Sunday, September 20, 2026
MiningNewsTerminal
Sunday, September 20, 2026 Admin

USGD.CN ·

American Pacific Completes its 2024 Drill Program at Palmer Copper-Zinc VMS Project in Southeast Alaska

Exploration Programs

American Pacific Completes its 2024 Drill Program at Palmer Copper-

Zinc VMS Project in Southeast Alaska

Vancouver, British Columbia /August 29, 2024 – American Pacific Mining Corp (CSE: USGD / OTCQX:

USGDF / FWB: 1QC) (“American Pacific” or “the Company”) is pleased to announce the completion of a

drill program at its Palmer Copper-Zinc VMS Project (“Palmer”) in Southeast Alaska. The 2024 program

was part of a planned CAD $17.5 million (USD $12.8 million) exploration and development budget funded

by a joint venture partnership between Dowa Metals & Mining Alaska Ltd. (“Dowa”) and American Pacific

(see March 25, 2024 news release).

Palmer Project Update

The 2024 drill program included a total of 6,035.9 meters (“m”) (19,650 feet) in nineteen (19) drill holes

including three (3) drill holes (125.8 meters; 410 feet) that were recollared. The program was expanded

from an originally planned fourteen (14) drill holes based on positive visual observations and real-time

modeling updates.

This year’s drilling program focused on building upon the results of last year’s campaign where the four

most significant copper intercepts ever drilled at Palmer were reported earlier this year, including 43.8 m

of 6.54% copper (“Cu”), 3.15% zinc (“Zn”), 0.42 grams per tonne (“g/t”) gold (“Au”) and 27.97 g/t silver

(“Ag”) (8.22% copper equivalent (“CuEq”)) (see January 10, 2024 news release for full details).

The drill program was designed to continue expanding the known extent of the high -grade copper

mineralization of the South Wall Zone 1 and Zone 2 and testing prospective alteration areas. Thirteen (13)

drill holes (4,876.8 meters; 16,000 feet) tested the structural controls and extensions to the high-grade

copper and zinc mineralized trends.

The program also include d a series of exploration drillholes to test the nearby North Wall Target. The

North Wall Target represents a potential fault offset extension of the South Wall mineralization. Three

(3) drill holes were completed for 1,033.3 meters (3,390 feet).

A total of 1,353 samples have been submitted for multi-element analysis with all assay results pending.

“We are delighted to have completed another successful exploration program with zero incidents or

injuries throughout the summer. We look forward to publishing results in the coming weeks and months.”

commented Peter Mercer, Senior VP of Advanced Projects. “We’d like to thank our staff and contractors

for their outstanding efforts in delivering a safe and efficient field program, ahead of schedule. We have

seen significant improvements in diamond drilling productivity year over year, which will have a significant

impact on the planning and implementation of future programs.”

Figure 1: Tamarack Geological Services logging core at the newly constructed logging facility

Figure 2: The Northern Lights providing a spectacular show above Canada Pad

Qualified Person Statement

The technical information in this news release regarding the Palmer Project has been reviewed and

approved by Michael Vande Guchte, P.Geo., V ice President of Exploration for the Palmer Project and a

Qualified Person (QP) as defined by National Instrument 43 -101, Standards of Disclosure for Mineral

Projects.

About American Pacific Mining Corp.

American Pacific Mining Corp. is a precious and base metals explorer and developer focused on

opportunities in the Western United States. The Company has two flagship assets: the Palmer Project, a

Volcanic Massive Sulphide-Sulphate (VMS) project in Alaska, under joint-venture partnership with Dowa

Metals & Mining, owner of Japan’s largest zinc smelter; and the Madison Project, a past-producing copper-

gold project in Montana. For the Madison transaction, American Pacific was selected as a finalist in both

2021 and 2022 for ‘Deal of the Year’ at the S&P Global Platts Metals Awards, an annual program that

recognizes exemplary accomplishments in 16 performance categories.

Also, in American Pacific’s asset portfolio are high-grade, precious metals projects located in key mining

districts in Nevada, USA, including the Ziggurat Gold Project and the Tuscarora Gold-Silver District. The

Company’s mission is to grow by the drill bit, strategic partnerships, and M&A.

On behalf of the American Pacific Mining Corp Board of Directors:

Warwick Smith, CEO & Director

672.339.9906

Corporate Office: Suite 910 – 510 Burrard Street

Vancouver, BC, V6C 3A8 Canada

Investor relations contact:

Kristina Pillon, High Tide Consulting Corp.

604.908.1695 / [email protected]

Media relations contact:

Adam Bello, Primoris Group Inc.

416.489.0092 / [email protected]

Full disclosure can be found in our NI 43-101 Technical Report for the Palmer Project at

www.americanpacificmining.com.

The Canadian Securities Exchange has neither approved nor disapproved the contents of this news

release.