Saturday, September 19, 2026
MiningNewsTerminal
Saturday, September 19, 2026 Admin

KIP.V ·

Kiplin Metals Announces Summer 2025 Field Program at Lloyd Lake Uranium Project

Exploration Programs

NEWS RELEASE

KIPLIN METALS ANNOUNCES SUMMER 2025 FIELD PROGRAM AT

LLOYD LAKE URANIUM PROJECT

March 31st, 2025 – Kiplin Metals Inc. (the “Company” or “Kiplin”) (TSX-V: KIP, FWB: 17G1) is pleased to

announce its summer 2025 field program for its wholly owned Lloyd Lake Uranium Project, located on the

southern lip of the Athabasca Basin in northern Saskatchewan.

The 2025 program calls for a property-wide investigation focused on the project’s principal exploration

target, LLTZ1: a northeast-trending conductive anomaly coincident with a magnetic break that has been

interpreted as a fault or fold. The Company’s exploration efforts this season are designed to define and

qualify potential diamond drill targets on LLTZ1 in preparation for a future drill campaign.

The program will include ground magnetic mapping and radiometric mapping, as well as general

prospecting across the property. In addition, Kiplin will deploy approximately 200 radon detection

capsules across the target area. Radon gas, a key daughter product of uranium decomposition, is a highly

effective vector for identifying subsurface uranium mineralization.

Background on LLTZ1

LLTZ1 was first identified in a large-scale regional exploration program conducted by the Western

Athabasca Syndicate in 2013. Spanning approximately 4 kilometers across the Lloyd Lake Project, the

target has been evaluated using a range of investigative techniques, including a VTEM (Versatile Time

Domain Electromagnetic) survey, a stream sediment survey, and a radon gas emission survey. In 2022,

Kiplin advanced the project by conducting an induced polarization (IP) survey over the southernmost

portion of LLTZ1, confirming key geophysical features and enhancing the understanding of the target zone.

Kiplin is committed to conducting all exploration activities using environmentally responsible practices

and in full consultation with local indigenous groups and community stakeholders. The Company

recognizes the importance of building respectful, transparent relationships and strives to ensure its

operations benefit both the environment and local communities.

Further details, including scheduling and logistics, will be provided as the 2025 field season approaches.

Qualified Person

Dr. Peter Born, PGeo, a director of the Company, is the designated qualified person as defined by National

Instrument 43-101 and is responsible for, and has approved, the technical information contained in this

release.

About Kiplin Metals Inc.

https://www.kiplinmetals.com/Kiplin Metals Inc. is a mineral exploration company. We create value for

our shareholders by identifying and developing highly prospective mineral exploration opportunities. Our

strategy is to advance our projects from discovery to production, allowing Kiplin to achieve exceptional

shareholder value through the entire life-cycle of mining.

Lloyd Lake Uranium Project.

The Lloyd Lake Uranium Project spans 6,177 hectares and is situated 27 kilometers south of the southern

boundary of the Athabasca Basin. The project has undergone extensive exploration programs, most

notably in 2022, with investigations including sediment sampling, airborne magnetics, and ground IP

surveys. The key exploration zone is an 8 kilometer corridor characterized by a magnetic low which aligns

with a structural break, a locale where anomalous radioactivity has been detected. Access to the project

is optimal, facilitated by a provincial highway and well-maintained roads and trails.

For further information, contact the Company at [email protected] or 613-715-2020 or visit the

Company’s website at www.kiplinmetals.com.

On behalf of the Board,

Kiplin Metals Inc.

“Peter Born”

Director

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in policies of the TSX Venture

Exchange) accepts responsibility for the adequacy or accuracy of this release.

This news release may include forward-looking statements that are subject to risks and uncertainties. All statements within, other

than statements of historical fact, are to be considered forward looking. Although the Company believes the expectations

expressed in such forward-looking statements are based on reasonable assumptions, such statements are not guarantees of

future performance and actual results or developments may differ materially from those in forward-looking statements. There

can be no assurances that such statements will prove accurate and, therefore, readers are advised to rely on their own evaluation

of such uncertainties. We do not assume any obligation to update any forward-looking statements except as required under the

applicable laws.