Saturday, October 17, 2026
MiningNewsTerminal
Saturday, October 17, 2026 Admin

BRW.V ·

First Results of the Vat Leaching Pilot Tests

Metallurgy & Processing

NEWS RELEASE   TSX-V: KMT.V For Immediate Release   Outstanding stocks: 43,272,510

FIRST RESULTS OF THE VAT LEACHING PILOT TESTS

Québec, May 25th, 2015 – Komet Resources Inc. (“Komet” or the “Company”) announces the first results from the VAT Leaching pilot tests.

Started back in January, pilot testing was undertaken as part of a complete and meticulous assessment of onsite ore processing equipment. The leaching process was completely upgraded and modified to use a percolation (Up Flow) system instead of a flooding (down flow) system. These pilot tests will carry on through the next couple of months and will seek to optimize this new process by systematically varying parameters such as debit, granulometry, gold grade of treated material and elution performance.

Testing was conducted using the waste material available on site (see January 29th, 2015 press release). So far, treated material graded an average of 1.75 g/t AU and recovery rates obtained from leaching averaged 66% with a cash cost of 340 CAD/oz (see table below). Three gold elution were made resulting in 1,9 kg of gold (weighted average of 20.07 carats or 84%) and generating a revenue of 75 809 CAD. President and CEO André Gagné declares: “With those surprising and encouraging results and the the gravimetry circuit pilot tests beginning next July, our slogan Produce to discover... takes on its full meaning.” All the results are based on the analysis from the laboratory of SGS at Ouagadougou using fire assay followed by atomic absorption spectrometry.

VAT Leaching operating costs – pilot tests

Cost per VAT

QuantityUnit price (XOF)Unit price (CAD)Total (XOF)Total (CAD)
Chemical reactives
Cyanide (kg)15.6254 5509.52 $71 094148.73 $
Caustic Soda (kg)9.3754901.03 $4 5949.61 $
Carbon (kg)3.6111 5003.14 $5 41711.33 $
Assay
Ore27 50015.69 $15 00031.38 $
Carbon (kg)0.7515 00031.38 $11 25023.54 $
Diesel
322 excavator0.511 70024.48 $5 85012.24 $
L$ oader ($/day)0.58 45017.68 $4 2258.84 $
322 emptying111 70024.48 $11 70024.48 $
D$ u/ mp truck ($/day)12 6005.44 $2 6005.44 $
Labor (hour)
Tons per VAT39CAD
Waste processed grade (g/t)1.75
Gold per VAT (g)68.25
Recovery grade66%
Recovered gold per VAT45.045
Gold price (XOF/g)22 81447.73 $
1 VAT value (XOF)1 027 6592 149.91
Operating cost (XOF)231 014483.29 $
Gold price (XOF/g)22 81447.73 $
Gold (g) equivalent10.13
Recovery grade66%
Gold needed15.34
Security3.505631.18 $1 9694.12 $
Excavator operator35631.18 $1 6883.53 $
Loader operator15631.18 $5631.18 $
Truck operator25631.18 $1 1252.35 $
Laborer loading145631.18 $7 87516.47 $
Laborer emptying145631.18 $7 87516.47 $
Water and
Water ($/liters)46.375300.06 $1 3912.91 $
Electricity ($/Kwh)960800.17 $76 800160.67 $
Total cash cost/VAT231 014483.29 $
Tons for 1 VAT39
Minimum grade (g/t)0.39
Cost/oz (CFA)159 515
Cost/oz (CAD)340.12 $
Gold price (CAD/Oz)*1 513.00
Grams for 1 oz31.1035
Exchange CAD to XOF*469
Gold price (XOF/Oz)709 597
  • Exchange rate is the average for quarter 1, 2015 according to Oanda and gold price is the average price for quarter 1. 2015 according to london metal exchange

Jacques Marchand, P.Eng. Geo., is the Qualified Person who has reviewed this news release and is responsible for the geological information presented there.

More information about the corporation is available at: http://kometgold.com

Investor relations and information: André Gagné, President and CEO 581-300-1666 / [email protected] / Skype: andregagne11

Forward-Looking Statements

Neither TSX Venture Exchange nor the regulatory service provider (as the term is defined in TSX Venture Exchange’s policies) accepts any liability of any kind as to the authenticity or accuracy of this release. - This press release contains statements that may constitute “forward-looking information” or “forward-looking statements” as set out within the context of security law. This forward-looking information is subject to many risks and uncertainties, some of which are beyond Komet Inc.’s (“Komet”) control. The actual results or conclusions may differ considerably from those that have been set out, or intimated, in this forward-looking information. There are many factors which may cause such disparity, especially the instability of metal market prices, the results of fluctuations in foreign currency exchange rates or in interest rates, poorly estimated reserves, environmental risks (stricter regulations), unforeseen geological situations, unfavorable extraction conditions, political risks brought on by mining in developing countries, regulatory and governmental policy changes (laws and policies), failure to obtain the requisite permits and approvals from government bodies, or any other risk relating to mining and development. There is no guarantee that the circumstances anticipated in this forward-looking information will occur, or if they do occur, how they will benefit Komet. The forward-looking information is based on the estimates and opinions of Komet’s management at the time of the publication of the information and Komet does not assume any obligation to make public updates or modifications to any of the forward-looking statements, whether as a result of new information, future events, or any other cause, except if it is required by securities laws.