Production Results Financials

all financial figures are in US dollars, unless otherwise indicated

Vancouver, British Columbia--(Newsfile Corp. - February 19, 2025) - Equinox Gold Corp. (TSX: EQX) (NYSE American: EQX) ("Equinox Gold" or the "Company") is pleased to announce its unaudited financial and operating results for the fourth quarter and fiscal year ended December 31, 2024. These results are preliminary and could change based on final audited results. Equinox Gold's 2024 audited consolidated financial statements and accompanying management's discussion and analysis for the three months and year ended December 31, 2024 are expected to be released around mid-March.

Greg Smith, President & CEO of Equinox Gold, commented: “Equinox Gold finished 2024 with its strongest quarter of production, bringing full-year production to an annual record of 621,893 ounces of gold with 623,579 ounces of gold sold, and driving record financial results including revenue and cash flow from operations. These results reflect commencement of production from our new Greenstone Mine where we consolidated 100% ownership of the mine, achieved commercial production, and produced more than 111,700 ounces of gold at Greenstone in its first, partial year of operations.

“Looking forward, we expect to produce between 635,000 to 750,000 ounces of gold in 2025 with cash costs of $1,075 to $1,175 per ounce and all-in sustaining costs of $1,455 to $1,550 per ounce. This guidance does not include any production from our Los Filos Mine in Mexico. We have reached consensus on new agreements with the three local communities and two communities have ratified and signed new long-term agreements; however, one community remains outstanding. Continuing operations at Los Filos in 2025 is subject to the successful completion of new long-term agreements with all three communities in the very near term.

“We continue to advance permitting for our Castle Mountain expansion, are consolidating our Fazenda and Santa Luz mines into a combined operating unit to be called the Bahia Complex, and will commence development of the underground portal and decline at our Aurizona mine later this year. Another focus for 2025 is using increasing cash flow from operations in this strong gold price environment to reduce our corporate debt.”

HIGHLIGHTS FOR THE THREE MONTHS ENDED DECEMBER 31, 2024

Operational

Produced 213,964 ounces of gold Sold 217,678 ounces of gold at an average realized gold price of $2,636 per oz Total cash costs of $1,458 per oz and all-in sustaining cost ("AISC") of $1,652 per oz(1)

Four lost-time injuries and a total recordable injury frequency rate(2) of 2.48 for the Quarter No significant environmental incidents during the Quarter

Earnings

Income from mine operations of $170.1 million Net income of $28.3 million or $0.06 per share (basic)

Adjusted net income of $77.5 million or $0.17 per share(1)

Financial

Cash flow from operations before changes in non-cash working capital of $212.7 million ($247.8 million after changes in non-cash working capital)

Adjusted EBITDA of $218.2 million(1)

Sustaining expenditures of $39.9 million and non-sustaining expenditures of $49.1 million

____________________________________

(1) Cash costs per oz sold, AISC per oz sold, adjusted net income (loss), adjusted EBITDA (earnings before interest, taxes, depreciation and amortization), adjusted EPS (earnings per share), and net debt are non-IFRS measures. See Non-IFRS Measures and Cautionary Notes.

(2) Total recordable injury frequency rate ("TRIFR") and significant environmental incident frequency rate ("SEIFR") are both reported per million hours worked. TRIFR is the total number of injuries excluding those requiring simple first aid treatment.

RECENT DEVELOPMENTS

Provided 2025 production and cost guidance of 635,000 to 750,000 ounces of gold at cash costs of $1,075 to $1,175 per oz and AISC of $1,455 to $1,550 per oz(1)

Provided 2025 sustaining and non-sustaining expenditure guidance of $411 million $310 million of sustaining expenditures $102 million of non-sustaining expenditures Issued an updated technical report for Fazenda that includes an updated Mineral Reserve and Mineral Resource estimate, demonstrating mine life extension to 2033 At Los Filos, the Company reached consensus on terms for new agreements with the three local communities. Two communities have ratified and signed new long-term agreements; however, one community remains outstanding. If the Company is unable to satisfactorily complete these agreements with all three communities in the very near term, the Company will suspend operations at Los Filos indefinitely

2024 HIGHLIGHTS

Operational

Produced 621,893 ounces of gold Sold 623,579 ounces of gold at an average realized gold price of $2,423 per oz Total cash costs of $1,598 per oz(1) and AISC of $1,870 per oz(1)

Ten lost-time injuries, one fatality; four sites had no lost-time injuries Achieved a total recordable injury frequency rate of 2.21, 26% better than the Company's target for the year Achieved a significant environmental incident frequency rate(2) of 0.20, a 31% improvement compared to 2023 Poured first gold at Greenstone on May 22, 2024 and declared commercial production on November 6, 2024 Suspended mining in the Piaba open pit at Aurizona in April following a geotechnical event; continued processing stockpiled ore through April and accelerated mining in the new Tatajuba open pit; commenced processing Tatajuba ore in July and re-commenced mining in the Piaba open pit in November

Earnings

Income from mine operations of $304.0 million Net income of $339.3 million or $0.85 per share Adjusted net income of $96.7 million(1) or $0.24 per share(1)

Financial

Cash flow from operations before changes in non-cash working capital of $430.2 million ($372.2 million after changes in non-cash working capital)

Adjusted EBITDA of $458.2 million(1)

Sustaining expenditures of $151.1 million and non-sustaining expenditures of $283.1 million Cash and cash equivalents (unrestricted) of $239.3 million at December 31, 2024 Net debt(1) of $1,108.5 million at December 31, 2024

Corporate

On October 1, 2024, filed a short form base shelf prospectus, replacing the previous short form base shelf prospectus which was set to expire by year-end 2024 On May 13, 2024, purchased the remaining 40% of Greenstone to consolidate 100% ownership to Equinox Gold for total consideration of $962.6 million, as follows:

42.0 million common shares of Equinox Gold valued at $217.6 million $705.0 million in cash payable on closing, funded in part with a new term loan and a bought deal financing $40.0 million in cash payable by December 31, 2024, which was paid in full on December 30, 2024 Maintained liquidity On October 29, 2024, deferred the first five monthly deliveries associated with gold prepay transactions On April 26, 2024, completed $299.0 million bought deal financing to partially fund the Greenstone Acquisition; issued 56.4 million common shares at $5.30 per share On May 13, 2024, arranged new $500.0 million three-year term loan to partially fund the Greenstone Acquisition Extended the $139.3 million principal 4.75% convertible notes from March 10, 2025 to September 10, 2025 and amended the conversion price from $7.80 per common share to $6.50 per common share In October 2024, issued 26.6 million common shares upon conversion of $139.7 million of convertible notes with a $5.25 conversion price Sold the remainder of the Company's equity investment in i-80 Gold Corp. (TSX: IAU) ("i-80 Gold") for total proceeds of $48.2 million On October 9, 2024, Mr. Fraz Siddiqui resigned from the Company's Board of Directors ("Board"). Mr. Siddiqui was the Board appointee of Mubadala Investment Company under an investor rights agreement. With conversion of the $130 million convertible note and subsequent sale of the issued shares, as announced on October 3, 2024, the investor rights agreement is no longer in effect On May 10, 2024, Ms. Trudy Curran was appointed to the Board

Development and exploration

Advanced permitting and front-end engineering for the Castle Mountain Phase 2 expansion Commenced mining of the new Tatajuba open-pit deposit at Aurizona; advanced technical studies for the Piaba underground portal and ramp Successfully replaced reserves through 75,175 metres of reserve replacement drilling and strategic mine planning updates Completed 8,748 metres of step-out drilling across the portfolio with a focus on mine life extension, and completed 25,215 metres of regional drilling to delineate new deposits Issued an updated technical report for Greenstone, which included updates to the Mineral Reserve and Mineral Resource estimates, annual production estimates, and life-of-mine capital and operating costs Updated the Mineral Resource estimate for the exploration-stage Hasaga Property and issued an updated technical report

Responsible mining

Completed the Ride to Greenstone fundraiser: cycled 3,634 km from Vancouver, BC to Greenstone and raised C$1.24 million for the Geraldton District Hospital and more than C$200,000 for charities in Brazil and the USA Improved S&P Corporate Sustainability Assessment score by 13% compared to 2023

CONFERENCE CALL AND WEBCAST

Equinox Gold will host a conference call and webcast on Thursday, February 20, 2025 commencing at 7:30 am Vancouver time to discuss the financial and operating results for the fourth quarter and fiscal year ended December 31, 2024. The webcast will be archived on Equinox Gold's website until August 20, 2025.

Conference call Toll-free in U.S. and Canada: 1-844-763-8274 International callers: +1 647-484-8814

Webcast www.equinoxgold.com

BUSINESS OVERVIEW

At the date of this news release, the Company's operating gold mines are the Greenstone Mine ("Greenstone") in Canada, the Mesquite Mine ("Mesquite") in the United States, the Los Filos Mine Complex ("Los Filos") in Mexico, and the Aurizona Mine ("Aurizona"), Bahia Complex (comprising the Fazenda and Santa Luz mines) and RDM Mine ("RDM") in Brazil. In August 2024, the Company announced its decision to suspend Phase 1 operations at its Castle Mountain Mine ("Castle Mountain") for the duration of Phase 2 permitting. While residual leaching and gold production will continue into 2025, commencing September 1, 2024 Castle Mountain is being reported as a development project. The Company poured first gold at Greenstone on May 22, 2024 and declared commercial production on November 6, 2024.

On May 13, 2024, the Company acquired the remaining 40% interest in Greenstone resulting in the Company owning 100% of Greenstone (the "Greenstone Acquisition"). The operational and financial results of the assets acquired in the Greenstone Acquisition are included from May 13, 2024 onward.

CONSOLIDATED OPERATIONAL AND FINANCIAL HIGHLIGHTS

December 31, December 31, 2024 2023 Basic weighted average shares during period 400,109,698 312,765,516 Shares outstanding end of period 455,232,521 318,013,861

Three months ended Year ended

December 31,September 30,December 31,December 31,December 31,
Operating dataUnit20242024202320242023
Gold producedoz213,964173,983154,960621,893564,458
Gold soldoz217,678173,973149,861623,579559,481
Average realized gold price$/oz2,6362,4611,9832,4231,941
Cash costs per oz sold(1)(2)$/oz1,4581,7201,3301,5981,350
AISC per oz sold(1)(2)$/oz1,6521,9941,6571,8701,612

Financial data

RevenueM$575.0428.4297.81,514.11,088.2
Income from mine operationsM$170.1101.438.6304.0109.0
Net income (loss)M$28.30.33.9339.328.9
Earnings (loss) per share (basic)$/share0.06-0.010.850.09
Adjusted EBITDA(1)M$218.2141.995.3458.2304.4
Adjusted net income (loss)(1)M$77.537.42.496.721.7
Adjusted EPS(1)$/share0.170.090.010.240.07

Balance sheet and cash flow data

Cash and cash equivalents (unrestricted) M$ 239.3 167.8 192.0 239.3 192.0 Net debt(1) M$ 1,108.5 1,314.7 733.0 1,108.5 733.0 Operating cash flow before changes in non- cash working capital(3) M$ 212.7 130.1 168.2 430.2 527.5

(1) Cash costs per oz sold, AISC per oz sold, adjusted EBITDA, adjusted net loss, adjusted EPS and net debt are non-IFRS measures. See Non-IFRS Measures and Cautionary Notes.

(2) Consolidated cash cost per oz sold and AISC per oz sold for the three months and year ended December 31, 2024 excludes Greenstone's results before the mine reached commercial production on November 6, 2024 and excludes Castle Mountain results after August 31, 2024 when residual leaching commenced (see Development Projects in the MD&A). Consolidated AISC per oz sold excludes corporate general and administration expenses.

(3) Includes proceeds from gold prepay arrangements of $75.6 million and $225.0 million for the three months and year ended December 31, 2023, respectively.

(4) Numbers in tables throughout this news release may not sum due to rounding.

CONSOLIDATED 2024 RESULTS COMPARED TO 2024 GUIDANCE

In February 2024, the Company published its 2024 production and cost guidance, which was subsequently updated to reflect the consolidation of its ownership of Greenstone and progress with the Greenstone ramp-up, the suspension of Phase 1 mining at Castle Mountain until Phase 2 permitting is complete, slower-than-expected recoveries at Mesquite, and the geotechnical event at Aurizona ("2024 Guidance").

2024 Actuals 2024 Guidance Range

Gold production (oz)(1) 621,893 590,000 - 675,000 $1,598 $1,450 - $1,550 Cash costs ($/oz)(1)(2)

AISC ($/oz)(1)(2) $1,870 $1,820 - $1,920 $152 $187 Sustaining capital (M$)(1)(3)

Non-sustaining capital ($M)(1)(3) $284 $295

(1) Gold production actuals and guidance includes ounces produced and expected to be produced from Greenstone, respectively, during the precommercial production and commercial production periods. Gold production guidance reflects anticipated production from Castle Mountain prior to the suspension of mining in Q3 2024, while gold production actuals reflect Castle Mountain production for full-year 2024.

(2) Consolidated cash cost per oz and AISC per oz actuals and guidance exclude the results of Greenstone gold production before the mine reached commercial production on November 6, 2024, and exclude the results of gold production at Castle Mountain after August 31, 2024, when residual leaching commenced. Cash costs per oz and AISC per oz are non-IFRS measures. See Non-IFRS Measures and Cautionary Notes.

(3) Sustaining and non-sustaining expenditures include exploration expense and capital expenditures. Sustaining and non-sustaining expenditures exclude non-cash additions including right-of-use asset additions, capitalized interest expense and capitalized depreciation expense. Total sustaining capital expenditures for the year ended December 31, 2024 were $130.8 million. Total non-sustaining capital expenditures for the year ended December 31, 2024 were $247.7 million. For the year ended December 31, 2024, non-sustaining expenditures at Greenstone exclude capitalized interest of $84.1 million. Sustaining capital expenditure is a non-IFRS measure. See Non-IFRS Measures and Cautionary Notes.

2025 GUIDANCE AND OUTLOOK

For 2025, the Company expects to produce 635,000 to 750,000 ounces of gold. Cash costs for 2025 are estimated at $1,075 to $1,175 per oz, with AISC of $1,455 to $1,550 per oz. Production and cash flow are expected to grow each quarter through 2025.

The Company is not issuing 2025 cost and production guidance for Los Filos. Continuing operations at Los Filos in 2025 is subject to the successful completion of new long-term agreements with three local communities. These new agreements are necessary to help ensure the long-term economic and investment viability of the mine, including the addition of a new 10,000 tpd carbon-in-leach (“CIL”) processing plant to increase recoveries from higher-grade ore. The Company and the three communities have held collaborative and open dialogue and reached consensus on terms for new agreements. Two communities have ratified and signed new long-term agreements; however, one community remains outstanding. If the Company is unable to satisfactorily complete these agreements with all three communities in the very near term, the Company will suspend operations at Los Filos indefinitely.

Sustaining Non-sustaining expenditures (M$)(3) expenditures (M$)(4) Production (oz) Cash Costs ($/oz)(1)(2) AISC ($/oz)(1)(2)

Canada

Greenstone 300,000 - 350,000 $790 - $890 $1,045-$1,145 $116 $35

USA

Mesquite 90,000 - 105,000 $1,235 - $1,335 $1,725 - $1,825 $51 $16

Brazil

Aurizona70,000 - 90,000$1,205 - $1,305$1,855 - $1,955$57$29
Bahia Complex(5)125,000 - 145,000$1,360 - $1,460$1,845 - $1,945$70$12
RDM50,000 - 60,000$1,615 - $1,715$1,880 - $1,980$15$10
635,000 - 750,000$1,075 - $1,175$1,455 - $1,550$310$102

Total(6)

(1) Cash costs per oz sold and AISC per oz sold are non-IFRS measures. See Non-IFRS Measures and Cautionary Notes.

(2) Exchange rates used to forecast 2025 cash cost and AISC per oz include a rate of BRL 5.25 to USD 1, CAD 1.34 to USD 1 and MXN 18.50 to USD 1.

(3) Sustaining expenditures include asset retirement obligation accretion and amortization, exploration expense and capital expenditures. Of the $310 million sustaining expenditures, $296 million is expected to be capital expenditures. Sustaining capital expenditure is a non-IFRS measure. See Non- IFRS Measures and Cautionary Notes.

(4) Non-sustaining expenditures include exploration expense and capital expenditures. Of the $102 million non-sustaining expenditures, $90 million is expected to be capital expenditures.

(5) The Bahia Complex reflects the anticipated merger of Santa Luz and Fazenda in 2025. See below for additional detail.

(6) Total is the sum of the individual mine-level amounts. Numbers may not sum due to rounding.

The Company’s primary operating focus for 2025 continues to be ramping up Greenstone to full capacity. For development activities, the Company is advancing engineering and permitting for the Castle Mountain Phase 2 expansion and plans to start underground portal development for the Aurizona underground expansion in late 2025.

Cash costs for 2025 reflect the life cycle stages of the assets in the Company's portfolio and that consumables, labour and equipment costs are expected to face continued upward pressure throughout 2025. In addition, due to the recent strength of the United States Dollar ("USD"), the Brazilian Real ("BRL"), Canadian Dollar ("CAD") and Mexican Peso ("MXN") have underperformed compared to USD in 2023 and 2024, and management expects additional weakening in the BRL, CAD and MXN compared to USD throughout 2025.

Sustaining expenditures in 2025 of $310 million includes investing: (i) $101 million in capitalized stripping programs, with the largest investments at Aurizona and Mesquite, (ii) $72 million in equipment costs, of which $52 million relates to fleet support processing improvements and production loaders at Greenstone, $12 million relates to equipment and components acquisition at Bahia Complex, and (iii) $66 million relates to tailings storage facility ("TSF") lifts and maintenance at Greenstone, Aurizona, Bahia Complex and RDM. Non-sustaining expenditures in 2025 of $102 million includes investing: (i) $32 million for post-construction costs at Greenstone including a new hydro substation, fleet equipment, a seventh genset in the power plant, and a new Ontario Provincial Police detachment building, and (ii) $23 million related to capitalized stripping programs at Mesquite and RDM.

Sustaining expenditures for 2025 include $14 million for exploration with a focus on reserve replacement across the portfolio. Non-sustaining expenditures include $14 million for step-out and regional exploration, primarily at Aurizona and in the Bahia Complex.

The Company plans to use increased cash flow from operations, coupled with high gold prices, to continue deleveraging its balance sheet, targeting approximately $200 million in debt repayment, including repayment of the 2020 Convertible Notes. Given normal seasonality of the Company's operations and Greenstone ramp-up, this is expected to occur in the second half of the year. Should the 2020 Convertible Notes be converted to shares, total deleveraging will increase by approximately $140 million, as repayment funds will be redirected to other debt reduction. This proactive debt reduction strategy is expected to enhance financial flexibility and strengthen the Company's capital structure, positioning it for long-term financial stability.

The Company is combining Fazenda and Santa Luz into a single reporting unit called the "Bahia Complex" effective in the first half of 2025. These two mines are in close geographic proximity and share management oversight, making this consolidation a strategic step to maximize synergies and cost efficiencies. Upon implementation, the Company expects to report production, cash costs, and AISC for the Bahia Complex on a combined basis.

On February 1, 2025, an executive order was signed by the President of the United States, which introduced tariffs on imports from countries including Canada and Mexico. In response, the Canadian government announced retaliatory tariffs on imports from the United States. Subsequently, all three countries postponed their previously announced tariffs. The Company believes its revenue structure will be largely unaffected by the tariffs. The Company is reviewing its exposure to the potential tariffs and alternatives to inputs sourced from suppliers that may be subject to the tariffs, if implemented. However, the majority of the Company’s cost structure relates to labour, contractors, energy and royalties in the countries in which it operates, and these items are not expected to be directly affected by any of the tariffs. While there is uncertainty as to whether the tariffs or retaliatory tariffs will be implemented, the quantum of such tariffs, the goods on which they may be applied and the ultimate effect on the Company’s supply chains, the Company will continue to monitor developments and may take steps to limit the impact of any tariffs as may be appropriate in the circumstances. The costs guidance set out above does not factor any potential impact from such tariffs.

The Company may revise guidance during the year to reflect changes to expected results.

OPERATING & FINANCIAL RESULTS BY MINE

Greenstone, Ontario, Canada

Three months ended Year ended

December 31,September 30,June 30,December 31,
Operating dataUnit2024202420242024
Ore minedkt3,1452,0381,2767,108
Waste minedkt9,2256,5795,81126,453
Open pit strip ratiow:o2.933.234.563.72
Tonnes processedkt1,6431,3197253,687
Average gold grade processedg/t1.261.151.281.22
Recovery%82.078.688.082.1
Gold producedoz53,02242,44816,247111,717
Gold soldoz56,41343,74710,358110,518
Revenue(3)M$148.3106.123.9278.3
Cash costs(1)(2)M$58.740.77.8107.2
Sustaining capital(1)M$5.3--5.3
Reclamation expensesM$0.30.40.10.8
Total AISC(1)(2)M$64.341.17.9113.3
AISC contribution margin(1)M$83.965.016.1165.0
Non-sustaining expendituresM$21.165.074.0212.9

Unit analysis

Realized gold price per oz sold$/oz2,6292,4252,3122,518
Cash costs per oz sold(1)(2)$/oz1,041930750970
AISC per oz sold(1)(2)$/oz1,1419387621,025
Mining cost per tonne mined$/t2.663.090.911.97
Processing cost per tonne processed$/t15.6812.033.8412.05
G&A cost per tonne processed$/t7.048.804.887.24

(1) Cash costs, sustaining capital, AISC, AISC contribution margin, mine-site free cash flow, cash costs per oz sold and AISC per oz sold are non- IFRS measures. See Non-IFRS Measures and Cautionary Notes.

(2) Revenue is reported net of silver revenue

Outlook

Greenstone production guidance for 2025 is 300,000 to 350,000 ounces of gold, with cash costs of $790 to $890 per oz and AISC of $1,045 to $1,145 per oz.

Sustaining expenditures at Greenstone of $116 million in 2025 include $35 million for a TSF raise, $52 million for fleet support, processing improvements and production loaders, and $20 million for a dewatering well, water management pond, waste rock storage areas, and back-up power. Nonsustaining expenditures of $35 million in 2025 relate primarily to purchasing an additional shovel and trucks, completing the relocated community electrical substation, installation of a seventh genset in the power plant, and completing the Ontario Provincial Police detachment construction.

Mesquite Gold Mine, California, USA

Three months ended Year ended December 31, September 30, December 31, December 31, December 31, Operating data Unit 2024 2024 2023 2024 2023 Ore mined and stacked on leach

padkt-1,5353,8446,68116,988
Waste minedkt13,34812,1988,06749,07634,119
Open pit strip ratiow:o-7.952.107.352.01

Average gold grade stacked to

leach padg/t-0.330.520.330.45
Gold producedoz17,12915,22325,92371,98487,753
Gold soldoz17,27315,01824,19073,66485,987

Financial data

Revenue(2)M$45.537.648.6173.1167.9
Cash costs(1)M$23.120.325.992.795.1
Sustaining capital(1)M$0.20.40.10.610.7
Reclamation expensesM$0.70.6(0.1)2.81.8
Total AISC(1)M$24.021.325.996.1107.6
AISC contribution margin(1)M$21.416.322.776.960.4
Non-sustaining expendituresM$22.711.25.941.117.2

Unit analysis

Realized gold price per oz sold $/oz2,6342,5042,0092,3501,953
Cash costs per oz sold(1)$/oz1,3371,3541,0701,2591,105
AISC per oz sold(1)$/oz1,3921,4211,0681,3061,251
Mining cost per tonne mined$/t1.711.491.911.471.66

Processing cost per tonne processed $/t - 7.16 3.85 6.82 3.01 G&A cost per tonne processed $/t - 2.96 1.39 2.91 0.96

(1) Cash costs, sustaining capital, AISC, AISC contribution margin, mine-site free cash flow, cash costs per oz sold and AISC per oz sold are non- IFRS measures. See Non-IFRS Measures and Cautionary Notes.

(2) Revenue is reported net of silver revenue.

Outlook

Mesquite production guidance for 2025 is 90,000 to 105,000 ounces of gold, with approximately 70% of production expected in the second half of the year. Cost guidance for 2025 is cash cost of $1,235 to $1,335 per oz and AISC of $1,725 to $1,825 per oz. Sustaining expenditures of $51 million primarily relate to capitalized stripping of the Brownie phase 4 and Big Chief 8 pits. Non-sustaining expenditures of $16 million primarily relate to capitalized waste stripping of the Ginger pit.

Mesquite's 2025 production is predominantly from accessing the Ginger pit which is expected to yield ore in H1 2025. Brownie phase 4, Rainbow North and Big Chief 8 pits waste stripping campaigns will be performed throughout 2025 to provide ore for 2026.

Los Filos Gold Mine, Guerrero, Mexico

Three months ended Year ended

December 31,September 30,December 31,December 31,December 31,
Operating dataUnit20242024202320242023
Ore mined - open pitkt3,3953,0541,3079,6339,092
Waste mined - open pitkt7,9488,2437,41135,08139,789
Open pit strip ratiow:o2.342.705.673.644.38
Average open pit gold gradeg/t0.600.641.210.630.86
Ore mined - undergroundkt238222125809461
Average underground gold grade g/t2.573.143.262.813.22
Tonnes processedkt3,8123,2531,48810,5669,702
Gold producedoz60,52148,46242,210170,369159,071
Gold soldoz58,32149,88039,474169,556157,586

Financial data

Revenue(2) M$ 153.4 122.6 78.2 410.8 305.0 Cash costs(1) M$ 112.1 98.3 65.2 325.5 260.8 Sustaining capital(1) M$ 6.4 8.0 16.1 40.9 33.8 Sustaining lease payments M$ 0.2 0.2 - 0.7 0.2 Sustaining exploration

expendituresM$0.10.1-0.5-
Reclamation expensesM$0.80.70.72.93.0
Total AISC(1)M$119.6107.482.0370.5297.9
AISC contribution margin(1)M$33.815.2(3.8)40.47.1
Care and maintenanceM$----0.3
Non-sustaining expendituresM$--0.2-0.7

Unit analysis

Realized gold price per oz sold $/oz2,6302,4581,9822,4231,935
Cash costs per oz sold(1)$/oz1,9221,9721,6511,9201,655
AISC per oz sold(1)$/oz2,0512,1532,0782,1851,890

Mining cost per tonne mined - open pit $/t 1.94 1.93 2.65 1.93 2.08 Mining cost per tonne mined - underground $/t 110.99 105.73 110.34 103.51 117.81 Processing cost per tonne processed $/t 7.55 7.42 17.80 7.54 10.14 G&A cost per tonne processed $/t 2.73 2.59 7.54 2.84 4.02

(1) Cash costs, sustaining capital, AISC, AISC contribution margin, mine-site free cash flow, cash costs per oz sold, and AISC per oz sold are non- IFRS measures. See Non-IFRS Measures and Cautionary Notes.

(2) Revenue is reported net of silver revenue.

Outlook

The Company is not issuing 2025 cost and production guidance for Los Filos. Continuing operations at Los Filos in 2025 is subject to the successful completion of new long-term agreements with three local communities. These new agreements are necessary to help ensure the long-term economic and investment viability of the mine, including the addition of a new 10,000 tpd carbon-in-leach (“CIL”) processing plant to increase recoveries from higher-grade ore. The Company and the three communities have held collaborative and open dialogue and reached consensus on terms for new agreements. Two communities have ratified and signed new long-term agreements; however, one community remains outstanding. If the Company is unable to satisfactorily complete these agreements with all three communities in the very near term, the Company will suspend operations at Los Filos indefinitely.

Aurizona Gold Mine, Maranhão, Brazil

Three months ended Year ended

December 31,September 30,December 31,December 31,December 31,
Operating dataUnit20242024202320242023
Ore minedkt1,0297981,4532,0393,750
Waste minedkt11,4857,5685,34725,07320,805
Open pit strip ratiow:o11.169.483.6812.305.55
Tonnes processedkt9386908122,5623,390
Average gold grade processedg/t0.900.971.440.961.22
Recovery%89.290.890.190.090.3
Gold producedoz24,27717,18134,10471,624120,626
Gold soldoz24,52016,33433,63872,895120,164

Financial data

Revenue(2)M$64.840.765.9173.8233.3
Cash costs(1)M$37.424.630.7114.2128.3
Sustaining capital(1)M$16.49.611.645.241.6
Sustaining lease paymentsM$0.30.40.51.61.9
Reclamation expensesM$0.50.40.41.71.3
Total AISC(1)M$54.635.043.2162.7173.1
AISC contribution margin(1)M$10.15.622.811.060.2
Non-sustaining expendituresM$0.90.93.54.68.3

Unit analysis

Realized gold price per oz sold $/oz2,6412,4891,9602,3841,941
Cash costs per oz sold(1)$/oz1,5251,5039131,5671,068
AISC per oz sold(1)$/oz2,2292,1451,2832,2331,440
Mining cost per tonne mined$/t2.142.483.322.583.17

Processing cost per tonne processed $/t 9.71 12.30 12.68 12.79 12.24 G&A cost per tonne processed $/t 4.16 5.59 5.30 6.15 5.16

(1) Cash costs, sustaining capital, AISC, AISC contribution margin, mine-site free cash flow, cash costs per oz sold and AISC per oz sold are non- IFRS measures. See Non-IFRS Measures and Cautionary Notes.

(2) Revenue is reported net of silver revenue.

Outlook

The Aurizona mine plan was modified as a result of the geotechnical event, with continued access restrictions to certain areas of the Piaba open pit, during the rainy season. Production guidance for 2025 is 70,000 to 90,000 ounces of gold, with cash costs of $1,205 to $1,305 per oz and AISC of $1,855 to $1,955 per oz.

Sustaining expenditures at Aurizona of $57 million in 2025 include $33 million in capitalized stripping and $16 million for Vene 2 TSF expansion. Non-sustaining expenditures at Aurizona of $29 million in 2025 primarily relate to underground development.

The Company is advancing plans for the development of the Piaba underground portal and ramp in late 2025, as discussed in the Development Projects section of the MD&A.

Fazenda Gold Mine, Bahia, Brazil

Three months ended Year ended

December 31,September 30,December 31,December 31,December 31,
Operating dataUnit20242024202320242023
Ore mined - open pitkt132141118538554
Waste mined - open pitkt1,9601,7019896,6615,168
Open pit strip ratiow:o14.8712.088.3612.389.34
Average open pit gold gradeg/t1.301.141.181.201.37
Ore mined - undergroundkt257219262780854
Average underground gold grade g/t2.061.551.881.811.78
Ore mined - totalkt3893603801,3181,407
Tonnes processedkt3743773691,4771,429
Average gold grade processedg/t1.801.371.681.471.61
Recovery%91.190.389.790.690.2
Gold producedoz18,52215,28017,70862,38266,375
Gold soldoz19,05515,46417,27363,22166,120
Revenue(2)M$50.538.234.1152.1127.8
Cash costs(1)M$19.423.421.386.481.3
Sustaining capital(1)M$3.74.25.515.012.2
Sustaining lease paymentsM$0.60.60.42.11.5
Reclamation expensesM$0.10.10.20.60.7
Total AISC(1)M$23.828.327.4104.195.7
AISC contribution margin(1)M$26.69.96.748.032.0
Non-sustaining expendituresM$3.12.72.810.610.9

Unit analysis

Realized gold price per oz sold $/oz2,6482,4721,9772,4061,932
Cash costs per oz sold(1)$/oz1,0191,5121,2341,3661,230
AISC per oz sold(1)$/oz1,2511,8311,5881,6471,448

Mining cost per tonne mined - open pit $/t 2.11 2.22 2.39 2.26 2.45 Mining cost per tonne mined - underground $/t 28.06 31.79 33.58 33.81 33.41 Processing cost per tonne processed $/t 11.62 13.63 14.06 12.76 14.49 G&A cost per tonne processed $/t 7.99 7.96 7.69 7.55 6.75

(1) Cash costs, sustaining capital, AISC, AISC contribution margin, mine-site free cash flow, cash costs per oz sold, and AISC per oz sold are non- IFRS measures. See Non-IFRS Measures and Cautionary Notes.

(2) Revenue is reported net of silver revenue.

Outlook

In 2025, the focus at Fazenda is on development of the larger, CLX open pit.

Fazenda is part of the Bahia Complex. Bahia Complex production guidance for 2025 is 125,000 to 145,000 ounces of gold, with cash costs of $1,360 to $1,460 per oz and AISC of $1,845 to $1,945 per oz.

Sustaining expenditures at Bahia Complex of $70 million in 2025 primarily relate to $22 million for capitalized stripping, $12 million for the acquisition of equipment and components, $8 million for exploration, $4 million for infrastructure and vegetation clearing, $9 million for a TSF raise, and $4 million for underground development. Non-sustaining expenditures of $12 million in 2025 relate primarily to underground development and exploration.

Sustaining expenditures for 2025 include $8 million for exploration with a focus on reserve replacement. Non-sustaining expenditures include $9 million for step-out and regional exploration.

Santa Luz Gold Mine, Bahia, Brazil

Three months ended Year ended

December 31,September 30,December 31,December 31,December 31,
Operating dataUnit20242024202320242023
Ore minedkt8773616782,0912,326
Waste minedkt2,6083,4101,32311,5228,303
Open pit strip ratiow:o2.979.441.955.513.57
Tonnes processedkt6046535362,3012,200
Average gold grade processedg/t1.271.291.171.271.25
Recovery%63.558.361.759.264.7
Gold producedoz14,79316,65012,04456,90657,182
Gold soldoz15,47816,26612,13256,98456,696

Financial data

Revenue(2)M$41.040.324.2137.5110.0
Cash costs(1)M$28.231.725.4111.295.3
Sustaining capital(1)M$0.33.73.313.87.2
Sustaining lease paymentsM$0.20.10.10.50.4
Reclamation expensesM$0.30.30.21.31.0
Total AISC(1)M$29.035.829.0126.8103.9
AISC contribution margin(1)M$12.14.4(4.8)10.86.0
Non-sustaining expendituresM$0.40.30.63.13.0

Unit analysis

Realized gold price per oz sold $/oz2,6522,4761,9932,4121,940
Cash costs per oz sold(1)$/oz1,8201,9492,0921,9511,681
AISC per oz sold(1)$/oz1,8682,2032,3922,2241,834
Mining cost per tonne mined$/t2.993.003.453.033.25

Processing cost per tonne processed $/t 21.35 22.03 25.84 23.86 23.79 G&A cost per tonne processed $/t 5.08 5.26 5.66 4.82 5.02

(1) Cash costs, sustaining capital, AISC, AISC contribution margin, mine-site free cash flow, cash costs per oz sold and AISC per oz sold are non- IFRS measures. See Non-IFRS Measures and Cautionary Notes.

(2) Revenue is reported net of silver revenue.

Outlook

In 2025, the focus at Santa Luz is on improving the steady-state throughput of the plant to achieve and maintain a design capacity of 2.7 million tonnes per annum. This improvement follows the installation of a trunnion on the SAG mill in mid-2024. The trunnion increased SAG mill throughput by up to 10%. The planned 2025 refurbishment of leach tanks and agitators, the addition of the sixth leach tank and better availability of electrowinning equipment are expected to provide a consistent recovery of approximately 64% for 2025. The desliming project is currently suspended until operational complexities are resolved and anticipated benefits are confirmed. The potential benefits associated with desliming are not included in 2025 guidance.

Santa Luz is part of the Bahia Complex. Bahia Complex production guidance for 2025 is 125,000 to 145,000 ounces of gold, with cash costs of $1,360 to $1,460 per oz and AISC of $1,845 to $1,945 per oz.

Sustaining expenditures at Bahia Complex of $70 million in 2025 primarily relate to $22 million for capitalized stripping, $12 million for the acquisition of equipment and components, $8 million for exploration, $4 million for infrastructure and vegetation clearing, $9 million for a TSF raise and $4 million for underground development. Non-sustaining expenditures of $12 million in 2025 relate primarily to underground development and exploration.

Sustaining expenditures for 2025 include $8 million for exploration with a focus on reserve replacement. Non-sustaining expenditures include $9 million for step-out and regional exploration.

RDM Gold Mine, Minas Gerais, Brazil

Three months ended Year ended

December 31,September 30,December 31,December 31,December 31,
Operating dataUnit20242024202320242023
Ore minedkt1,0227388492,2912,003
Waste minedkt2,6624,2951,89112,0529,197
Open pit strip ratiow:o2.605.822.235.264.59
Ore rehandledkt01657380715
Tonnes processedkt7286836842,6212,400
Average gold grade processedg/t0.990.820.900.790.78
Recovery%87.984.488.186.787.2
Gold producedoz21,32013,47216,99456,40052,614
Gold soldoz22,24011,99817,17756,23252,092

Financial data

Revenue(2)M$58.829.534.0136.6101.4
Cash costs(1)M$27.116.418.879.662.4
Sustaining capital(1)M$1.64.93.38.711.2
Sustaining lease paymentsM$0.30.22.51.19.5
Reclamation expensesM$0.30.30.31.10.9
Total AISC(1)M$29.321.824.990.584.0
AISC contribution margin(1)M$29.57.79.146.217.4
Care and maintenanceM$----1.0
Non-sustaining expendituresM$-0.7-6.9-

Unit analysis

Realized gold price per oz sold$/oz2,6442,4551,9802,4291,946
Cash costs per oz sold(1)$/oz1,2201,3671,0971,4151,199
AISC per oz sold(1)$/oz1,3181,8171,4531,6081,612
Mining cost per tonne mined$/t3.092.442.882.872.28
Processing cost per tonne processed$/t14.0711.9612.1812.4812.18
G&A cost per tonne processed$/t3.883.533.623.663.35

(1) Cash costs, sustaining capital, AISC, AISC contribution margin, mine-site free cash flow, cash costs per oz sold, and AISC per oz sold are non- IFRS measures. See Non-IFRS Measures and Cautionary Notes.

(2) Revenue is reported net of silver revenue.

Outlook

RDM production guidance for 2025 is 50,000 to 60,000 ounces of gold, with cash costs of $1,615 to $1,715 per oz and AISC of $1,880 to $1,980 per oz.

Sustaining expenditures at RDM of $15 million in 2025 include $6 million for the dry tails storage facility costs and $5 million for equipment to haul tails to the storage facility. Non-sustaining expenditures of $10 million in 2025 relate primarily to capitalized stripping.

CONSOLIDATED STATEMENTS OF FINANCIAL POSITION

(Unaudited, expressed in thousands of US dollars)

2024 2023

Assets Current assets

Cash and cash equivalents$ 239,329 $191,995
Marketable securities6,14292,666
Trade and other receivables70,03582,307
Inventories417,541412,005
Derivative assets-17,700
Prepaid expenses44,52935,144
Other current assets6,5292,141