: Aberdeen Project Drill Program to Start in July
Forum
-
Baselode
: Aberdeen Project Drill Program to Start in July
JUNE 25, 2025
With Forum
-
Baselode
Merger Now Announced, Drilling Starts Immediately
Camp mobilization underway on Aberdeen Project
Drilling to include 2 drills and approximately 7,000 m
Vancouver, British Columbia
--
(Newsfile Corp.
-
June 25, 2025)
-
Baselode
Energy Corp.
(TSXV: FIND)
(OTCQB: BSENF)
("
Baselode
") and Forum Energy Metals Corp.
(TSXV: FMC) (OTCQB: FDCFF) ("
Forum
" ,
together with
Baselode
, the "
Parties
") are pleased to announce that we are opening our exploration camp
on the Aberdeen Project in Nunavut and plan to initiate a 2
-
drill diamond drill program in July (Figure 1).
Key Highlights
Exploration Plan
: 18
-
25 drill holes planned and up to 7,000 m
Target Areas:
10 high
-
priority target areas, both with and without sandstone cover; first targets
tested will be Loki and Bjorn
"We are excited to begin our upcoming drill program on the Aberdeen Project. Our focus this year is to
explore the wider project area by testing up to 10 high
-
priority target areas for additional uranium
mineralized zones. Our plan is to showcase the urani
um discovery potential of the project area by testing
numerous blue
-
sky targets. Our drill targeting will focus on strong gravity anomalies along prospective
fault trends both with and without sandstone cover, " stated Rebecca Hunter, President, CEO and Dir
ector
of Forum and upcoming Geiger Energy.
James Sykes, President and Chief Executive O icer of
Baselode
, stated: "We're excited to be part of this
drill program on Aberdeen. Working together with Forum, we believe our combined e orts and ideas will
expedite a discovery on Aberdeen. We are encouraged with the technical details of the project as many
previou
s drill holes have highlighted robust hydrothermal fluid alteration systems that are fertile with
uranium. The Loki and Bjorn areas that Forum have defined are some of the first areas that we de
emed to
be very prospective, too. "
Aberdeen Program Details
Up to 7,000 m in 18
-
25 drill holes is planned at Aberdeen (Figure 2), depending on results. Targets and
target criteria are as follows:
i.
Sandstone
-
covered targets (i.e. traditional unconformity targets) such as Loki, Bjorn, Thor,
Squiggly River and Nymeria
-
Loki and Bjorn will be the first 2 areas tested. Drilling in 2024 at Loki
contained uranium values 30x background and substantial clay
alteration in the sandstone
ii.
Basement
-
only targets including Lobster, Tarzan, Willow, Apollo and Starbuck; three historical drill
holes at Tarzan intersected significant clay alteration and elevated boron
iii.
Drill targets are selected and prioritized based on the presence of gravity low anomalies in concert
with major ENE
-
and NE
-
trending faults, as well as any nearby drill or surface data that show
prospective fault structures, clay or geochemical signatures
The 2025 program is focused on finding additional high
-
grade discoveries to build scale and enhance the
discovery potential in the district. Ground magnetic surveys are planned on 6 to 10 of the target areas to
help refine the main fault zones within the d
rill areas.
The exploration camp is currently being opened, and drilling is expected to be underway shortly after
camp is operable.
Figure 1: Project location map.
To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/6412/256741_c9528e194407e9df_001full.jpg
Figure 2: Project map with 2025 target areas overlying residual gravity image.
To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/6412/256741_c9528e194407e9df_002full.jpg
About
Baselode
Baselode
controls 100% of approximately 231,378 hectares for exploration in the Athabasca Basin area
of northern Saskatchewan, Canada. The land package is free of any option agreements or underlying
royalties.
Baselode
discovered the ACKIO near
-
surface, uranium prospect in September 2021. ACKIO measures
greater than 375 m along strike, greater than 150 m wide, comprised of at least 9 separate uranium Pods,
with mineralization starting as shallow as 28 m and 32 m beneath
the surface in Pods 1 and 7,
respectively, and down to approximately 300 m depth beneath the surface with the bulk of mineralization
occurring in the upper 120 m. ACKIO remains open at depth, and to the north, south and east.
Baselode
's Athabasca 2.0 exploration thesis focuses on discovering near
-
surface,
basement
-
hosted,
high
-
grade uranium orebodies outside the Athabasca Basin. The exploration thesis is further
complemented by
Baselode
's preferred use of innovative and well
-
understood geophysical methods to
map deep structural controls to identify shallow targets for diamond drilling.
About Forum
Forum Energy Metals is focused on the discovery of high
-
grade, unconformity
-
related uranium deposits
in
Canada's premier uranium jurisdictions: the Athabasca Basin in Saskatchewan and the Thelon Basin in
Nunavut. The Company holds a significant land position with 153,838 hectares in Saskatchewan
-
primarily within the Athabasca Basin
-
and 95,519 hectares in
Nunavut's Thelon Basin.
Forum's flagship asset is the Aberdeen Project in Nunavut, which hosts the high
-
grade Tatiggaq and
Qavvik uranium discoveries. Tatiggaq is a basement
-
hosted prospect defined over a 300
-
metre strike
length, comprising multiple steeply dipping, ENE
-
trending
mineralized lenses located at depths between
80 and 180 metres. Notable intercepts include 2.25% U₃O₈ over 11.1 metres
1
, highlighting a high
-
grade
core within the system. To date, only 500 metres of a 1,500
-
metre
-
long anomaly has been drill tested.
Qavvik is a similarly styled, basement
-
hosted prospect characterized by steeply dipping, ENE
-
trending
mineralized lenses acros
s a 100 x 100 metre area, from surface down to 400 metres depth. Both zones
require further detailed drilling to determine the full extent of mineralization.
In addition to these discoveries, the Aberdeen Project hosts over 50 high
-
priority exploration targets,
many of which exhibit strong alteration and anomalous geochemistry from limited historical drilling
-
or
remain entirely untested.
Qualified Person Statement
For Forum Energy Metals Corp: The technical information contained in this news release has been
reviewed and approved by Rebecca Hunter, P .Geo, President & CEO of Forum Energy Metals Corp., a
Qualified
Person, as defined in "National Instrument 43
-
101, Standards of Disclosure for Mineral
Projects. "
ON BEHALF OF THE BOARD OF DIRECTORS OF
BASELODE
ENERGY CORP .
"James Sykes"
James Sykes
CEO, President, & Director
Email:
Phone: 416
-
644
-
1567
ON BEHALF OF THE BOARD OF DIRECTORS OF
FORUM ENERGY METALS CORP .
"Rebecca Hunter"
Rebecca Hunter, PhD. P . Geo.
President & CEO
Phone: 604
-
630
-
1585
Cautionary Statement
Certain information in this news release is considered forward
-
looking within the meaning of certain
securities laws and is subject to important risks, uncertainties and assumptions. This forward
-
looking
information includes, among other things, informatio
n with respect to
Baselode
's and Forum's beliefs,
plans, expectations, anticipations, estimates and intentions. The words "may" , "could" , "should" , "would" ,
"suspect" , "outlook" , "believe" , "anticipate" , "estimate" , "expect" , "intend" , "plan" , "target" and
similar
words and expressions are used to identify forward
-
looking information. The forward
-
looking information
in this news release describes
Baselode
's and Forum's expectations as of the date of this news release.
Forward
-
looking statements in this news release include, but are not limited to statements with respect
to the anticipated timing for the meeting of Forum shareholders and closing of the Arra
ngement, the
anticipated consideration to be issued by
Baselode
and received by Forum shareholders, and
the
satisfaction of closing conditions including: (i) required Forum shareholder approval; (ii) necessary court
approval in connection with the Arrangement; (iii) certain termination rights available to the Parties under
the Agreement; (iv) obtaining the necessary approvals from the TSX
-
V; and (v) other closing conditions as
set forth in the Arrangement Agreement.
The results or events anticipated or predicted in such forward
-
looking information may di er materially
from actual results or events. Material factors which could cause actual results or events to di er
materially from such forward
-
looking information i
nclude, among others, risks arising from general
economic conditions; adverse industry events; inability to realize anticipated synergies; future legislative
and regulatory developments; inability to access su icient capital from internal and external sou
rces,
and/or inability to access su icient capital on favourable terms; income tax and regulatory matters; the
ability of
Baselode
and Forum to implement their business strategies; competition; currency and interest
rate fluctuations and other risks. Readers are cautioned that the foregoing list is not exhaustive.
Baselode
and Forum caution that the foregoing list of material factors is not exhaustive. When relying on
forward
-
looking information to make decisions, investors and others should carefully consider the
foregoing factors and other uncertainties and potential even
ts.
Baselode
and Forum have assumed a
certain progression, which may not be realized. It has also assumed that the material factors referred to
in the previous paragraph will not cause such forward
-
looking information to di er materially from actu
al
results or events. However, the list of these factors is not exhaustive and is subject to change and there
can be no assurance that such assumptions will reflect the actual outcome of such items or factors.
THE FORWARD
-
LOOKING INFORMATION CONTAINED IN THIS NEWS RELEASE REPRESENTS THE
EXPECTATIONS OF
BASELODE
AND FORUM AS OF THE DATE OF THIS NEWS RELEASE AND,
ACCORDINGLY , IS SUBJECT TO CHANGE AFTER SUCH DATE. READERS SHOULD NOT PLACE UNDUE
IMPORTANCE ON FORWARD
-
LOOKING INFORMATION AND SHOULD NOT RELY UPON THIS
INFORMATION AS OF ANY OTHER DATE. WHILE
BASELODE
AND FORUM MAY ELECT TO, IT DOES NOT
UNDERTAKE TO UPDATE THIS INFORMATION AT ANY PARTICULAR TIME.
Neither the TSXV nor its Regulation Services Provider (as that term is defined in the policies of the
TSXV) accepts responsibility for the adequacy or accuracy of this release.
________________________
1
Refer to Forum News Release dated
September 12, 2023
, titled "Forum intersects 2.25% over 11.1
metres on the Thelon Basin Uranium Project"