Friday, September 18, 2026
MiningNewsTerminal
Friday, September 18, 2026 Admin

RDU.V ·

Preparation underway to restart exploration at Holly Property with a focus on increasing the high-grade resource Vancouver, Canada – Radius Gold Inc. (TSXV: RDU) (“Radius” or the “Company”) and joint venture partner, Volcanic Gold Mines Inc. (TSXV: VG) (“Volcanic”) are pleased to announce the resump

Mergers & Acquisitions Partnerships & JV

news release

March 3, 2025

Preparation underway to restart exploration at Holly Property with a focus on

increasing the high-grade resource

Vancouver, Canada – Radius Gold Inc. (TSXV: RDU) (“Radius” or the “Company”) and joint venture partner,

Volcanic Gold Mines Inc. (TSXV: VG) (“Volcanic”) are pleased to announce the resumption of exploration

activities on the Holly Property in Guatemala. Previous drilling in 2021 -22 at Holly defined an inferred

resource of 1.32 million tonnes at 6.46 g/t Au and 256 g/t Ag(1).

Spectacular grades were obtained in the last drill campaign where north -west trending epithermal veins

cut the regional-scale east-west trending Jocotán fault breccia. Drilling has defined continuous high-grade

mineralization along the La Peña vein to approximately 200 m below surface which remains open to depth

and on strike. The La Peña vein has been traced over 50 m into the metamorphic phyllites to the north of

the Jocotán breccia with grades of up to 15.55 m at 7.67 g/t gold and 615 g/t silver (drill hole HDD-21-

015). To the South of the Jocotán breccia, high-grade intercepts have been returned where drillholes cut

the vein in a sequence of interbedded volcanic and sedimentary rocks . The highest-grade drill intercept

to date, 4.58 m at 79.84 g/t gold and 5,053 g/t silver (drill hole HDD -21-023), occurs in a thick mudstone

unit at the base of the current mineral resource . The area around this high -grade drill intercept and the

depth continuation of the intersection of the Peña vein and the Jocotán breccia are priority targets for

further drilling.

The Peña vein is only one of several epithermal veins on the Holly property. Insufficient drill density on

other veins means that they have not been included in the current mineral resource estimate, but they

contain significant gold -silver mineralization that may add to the overall Holly resource with further

drilling. The stand-out Pino vein which cuts the Jocotán breccia only 650 m to the east of the Peña vein

has a strike length of at least 100 m defined by rock chip samples. T hree exploration drillholes at the

northern end of the vein returned drill intercepts of (1) 3.60 m at 22.03 g/t gold and 697 g/t silver, (2) 4.23

m at 4.00 g/t gold and 136 g/t silver, and (3) 3.17 m at 2.93 g/t gold and 284 g/t silver, all from within 40

m of the surface. These exploration drill results are comparable with the best intercepts at La Peña vein.

Drilling permits are in place and the Volcanic team is working with landowners, local authorities and the

local community for a social licence to operate. Additional drilling will aim to extend the depth and strike

extent of mineralization and tighten drill spacing to upgrade the confidence level of the mineral resource.

Initial drilling will test the two priority areas outlined above: (1) defining the strike length and tracking the

Peña vein down-dip where the mineral resource could potentially be expanded, and (2) additional drilling

on the Pino vein to bring the existing high-grade drill intercepts into the mineral resource.

1111 Melville Street, Suite 1000

Vancouver, BC V6E 3V6, Canada

www.radiusgold.com

T 604.801.5432

F 604.662.8829

TF 1.888.627.9378

TSX.V: RDU

-2-

Figure 1: Vertical long section along the Pena vein looking 040° northeast showing drill intercepts and interpreted geology. The

area around the isolated high-grade intercept in the mudstone in drillhole HDD-21-023 (labelled 23) is targeted for infill and

extension drilling.

Figure 2: Holly project interpreted surface geology, surface rock chip samples, and selected drill intercept projected to surface.

-3-

Drill intercepts in the Peña vein hosted by the Jocotán breccia

Hole ID From (m) To (m) Interval (m) Gold (g/t) Silver (g/t) Est. True

Width (m)

HDD-001 34.80 49.00 14.20 4.14 151 12.6 - 13.4

HDD-007 88.50 97.50 9.00 1.84 45 8.0 - 8.4

HDD-21-001 46.10 47.70 1.60 24.10 568 c. 1.1

and 53.70 60.60 6.90 4.90 85 c. 4.5

HDD-21-002 95.15 106.27 11.12 6.29 282 c. 10.8

HDD-21-003 101.85 112.50 10.65 5.45* 268 9.8 - 10.0

HDD-21-019 171.90 178.42 6.52 11.72 340 5.1 - 5.9

*Reported as 5.29 g/t Au in news release July 7, 2021 prior to receiving laboratory overlimit re-assay. Recalculated as 5.45 g/t Au

using final assay results.

Drill intercepts in the Peña vein hosted by metamorphic phyllite rock

Hole ID From (m) To (m) Interval (m) Gold (g/t) Silver (g/t) Est. True

Width (m)

HDD-21-004 119.80 143.35 23.55 3.10 694 17.7 - 18.0

Including 131.40 133.67 2.270 9.79 2035 1.7

including 136.00 137.85 1.850 5.60 2801 1.4

HDD-21-014 52.22 59.80 7.58 2.02 66 6.4 - 6.5

HDD-21-015 108.65 124.20 15.55 7.67 615 10.3 - 13.1

HDD-21-018 71.67 73.20 1.53 1.81 57 0.4 - 1.4

HDD-21-022 199.77 201.30 1.53 11.20 522 0.7 - 1.4

HDD-21-027 210.45 215.02 4.57 54.24 3925 3.0 - 3.7

Drill intercepts in the Peña vein hosted by the interbedded volcanic and sedimentary unit

Hole ID From (m) To (m) Interval (m) Gold (g/t) Silver (g/t) Est. True

Width (m)

HDD-21-017 134.25 143.08 8.83 8.81 355 5.9 - 6.8

HDD-21-020 61.70 67.10 5.40 4.38 350 4.0 - 5.1

HDD-21-023 202.82 207.40 4.58 79.84 5053 3.0 – 3.9

HDD-21-030 160.12 170.8 10.68 2.07 389 8.7 - 9.8

Drill intercepts in the Pino vein hosted by the Jocotán breccia

Hole ID From (m) To (m) Interval (m) Gold (g/t) Silver (g/t) Est. True

Width (m)

HDD-005 19.10 22.70 3.60 22.03 697 2.2 - 2.9

HDD-21-006 35.07 39.30 4.23 4.00 136 3.4 - 4.0

HDD-21-007 42.05 45.22 3.17 2.93 284 1.4 - 1.5

(1) News Release, Volcanic Gold Mines Inc. Volcanic files NI 43-101 technical report for Initial Resource Estimate at Holly Project,

Guatemala, July 27, 2022.

-4-

Simon Ridgway, President and CEO of Volcanic Gold Mines, commented: “ Since 2022 when

demonstrations resulted in suspension of the drilling campaign, we have worked with the local community

promoting the benefits that resource development can bring. There is a sense now that the attitude

towards foreign investment and metallic mining is changing for the better and feedback from the local

community is positive. We feel the time is right to reactivate what is an exciting high -grade gold-silver

prospect at Holly. The next drilling campaign will be an opportunity to further support the existing mineral

resource estimate and to start bringing some of the other veins in the Holly system into the resource

envelope.”

Technical Information

Bruce Smith, M.Sc. (Geology), a member of the Australian Institute of Geoscientists, is Radius’ Qualified

Person as defined by National Instrument 43-101 - Standards of Disclosure for Mineral Projects. Mr. Smith

has 30 years of mineral exploration experience and has prepared and approved the technical information

contained in this news release.

The Holly project mineral resource of 1.3 Mt at 6.5 g/t for 270,000 oz contained gold and 11 Moz at 260 g/t

contained silver, which equates to 9.6 g/t at 410,000 oz gold equivalent with an effective date 7 June

2022.

1. Resources estimated using a 3.0 g/t gold equivalent cut-off grade and a top cap grade of 100 g/t

Gold and 2,000 g/t Silver and presented on a 100%-basis.

2. Gold Equivalent Au(eq) values were based on Au$1800 and Ag$22 using formula (Au g/t + (Ag

g/t*0.01222)).

3. Mineral Resources are not Mineral Reserves and have not demonstrated economic viability. The

estimate of Mineral Resources may be materially affected by environmental, permitting, legal,

marketing, or other relevant issues. The mineral resources in this report were estimated using the

Canadian Institut e of Mining, Metallurgy and Petroleum standards on mineral resources and

reserves, definitions, and guidelines prepared by the CIM standing committee on reserve

definitions and adopted by the CIM council. Notw ithstanding, to meet the requirement that the

reported Mineral Resources show “reasonable prospects for eventual economic extraction”.

4. The quantity and grade of reported Inferred resources in this estimation are uncertain in nature

and there has been insufficient exploration to define these Inferred Resources as an Indicated or

Measured Mineral Resource. It is uncertain whether further exploration will result in an upgrade

to Indicated or Measured Mineral Resource category.

Radius Gold Inc.

Radius has a portfolio of projects located in Mexico , Guatemala and Peru which it continues to advance,

utilizing partnerships where appropriate to retain the Company’s treasury. At the same time,

management is seeking out additional investment and project acquisition opportunities across the globe.

Radius is a member of the Gold Group of companies , led by Simon Ridgway . You may find more

information on Radius Gold at www.radiusgold.com or www.sedarplus.ca.

-5-

ON BEHALF OF THE BOARD

Bruce Smith

President and CEO

Symbol: TSXV-RDU

Contact: Bruce Smith

1111 Melville Street, Suite 1000

Vancouver, BC V6E 3V6, Canada

Tel: 604-801-5432; Toll free 1-888-627-9378; Fax: 604-662-8829

Email: [email protected]

Website: www.radiusgold.com

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the

TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

Forward-looking statements

Certain statements contained in this news release constitute forward -looking statements within the meaning of

Canadian securities legislation. All statements included herein, other than statements of historical fact, are forward-

looking statements and include, without limitation, statements about the results of exploration work and future

plans at the Company’s projects. Often, but not always, these forward looking statements can be identified by the

use of words such as “estimate”, “estimates”, “estimated”, “potential”, “open”, “future”, “assumed”, “projected”,

“used”, “detailed”, “has been”, “gain”, “upgraded”, “offset”, “limited”, “contained”, “reflecting”, “containing”,

“remaining”, “to be”, “periodically”, or statements that events, “could” or “should” occur or be achieved and similar

expressions, including negative variations.

Forward-looking statements involve known and unknown risks, uncertainties and other factors which may cause

the actual results, performance or achievements of the Company to be materially different from any results,

performance or achievements expressed or implied by forward-looking statements. Such uncertainties and factors

include, among others, whether the planned exploration work at the Company’s projects will proceed as intended;

changes in general economic conditions and financial markets; the Company or any joint venture partner not having

the financial ability to meet its exploration and development goals; risks associated with the results of exploration

and development activities, estimation of mineral re sources and the geology, grade and continuity of mineral

deposits; unanticipated costs and expenses; and such other risks detailed from time to time in the Company’s

quarterly and annual filings with securities regulators and available under the Company’s profile on SEDAR+ at

www.sedarplus.ca. Although the Company has attempted to identify important factors that could cause actual

actions, events or results to differ materially from those described in forward -looking statements, there may be

other factors that cause actions, events or results to differ from those anticipated, estimated or intended.

Forward-looking statements contained herein are based on the assumptions, beliefs, expectations and opinions of

management, including but not limited to: that the Company’s stated goals and the planned exploration and

development activities at its properties will be achieved; that there will be no material adverse change affecting the

Company or its properties; and such other assumptions as set out herein. Forward-looking statements are made as

of the date hereof and the Company disclaims any obligation to update any forward-looking statements, whether as

a result of new information, future events or results or otherwise, except as required by law. There can be no

assurance that forward-looking statements will prove to be accurate, as actual results and future events could differ

materially from those anticipated in such statements. Accordingly, investors should not place undue reliance on

forward-looking statements.