Sunday, September 20, 2026
MiningNewsTerminal
Sunday, September 20, 2026 Admin

BFG.CN ·

Bam Bam Completes Reverse Circulation Drilling Program at the Majuba Hill Property in Nevada

Exploration Programs

1

Press Release August 13, 2020

Bam Bam Completes Reverse Circulation

Drilling Program at the Majuba Hill

Property in Nevada

VANCOUVER, BC — August 13, 2020 — Bam Bam Resources Corp. (CSE: BBR / OTC:

NPEZF / FSE: 4NPA) (“Bam Bam ” or the “Company”) is pleased to report that it

has completed the Reverse Circulation (RC) portion of the 2020 Phase 1 drilling

program at its flagship Majuba Hill Property (the "Property"), a copper, silver, gold

porphyry project located in Pershing County, Nevada.

The Company completed 3 ,000 feet (914m) in four vertical holes on the Majuba

Extension Zone. Copper oxides were observed in MHB-5 between 750 and 810 feet.

2

All samples have been submitted to the ALS Geochemistry prep facility in Elko,

Nevada for sample analysis. The submittal includes sample duplicates collected

during the drilling and copper, gold, and silver standard reference material , which

meets CIM Mineral Exploration Best Practice Guidelines.

Three core holes are planned for the Phase 2 drilling to drill 4,500 feet (1,371 m) in

the sulfide target zone below the oxide mineralization. The holes will step out from

sulfide copper mineralization intersected in MMX -24, test the high chargeability IP

zone that is coincident with the high-grade copper in historic drill holes, and test the

zone beneath the historic underground mine workings.

Mr. David Greenway reports: “I am pleased that we intersected the oxide copper

predicted from our geologic modeling and I am looking forward to getting the

analytical results from ALS Geochemistry. The deep core holes planned for Phase 2

will help us outline the large scale mine potential that we think Majuba has.”

About Majuba Hill Property

The Majuba Hill Property encompasses 4,822 acres of surface and mineral rights that

includes 3 patented lode mining claims and 632 acres of privately-owned surface and

minerals. The property is easily accessed via 23 miles of well -maintained dirt roads

leading from U.S. Interstate 80.

Quality Assurance/Quality Control ("QA/QC") Measures, Chain of Custody

The Company has a QA/QC program using best industry practices at the Majuba Hill

Project. Drill samples are delivered by the company consulting geologist to the secure

warehouse facility in Elko, Nevada. Drill core samples are sawn in half lengthwise and

one half is placed in labeled cloth sample bags. RC and core samples are then

transported directly to the ALS Sample Prep Facility in Elko, Nevada. ALS will then

transport the prepared pulps to their analytical lab in Reno, Nevada or Vancouver,

B.C. All samples are analyzed for copper, gold, silver, and 31 other elements. Gold is

determined by ALS method Au-AA23 which is a fire assay with an AAS finish on a 30-

gram split. Copper, silver and the remaining 31 elements are determined by ALS

method ME-ICP61 which is a four-acid digestion and ICP-AES assay. Approximately

5% of the submitted samples are copper- gold-porphyry commercial standard

reference material pulps, which are inserted in the analytical sample sequence. The

sample rejects and remaining pulps will be retrieved from ALS.

Qualified Persons

The scientific and technical information contained in this news release has been

reviewed by E.L. "Buster" Hunsaker III, CPG 8137 , a non- independent consulting

geologist who is a "Qualified Person" as such term is defined under National

Instrument 43-101 - Standards of Disclosure for Mineral Projects ("NI 43- 101").

3

About Bam Bam Resources Corp.

Bam Bam Resources Corp. (CSE: BBR / OTC: NPEZF / FSE: 4NPA) is engaged in the

identification, review and acquisition of latter stage copper and copper/gold assets.

With its flagship project being Majuba Hill copper gold project located 156 miles

outside Reno, Nev ada, USA. Management has been mandated to focus on safe,

mining friendly jurisdictions and government regulations supportive of mining

operations.

Neither the Canadian Securities Exchange nor its Market Regulator (as that term is

defined in the policies of the Canadian Securities Exchange) accepts responsibility

for the adequacy or accuracy of this release.

On Behalf of the Board of Bam Bam Resources Corp.

“David Greenway”

David C. Greenway

President & CEO

For further information, please contact:

E:[email protected]

P: (604) 318-0114

Forward-Looking Statements

This news release contains certain statements that may be deemed "forward-looking" statements. Forward looking

statements are statements that are not historical facts and are generally, but not always, identified by the words

"expects", "plans", "anticipates", "believes", "intends", "estimates", "projects", "potential" and similar expressions, or

that events or conditions "will", "would", "may", "could" or "should" occur. Although Bam Bam Resources Corp. believes

the expectations expressed in such forward-looking statements are based on reasonable assumptions, such

statements are not guarantees of future performance and actual results may differ materially from those in forward

looking statements. Forward looking statements are based on the beliefs, estimates and opinions of Bam Bam

Resources Corp. management on the date the statements are made. Except as required by law, Bam Bam Resources

Corp. undertakes no obligation to update these forward-looking statements in the event that management's beliefs,

estimates or opinions, or other factors, should change.

###