Sunday, September 20, 2026
MiningNewsTerminal
Sunday, September 20, 2026 Admin

EMPS.CN ·

Emp Metals Discovers Record Lithium in Brine Concentrations – up to 259 Mg/L at Viewfield

Exploration Programs

Tel: 604-689-7422 208A - 980 West 1st Street, North Vancouver, BC V7P 3N4

EMP METALS DISCOVERS RECORD LITHIUM IN BRINE

CONCENTRATIONS – UP TO 259 MG/L AT VIEWFIELD

Vancouver, British Columbia, February 21, 2023 – EMP Metals Corp. (CSE: EMPS) (OTCQB:

EMPPF) (“EMP Metals” or the “Company”) is pleased to announce the successful drilling and a

multi-layer perforation and swab test of a wellbore strategically located on of Hub City Lithium

Corp.’s Subsurface Crown Mineral Dispositions located in the Viewfield Area of Saskatchewan.

Third-party laboratory testing returned lithium concentrations in the Duperow formation of up

to 259 mg/l (the “Test Results”) (For Detailed Test Results refer to Figure 1). According to public

records, these Test Results are the highest lithium concentrations recorded in a brine in Canada

to date.

Test Results

Target Duperow

Interval

Average Porosity

(%)

Zone Thickness

(m)

Lithium

Concentration

(mg/l)

Wymark E 14.5 3.6 220

Wymark D 20.4 10.6 259

Wymark C 14.1 10.29 167

Wymark B 16.2 16.41 98

Wymark A 14 8.9 94

Saskatoon A 14 10.6 145

Note: Independent laboratory testing was conducted by Isobrine Solutions (Edmonton, Alberta)

Rob Gamley, EMP CEO commented, “The results of the Viewfield 2-22 well are nothing short of

incredible. The elevated lithium concentrations and high flow rates across six zones make this a

very exciting lithium brine well for our joint venture and for lithium exploration and development

in Canada. Based on public data these are the highest lithium concentrations tested in Canada

to date. Seeing such high lithium concentrations in six zones provides us with a second

prospective project area for development alongside the previously announced multi-zone

Mansur Project.”

Tel: 604-689-7422 208A - 980 West 1st Street, North Vancouver, BC V7P 3N4

Flow Test Results

High volume ESP flow test 1: December 14th to 16th. Combined perforations from the Wymark

D, E and F zones from 1820m to 1844m was flow tested for 41 hours at an average rate of 12.7

m3/hr or 304 m3/day. The test resulted in a post cleanup 24 sample average of 215.3 mg/l

High volume ESP flow test 2: December 27th to 29th. Combined perforations from all zones from

1820m to 1911m were flow tested for 54.5 hours at an average rate of 23 m3/hr or 550 m3/day.

The test resulted in a post clean up three sample test averaging 204.5 mg/l.

Next Steps

The Company will drill additional test wells within the area as part of its continued evaluation.

These high lithium concentrations in six target intervals suggest the potential for a six-layer

lithium brine project. Further work will be done to identify surface drilling pads large enough to

allow for the production of multiple horizontal wellbores within the pilot project area.

Resource Estimation Report

A 43-101 resource report (“Resource Report”) for the Mansur Area which has now be expanded

to include the Viewfield area and is expected to be completed during Q1 2023. In parallel with

the Resource Report the Company has begun working on the Mansur development plan and

Preliminary Economic Assessment (“PEA”) which it expects to complete during Q2 2023. The

company plans on doing further drilling at Viewfield as part of the data gathering towards a PEA

at Viewfield expected to be completed later in the year.

Joint Venture

EMP Metals and ROK Resources Inc. jointly own Hub City Lithium, holder of 37 permits totaling

212,633 net acres (86,050 hectares) of Subsurface Crown Mineral Dispositions in Saskatchewan.

ROK has a twenty-five (25%) percent interest in Hub City Lithium, with the balance owned by

EMP Metals Corp. ROK is the manager of operations of Hub City Lithium.

Qualified Person

The technical content of this news release has been reviewed and approved by Greg Bronson,

P. Geo., a qualified person for the purpose of National Instrument 43-101.

Quality Control and Quality Assurance

Swab tests were performed by Red Hawk Well Servicing, with the use of a downhole mechanical

swabbing string and associated surface equipment. Swabbing and ESP Flow testing volumes

were monitored by Test Pro Energy Services. The Company uses industry standard quality

assurance and quality control protocols in carrying out its exploration activities.

About EMP Metals

Tel: 604-689-7422 208A - 980 West 1st Street, North Vancouver, BC V7P 3N4

EMP Metals is a Canadian-based exploration company focused on the acquisition and exploration

of mineral projects with significant development potential. Its current portfolio of lithium bri ne

properties, in partnership with ROK Resources Inc., consists of 37 permits totaling 212,633 acres

(86,050 hectares) of Subsurface Crown Mineral Dispositions in the Williston basin of Southern

Saskatchewan.

For more information, please go to the Company’s website at www.empmetals.com or contact:

Rob Gamley, President & CEO

Phone: 604-689-7422

Email: [email protected]

Forward-Looking Statements

Information set forth in this news release contains forward-looking statements that are based on

assumptions as of the date of this news release. These statements reflect management's current

estimates, beliefs, intentions and expectations. They are not guarantees of future perfor mance.

EMP Metals cautions that all forward -looking statements are inherently uncertain, and that

actual performance may be affected by a number of material factors, many of which are beyond

EMP Metals’ control. Such factors include, among other things: risks and uncertainties relating

to EMP Metals' limited operating history, ability to obtain sufficient financing to carry out its

exploration and development objectives on its mineral properties, obtaining the necessary

permits to carry out its activities and the need to comply with environmental and governmental

regulations. Accordingly, actual and future events, conditions and results may differ materially

from the estimates, beliefs, intentions and expectations expressed or implied in the forward -

looking information. Except as required under applicable securities legislation, EMP Metals

undertakes no obligation to publicly update or revise forward-looking information.

Neither the Canadian Securities Exchange (“CSE”) nor its Regulation Services Provider ( as that

term is defined in the policies of the CSE) accepts responsibility for the adequacy or accuracy of

this news release.