvals, political risks, inability to fulfill the duty to
accommodate First Nations and other indigenous peoples, uncertainties relating to the availability and costs of financing needed
in the future, changes in equity markets, inflation, changes in exchange rates, fluctuations in commodity prices, delays in t he
development of projects, capital and operating costs varying significantly from estimates and the other risks involved in the mineral
exploration and development industry, and inability to predict and counteract the effects of COVID -19 on the business of the
Company including but not limited to the effects of Covid -19 on the price of commodities, capital market conditions, restriction
on labour and international travel and supply chains, and those risks set out in the Company’s public documents filed on SEDAR.
Although the Company believes that the assumptions and factors used in preparing the forward -looking information in this news
release are reasonable, undue reliance should not be placed on such information, which only applies as of the date of this ne ws
release, and no assurance can be given that such events will occur in the disclosed time frames or at all. The Company disclaims
any intention or obligation to update or revise any forward -looking information, whether as a result of new information, future
events or otherwise, other than as required by law.