Sunday, September 20, 2026
MiningNewsTerminal
Sunday, September 20, 2026 Admin

FAT.CN ·

Foremost Lithium Commences Exploration in Preparation for Drilling at The Jean Lake Lithium Property and the Bulk Sampling of Dyke 1 on The Zoro Lithium Property, Snow Lake, Manitoba

Exploration Programs

Foremost Lithium Commences Exploration in

Preparation for Drilling at The Jean Lake

Lithium Property and the Bulk Sampling of

Dyke 1 on The Zoro Lithium Property, Snow

Lake, Manitoba

Vancouver, British Columbia--(Newsfile Corp. - June 8, 2022) -

Foremost Lithium Resource &

Technology Ltd.

(CSE: FAT) (OTCQB:

FRRSF

) (FSE: F0R0) (WKN: A3DCC8)

(

www.foremostlithium.com

) (

"

Foremost Lithium, Foremost

or the

Company

"

)

is pleased to

announce that they have commenced exploration that will lay the ground work for a diamond drill program

on their 100% owned Jean Lake Lithium Property situated in the mine-friendly district of Snow Lake,

Manitoba. The first step of this process includes the mobilizing of field crews to their 1,002

hectare/2,476-acre property where the beryl high-grade spodumene-bearing pegmatite dykes with

assays of

3.89% and 5.17% Li

2

O were uncovered in August 2021, (see news release October 28,

2021). Field work will be staged from a base in Snow Lake with helicopter support from Gogal Air

Services.

Exploration Program

Two field crews will commence follow-up prospecting of

fourteen (14) high priority targets defined as

magnetically low and structurally recessive lineaments. These lineaments host the beryl pegmatites, are

in part on trend with the SGM and Grass River lithium pegmatites of Snow Lake Resources and are

interpreted as high priority exploration targets. The lineaments were defined by an Unmanned Aerial

Vehicle (UAV Drone) assisted high-resolution geophysical survey and Centre of Exploration Targeting

"CET" analysis of the acquired data (see March 1, 2022, news release). The survey was flown by

EarthEx Geophysical Solutions Inc. (Selkirk, Manitoba) with financial support from the Manitoba Mineral

Development Fund.

The lineaments will be prospected and rock chip sampled and assayed for lithium and related elements

where exposure is permissive.

Where the lineaments are overburden covered, Mobile Metal Ion ("MMI")

soil geochemical surveys will be initiated. Rock and soil geochemical data will be reported in a

subsequent news release and ultimately integrated with magnetic survey results to form the basis for drill

testing.

Dyke 1 Mini-Bulk Sample

A field crew will also be dispatched to the Zoro Lithium Project in Snow Lake for the acquisition of a 500

kg bulk sample from the trenched surface exposure of Dyke 1 on the Zoro lithium property. Dyke 1

contains 1,074,567 tonnes at 0.91% Li

2

O, 182 ppm Be, 198 ppm Cs, 51 ppm Ga, 1212 Rb, and 43

ppm Ta at a 0.3% Li

2

O cut-off.

1

The sample will be used for the development of a spodumene

concentrate and subsequent refining into a saleable battery-grade lithium hydroxide product. The

Company has contracted XPS Expert Process Solutions in conjunction with SGS Canada Inc. to

undertake the processing of the sample.

(see news release May 26, 2022). Results are expected within

three months.

John Gravelle, of Foremost states,

"We are excited to report that crews are currently on the ground at

Jean Lake scoping the 14 identified priority drill targets. Past magnetic interpretation has shown that

our beryl pegmatites, which assayed at 3.89% and 5.17% Li20, trending along Snow Lake Lithium's

high-grade SG and GRP spodumene and GRP pegmatites. This association, along with boots-on-the-

ground, to ensure accuracy of our targets, has imparted great enthusiasm.

We are so encouraged at

the potential of this property, the company now plans to run two teams operating separate drill rigs

simultaneously."

John Gravelle continues,

"We also are very much looking forward to the results from

Zoro's Dyke1 bulk sample, as this crucial catalyst, proving 6% battery-grade lithium hydroxide will be

an important milestone, and thus, helping propel shareholder value as we market to potential battery-

makers and important partners, globally."

Technical information relating to the Jean Lake Property contained in the news release has been

approved by Lindsay Bottomer, P. Geo, who is a "Qualified Person" within the meaning of National

Instrument 43-101 Standards of Disclosure for Mineral Projects.

Technical information relating to the Zoro Property contained in the news release has been approved by

Mark Fedikow, P. Geo, who is a "Qualified Person" within the meaning of National Instrument 43-101

Standards of Disclosure for Mineral Projects.

About Foremost Lithium Resource & Technology

Foremost Lithium is a resource company driven to become one of the first North American Companies

to produce high quality battery-grade lithium hydroxide domestically to fuel the electric vehicle and

battery storage market. Given the importance and global focus on increasing energy decarbonization,

especially with electric vehicles, the Company is hyper-focused on continued exploration and growth on

its four lithium properties: Jean Lake, Grass River, and Zoro, located in Snow Lake, Manitoba, and

Hidden Lake in the Northwest Territories. Foremost also holds its Winston Gold/Silver Project in New

Mexico, USA.

For Further Information Please Contact:

[email protected]

Foremost Lithium Resource &Technology

1 604 330-8067

Follow Us and Contact Us on Social Media:

Twitter:

@foremostlithium

Linkedin:

https://www.linkedin.com/company/foremost-lithium-resource-technology

Facebook:

https://www.facebook.com/ForemostLithium

Forward Looking Statements

All statements in this press release, other than statements of historical fact, are "forward-looking

information" with respect to Foremost within the meaning of applicable securities laws. Foremost

provides forward-looking statements for the purpose of conveying information about current expectations

and plans relating to the future and readers are cautioned that such statements may not be appropriate

for other purposes. By its nature, this information is subject to inherent risks and uncertainties that may

be general or specific and which give rise to the possibility that expectations, forecasts, predictions,

projections, or conclusions will not prove to be accurate, that assumptions may not be correct, and that

objectives, strategic goals and priorities will not be achieved. These risks and uncertainties include but

are not limited to market conditions, exploration findings, results, and recommendations, as well as

those risks and uncertainties identified and reported in Foremost's public filings under Foremost's

SEDAR profile at

www.sedar.com

. Although Foremost has attempted to identify important factors that

could cause actual actions, events or results to differ materially from those described in forward-looking

information, there may be other factors that cause actions, events or results not to be as anticipated,

estimated or intended. There can be no assurance that such information will prove to be accurate as

actual results and future events could differ materially from those anticipated in such statements.

Foremost disclaims any intention or obligation to update or revise any forward-looking information,

whether because of new information, future events or otherwise unless required by law.

1

https://sedar-filings-backup.thecse.com/00032046/1809051817578606.pdf

To view the source version of this press release, please visit

https://www.newsfilecorp.com/release/126876