Saturday, October 31, 2026
MiningNewsTerminal
Saturday, October 31, 2026 Admin

LME.V ·

Laurion Announces Voting Results of Its Annual and Special Meeting of Shareholders

Shareholder Meetings

NOT FOR DISTRIBUTION TO UNITED STATES NEWS SERVICES OR DISSEMINATION.

THIS NEWS RELEASE IS INTENDED FOR DISTRIBUTION IN CANADA ONLY AND IS NOT INTENDED FOR DISTRIBUTION TO UNITED STATES NEWSWIRE SERVICES OR DISSEMINATION IN THE UNITED STATES.

TORONTO, ONTARIO - (May 15, 2018) – Laurion Mineral Exploration Inc. (TSX.V: LME and OTCPINK: LMEFF) (“Laurion” or the “Corporation”) is pleased to announce the voting results of the Annual and Special Meeting of Shareholders of the Corporation that was held on October 28, 2016 (the “Meeting”). The Corporation hereby advises that the following resolutions were passed at the Meeting:

  • The election of the slate of directors set out in the Corporation’s Management Information Circular dated April 4, 2018.
  • The reappointment of RSM LLP as auditors of the Corporation for the ensuing year and the authorization of the directors of the Corporation to fix their remuneration.
  • The approval and ratification of the renewal of the Corporation’s rolling stock option plan.
  • The approval of the issuance of an aggregate of 10,366,080 Common Shares of the Corporation to certain members of management in exchange for the settlement of certain debts of the Corporation of the Corporation.

The Ishkoday Project

The Ishkoday Project is a mid-stage exploration project. The Corporation’s emphasis is on the development of its gold-silver and gold-rich polymetallic mineralization with a significant upside potential. The Corporation’s main objective is to validate the existence of a large near surface significant gold-polymetallic target over a 3 km2 area.

The Corporation has designed a strategic three-phased exploration program over the next thirty-six months, which aims at defining a bulk precious and base metal mineralization, concentrating on rapidly defining and expanding near surface mineral resources in gold, silver, zinc and copper. The Laurion Private Placement will permit the execution of: (i) an initial validation exploration program consisting of airborne geophysics covering the 47 km2 Ishkoday Project with an airborne geophysical survey to better define the geological and structural elements of the entire project; (ii) compiling, synthesizing and interpreting all of the project’s technical data, producing a 3-D view of the geology and mineralization, and targeted upside potential; and (iii) followed by a

1 | P a g e

continuous surface stripping, channel sampling and assaying of portions of the 3 km by 1 km main outcrop containing all of the known precious and metals mineralization known to date.

Mineralization on the Ishkoday Project exhibits repetitive stacked gold and zinc-rich sulphides in lenses and veins, visible in the mineralized outcrop exposure. The mineralization appears open at depth beyond the current core drilling limit of -200 m from surface, based on the historical mining to a -685 m depth, as evidenced in the Sturgeon River Mine.

To date, the Corporation has a property-wide database of 283 diamond drill holes totaling 40,729 m, detailed sampling, mapping, assays and geochemical analysis, and ground geophysics.

The Ishkoday Project hosts a series of multi-directional veins (and stockworks). The N-NE vein sets are gold-silver-quartz bearing; whereas the NE-E sets are gold-silver-zinccopper bearing. The abundance and proximity of these vein sets within a 3 km by 1 km outcrop segment of Ishkoday highlights the possibility for near surface bulk metal potential, at the same time offering a volcanogenic massive sulphide metallogenic environment, as well as individual higher gold grade veins that could be developed separately.

Previous work since the 1980’s indicates the presence of hundreds of shears, hence hundreds of veins/horizons, suggesting the potential for material vein stockworks as can be observed at other deposits in Archean Greenstone Belts, such as the Dome, Canadian-Malartic, Detour and Sigma-Lamaque Gold Deposits of the Abitibi Greenstone Belt. In the case of the Ishkoday Project, there appears to be two mineralized systems, one gold-silver-rich and the other gold-silver-zinc-copper.

Mr. Jean Lafleur, P. Geo., Laurion’s Technical Advisor to the Board of Directors, is a Qualified Person as defined by National Instrument 43-101 guidelines, and has reviewed and approved the content of this news release.

About Laurion

Laurion’s Ishkoday Project is a mid-stage exploration project. The Corporation is primarily focused on the development of its gold-rich polymetallic resource on its Ishkoday property.

The Corporation’s main project mandate is to complete the relevant economic studies, initially working towards the processing the surface rock stockpile; and, to explore and develop the large near surface polymetallic sulphide trends which extend over a 1 km x 3 km area (collective total strike length of 9,000 m), with the aim of demonstrating the existence of a significant volcanic massive sulphide (VMS) deposit, developing tonnage and demonstrating continuity through the execution of multiple phases of diamond drill programs.

2 | P a g e

FOR FURTHER INFORMATION, CONTACT:

Laurion Mineral Exploration Inc.

Cynthia Le Sueur-Aquin – President and CEO Tel: 1-705-788-9186 Fax: 1-705-805-9256 Website: http://www.laurion.ca

Caution Regarding Forward-Looking Information

This press release contains forward-looking statements, which reflect the Corporation’s current expectations regarding future events, including with respect to Laurion's business, operations and condition, management's objectives, strategies, beliefs and intentions, the details, anticipated timing and completion of the transactions and other matters described in this press release, including without limitation, the creation of Newco, the Surface Stockpile Transfer, the processing of the Stockpiles and the Private Placements, and the use of the net proceeds from the Private Placements. The forward-looking statements involve risks and uncertainties. Actual events and future results, performance or achievements expressed or implied by such forward-looking statements could differ materially from those projected herein including as a result of a change in the trading price of the Laurion Common Shares, the failure of the relevant parties to enter into definitive agreements in connection with the transactions and other matters contemplated by the LOI, the TSX-V not providing its approvals for the Surface Stockpile Transfer or the Private Placements, the interpretation and actual results of current exploration activities, changes in project parameters as plans continue to be refined, future prices of gold and/or other metals, possible variations in grade or recovery rates, failure of equipment or processes to operate as anticipated, the failure of contracted parties to perform, labor disputes and other risks of the mining industry, delays in obtaining governmental approvals or financing or in the completion of exploration, as well as those factors disclosed in the Corporation’s publicly filed documents. Investors should consult the Corporation’s ongoing quarterly and annual filings, as well as any other additional documentation comprising the Corporation’s public disclosure record, for additional information on risks and uncertainties relating to these forward-looking statements. The reader is cautioned not to rely on these forward-looking statements. Subject to applicable law, the Corporation disclaims any obligation to update these forward-looking statements.

NEITHER THE TSX VENTURE EXCHANGE NOR ITS REGULATION SERVICE PROVIDER (AS THAT TERM IS DEFINED IN THE POLICIES OF THE TSX VENTURE EXCHANGE) ACCEPTS RESPONSIBILITY FOR THE ADEQUACY OR ACCURACY OF THE CONTENT OF THIS NEWS RELEASE.

3 | P a g e