Sunday, September 20, 2026
MiningNewsTerminal
Sunday, September 20, 2026 Admin

SAND.CN ·

Silver Sands Commences Phase II Drill Program at the Virginia Silver Project, Argentina

Exploration Programs

Suite 830 – 1100 Melville Street, Vancouver, B.C. Canada, V6E 4A6

Tel: +1 604 786-7774 E-mail: [email protected]

www.silversandscorp.com

www.mirasolresources.com

Silver Sands Commences Phase II Drill Program at the Virginia Silver Project, Argentina

VANCOUVER, BC, February 02, 2021 —Silver Sands Resources Corp. (CSE: SAND) (OTCQB: SSRSF) is

pleased to announce the 2,700m Phase II drill program at the Virginia Silver Project, located in Santa

Cruz province, Argentina has commenced. This program will follow up and build on the successful

2,831m Phase I drill program completed in November.

Expanding Conceptual Open Pit Structures

A key aspect of Phase II drilling is to continue the expansion of the 2016 mineral resource by drilling gaps

and extensions of the principal veins comprising the resource. The 2016 resource contains 11.9 million

indicated ounces of silver at 310 g/t and 3.1 million inferred ounces of silver at 207 g/t within seven

conceptual open pits. Previous drilling intercepted mineralization at depths from surface to 150 metres.

Source: Amended Technical Report, Virginia Project, Santa Cruz Province, Argentina -- Initial Silver Mineral

Resource Estimate, with an effective date of Oct. 24, 2014, and a report date of Feb. 29, 2016.

Phase I drilling expanded the lateral extent of mineralization of two of those structures, the Ely Central

and Martina SW with significant intercepts that included:

• Ely Central EC-DDH-01 – 233.54 g/t Ag over 9.25m, from 92.75m to 102m

o Including 441.71 g/t Ag over 4.5m, from 94.55m to 99.05m

• Martina SW MSE-DDH-01 – 198.51 g/t Ag over 33.50 from, 79.5m to 113m

o Including 316.82 g/t Ag over 17.7m, from 85.8m to 103.5m

Reported interval lengths are down hole widths and not true widths

“We were very pleased to encounter significant intersections in 2 of our first 6 holes as we looked at

increasing the lateral extent of mineralization at both Ely Central and Martina SW. The Phase II program

is further targeting both of these zones, along with some of the other principal veins and new targets

generated from the Phase I trenching and IP programs,” commented Silver Sands’ CEO, Keith Anderson.

“We are fully funded to carry out this program and also to significantly expand this program based on

favourable results,” he continued. “Speaking of results, we expect to release the results from the

remaining 12 holes from Phase I in the near future once the final geochemical results have been received

and QA/QC has been fully completed and approved.” he concluded.

Suite 830 – 1100 Melville Street, Vancouver, B.C. Canada, V6E 4A6

Tel: +1 604 786-7774 E-mail: [email protected]

www.silversandscorp.com

Adding New Conceptual Open Pit Structures

The Phase II drilling program will continue testing gaps and extensions of the principal veins at the

Martina NW and SW, Magi, Julia South Extension, Naty Extension and Ely Central targets. In addition,

holes will follow-up and drill down dip and adjacent to some of the better intersections returned during

the Phase I program at both Martina and Ely. The aim of 2021 exploration remains extending known

mineralization and testing new targets to increase the 2016 Virginia Resource with an updated resource

estimate targeted for late H2 2021.

Figure 1: Virginia - Plan map with the Phase II drill collar location

https://www.silversandscorp.com/images/news/SAND_20210202-Fig1.jpg

Expanding Drilling to Target the Santa Rita Gold/Silver Target

Previous exploration undertaken on the property in the northern section of the property, 15 kilometres

northwest of the Virginia Silver Project defined an open ended, northwest oriented, 3,500m long by

500m wide trend of epithermal Ag mineralization in breccias veins from centimetres to 10m wide and

an associated sheeted quartz vein stockwork (see Mirasol October 7, 2005 News Release). Three holes

from this Phase will be directed at the Santa Rita target to test a recent re-interpretation of previous

Suite 830 – 1100 Melville Street, Vancouver, B.C. Canada, V6E 4A6

Tel: +1 604 786-7774 E-mail: [email protected]

www.silversandscorp.com

exploration and drilling data suggests drilling was targeted too high up in the system and targeted too

far in the footwall of the trend to reach the favourable hanging wall side of the trend.

The technical content of this news release has been reviewed and approved by R. Tim Henneberry, P.Geo.

(BC) a Qualified Person under NI 43-101 and a Director of Silver Sands.

Silver Sands Resources Announces DTC Eligibility Approval

The Company is pleased to confirm that the Company’s common shares have been approved for

eligibility by the Depository Trust Company (DTC) thus allowing for cost effective electronic settlement

and clearing of its common shares in the United States under its OTCQB symbol, SSRSF.

DTC, the world’s largest post-trade financial services company is a subsidiary of the Depository Trust &

Clearing Corporation (DTCC), a U.S. company that manages the electronic clearing and settlement of

publicly traded companies. Securities that are eligible to be electronically cleared and settled through

DTC are considered to be “DTC eligible.

Silver Sands’ CEO, Keith Anderson, commented: "Obtaining DTC eligibility is an important milestone for

the Company. DTC eligibility ensures a seamless process of trading and settlement in order to enhance

liquidity of the Company's common shares in the United States. With Silver Sand’s shares now traded

electronically, existing shareholders benefit from greater liquidity over time and execution speeds, while

new investors are far less restricted from participating in the Company’s stock."

Detour Lake Property Termination

The Company has decided not to proceed with its Detour Lake Property option agreement and has

advised the Optionor of the termination.

About Silver Sands Resources Corp.

Silver Sands is a well-financed, Canada-based company engaged in the business of mineral exploration

and the acquisition of mineral property assets in mining-friendly jurisdictions. Its objective is to locate

and develop economic precious and base metal properties of merit. Its key asset is the Virginia silver

project, located in the mining-friendly Santa Cruz state of Argentina.

For further information, please contact:

Keith Anderson

Chief Executive Officer, Director (604) 786-7774

Forward Looking Statements: The information in this news release contains forward looking statements

that are subject to a number of known and unknown risks, uncertainties and other factors that ma y

Suite 830 – 1100 Melville Street, Vancouver, B.C. Canada, V6E 4A6

Tel: +1 604 786-7774 E-mail: [email protected]

www.silversandscorp.com

cause actual results to differ materially from those anticipated in our forward -looking statements.

Factors that could cause such differences include: changes in world commodity markets, equity markets,

costs and supply of materials relevant to the mining industry, change in government and changes to

regulations affecting the mining industry and to policies linked to pandemics, social and environmental

related matters. Forward-looking statements in this release include statements regarding future

exploration programs, operation plans, geological interpretations, mineral tenure issues and mineral

recovery processes. Although we believe the expectations reflected in our forward-looking statements

are reasonable, results may vary, and we cannot guarantee future results, levels of activity, performance

or achievements. Silver Sands disclaims any obligations to update or revise any forward -looking

statements whether as a result of new information, future events or otherwise, except as may be

required by applicable law.

The Canadian Securities Exchange has not approved nor disapproved the contents of this news release.